MOH. GUFRON
Quality Control Staff
Doc. No. 02/TRNSPWR/GTS/V/1 PT.
MINATION Gamatara
Transocean Owner
Revision -
Shipyard Project
Part
Date 5-May-18
OTHER ( )
OTHER ( )
OTHER ( )
WELD PART
OTHER ( )
LEAK TEST
DIESEL FUEL+LIME
TYPE OF
MATERIAL REMARK
DISCOUNTINUITY
ABS Heat no.SK 24395
ABS Heat no.SK 24395
ABS Heat no.SK 24395
ABS Heat no.SK 24395
TOP SIDE FRAME 0-1 CAPING 3mm TOP SIDE FRAME 2-3 CAPI
TRANSOME CAPING 3mm TRANSOME CAPING 3mm
EPORT PT. INSPECTION W
Gamatara
: Graving Dock C Transocean Owner : PT. Trans Power Marine
: 02/TRNSPWR/GTS/V/18 Shipyard Project : FC Joshua
: 05/05/2018 Part : Replate Lambung
TOP SIDE FRAME 0-1 NO LEAK TOP SIDE FRAME 3-4 NO LEAK
TRANSOME NO LEAK TRANSOME NO LEAK
TION WELDING REPORT
: Graving Dock C
: 02/TRNSPWR/GTS/V/18
: 05/05/2018
LDING PROCESS
PT. INSPECTION WELDING REPORT
Gamatara
Costumer : PT. INDONESIA POWER UP. SURALAYA Location : UNIT 5 UP SURALAYA
Transocean
Project : REPAIR BOILER TUBING Doc. No : 01/IWR/UBPSLA/IX/16
Shipyard
Part : Erosion Shield Tube 88 Date : 29-10-2016
SKETCH
5 UP SURALAYA
R/UBPSLA/IX/16
-2016