Sei sulla pagina 1di 20

PT.

INSPECTION WELDING EXAMINATION


Gamatara
Transocean
Shipyard REPORT
OWNER : PT. TRANS POWER MARINE Date of Inspection
REPORT

SURFACE CONDITION √ WELDED GROUND FLUSH

STAGE OF EXAM √ AFTER WELDING AFTER HYDROSTATIC

WELDING PROCESS GTAW √ SMAW

SCOPE OF BASE METAL BACK CHIPING √

EXAMINATION √ EDGE PREP REPAIRED WELD

CURRENT 70-110 √ SMAW √ FILLER METAL 4 mm √


Ampere
SKL-SPI AWS A5.1 ESAB E-6013 √

WELDING THICKNESS JUDGEMENT TYPE OF


INDICATION (MM) ACCEPTED REJECTED DISCOUNTINUITY
Transome 12 √
Top Side Frame 1-2 12 √
Top Side Frame 2-3 12 √
Top Side Frame 3-4 12 √
PREPARED BY,

MOH. GUFRON
Quality Control Staff
Doc. No. 02/TRNSPWR/GTS/V/1 PT.
MINATION Gamatara
Transocean Owner
Revision -
Shipyard Project
Part
Date 5-May-18

Date of Inspection : 04 Mei 2018


PHOTO BEFO

OTHER ( )

OTHER ( )

OTHER ( )

WELD PART

OTHER ( )

LEAK TEST

DIESEL FUEL+LIME

DWELL TIME : 45 MINUTES

TYPE OF
MATERIAL REMARK
DISCOUNTINUITY
ABS Heat no.SK 24395
ABS Heat no.SK 24395
ABS Heat no.SK 24395
ABS Heat no.SK 24395

TOP SIDE FRAME 0-4


CHECKED BY

F.Gunadi TOP SIDE FRAME 5-6


Quality Control Manager
INSPECTION WELDING REPORT
: PT. Trans Power Marine Location : Graving Dock C : UNIT 5 UP SURALAY
: FC Joshua Doc. No : 02/TRNSPWR/GTS/V/18 : 07/IWR/UBPSLA/IX/1
: Replate Lambung Date :05/05/2018 : 29-10-2016

PHOTO BEFORE WELDING PROCESS

TOP SIDE FRAME 0-4


TOP SIDE FRAME 5-6
PT. INSPECTION WELDING REPORT
Gamatara
Transocean Owner :PT. Trans Power Marine Location
Shipyard Project : FC Joshua Doc. No
Part : Replate Lambung Date

PHOTO MEASUREMENT WELDING PROCESS

TOP SIDE FRAME 0-1 CAPING 3mm TOP SIDE FRAME 2-3 CAPI
TRANSOME CAPING 3mm TRANSOME CAPING 3mm
EPORT PT. INSPECTION W
Gamatara
: Graving Dock C Transocean Owner : PT. Trans Power Marine
: 02/TRNSPWR/GTS/V/18 Shipyard Project : FC Joshua
: 05/05/2018 Part : Replate Lambung

OCESS PHOTO AFTER WELDING

DE FRAME 2-3 CAPING 3 mm TRANSOME


SOME CAPING 3mm TOP SIDE FRAME 0-1
INSPECTION WELDING REPORT PT.
Gamatara
ns Power Marine Location : Graving Dock C Transocean
hua Doc. No : 02/TRNSPWR/GTS/V/18 Shiard
e Lambung Date : 05/05/2018

TER WELDING PROCESS P

TRANSOME TOP SIDE FRAME


TOP SIDE FRAME 2-3 TRANSOME NO LE
INSPECTION WELDING REPORT
Owner : PT. Trans Power Marine Location : Graving Dock C
Project : FC Joshua Doc. No : 02/TRNSPWR/GTS/V/18
Part : Replate Lambung Date : 05/05/2018

PHOTO AFTER WELDING PROCESS

TOP SIDE FRAME 0-1 NO LEAK TOP SIDE FRAME 3-4 NO LEAK
TRANSOME NO LEAK TRANSOME NO LEAK
TION WELDING REPORT
: Graving Dock C
: 02/TRNSPWR/GTS/V/18
: 05/05/2018

LDING PROCESS
PT. INSPECTION WELDING REPORT
Gamatara
Costumer : PT. INDONESIA POWER UP. SURALAYA Location : UNIT 5 UP SURALAYA
Transocean
Project : REPAIR BOILER TUBING Doc. No : 01/IWR/UBPSLA/IX/16
Shipyard
Part : Erosion Shield Tube 88 Date : 29-10-2016

SKETCH
5 UP SURALAYA
R/UBPSLA/IX/16
-2016