ITP FOR BLASTING AND THERMAL SPRAY ALUMINIUM 27-Aug-19

MAR - GALVANIZED CHAIN 27-Aug-19


WELDING PROCEDURE SPECIFICATION 20 - WPS 27-Aug-19
WELDING PROCEDURE SPECIFICATION - 22 27-Aug-19
ITP INSTALLATION OF CATHODIC PROTECTION SYSTEM 27-Aug-19
NCR - FLANGE FACE DISCREPANCY ON MANWAY MH & BL. F 27-Aug-19
NCR - FLANGE FACE DISCREPANCY ON EQUIP. NOZZLES 27-Aug-19
NCR - FLANGE FACE DISCREPANCY ON EQUIP. NOZZLES 27-Aug-19
NCR - UNIT 213 HEATER - TRUNNION SUPPORTS WELDING 27-Aug-19
RADIOGRAPHY INSPECTION PROCEDURE 27-Aug-19
LIQUID PENETRANT INSPECTION PROCEDURE 27-Aug-19
HEAT TREATMENT PROCEDURE 27-Aug-19
QCP FERRITE CONTENT & FERRITE NUMBER MEASUREMENT 27-Aug-19
ITP FOR INSTALLATION OF SMALL POWER DISTB. SYSTEM 27-Aug-19
ITP FOR INSTALLATION OF AIR COMPRESSIOR 27-Aug-19
ITP FOR INSTALLATION OF AIR COOLED HEAT EXCHANGER 27-Aug-19
ITP INSTALLATION OF FIRE FIGHTING EQUIPMENT 27-Aug-19
ITP STRUCTURAL STEEL ERECTION WORKS 27-Aug-19
ITP STRUCTURAL STEEL ERECTION WORKS 27-Aug-19
ITP FOR INSTALLATION OF STATIC EQUIPMENT 27-Aug-19
ITP INSTALLATION INTERNAL TRAYS & OTHER AUXILIARY 27-Aug-19
MS FOR PNEUMATIC TESTING 27-Aug-19
ITP FABRICATION ERECTION & TEST AG UG WELDD PIPING 19-Aug-19

MAR - EVACUATION ROUTE SIGN 4-Sep-19


NCR - DISCREPANCY WITH FLANGE FACE AND EQUIP. VENT 5-Sep-19
NCR - SCRACH ON FLANGE FACE ONEQUIP. VENT NZL. 5-Sep-19
HYDROSTATIC TEST PROCEDURE FOR HEATERS 6-Sep-19
ITP FOR CONCRETE FIREPROOFING WORKS 6-Sep-19
ITP FOR CONCRETE FIREPROOFING WORKS 6-Sep-19
NCR - PITTING ON FLANGE SERRATION AREA U 111 6-Sep-19
NCR - DISCREPANCY IN FLANGE FACE WITH P-127-106B 9-Sep-19
NCR - NOZZLE SURFACE DAMAGED BY GRINDING WHEEL 9-Sep-19
NCR - OIL DRAINED DUE TO OIL CONSTANT LEVEL BROKEN 9-Sep-19
INSPECTION & TEST PLAN FOR STENCILING WORKS 9-Sep-19
INSPECTION TEST PLAN EARTH WORKS 9-Sep-19
ITP FIRE PROOFING-PASSIVE FIRE PROTECTION (PFP) 9-Sep-19
NCR - FERRITE CONTENT - OUT OF LICENSOR REQUIRMENT 16-Sep-19
NCR - DISCREPAPNCY WITH FLANGE FACE ON EQUIPMENT 16-Sep-19
NCR - DISCREPANCY WITH FLANGE FACE AND EQUIP. NZL. 16-Sep-19
NCR - THE RADIANT COIL JUMP OVER SPOOL GOT TWISTED 16-Sep-19
CLOSED CODE 2
CLOSED CODE 1
CLOSED CODE 2

Jayakanth & Williams


Rey/Salvador/Jose closed code 1
Peter CLOSED CODE 2
Peter CLOSED CODE 2
Peter closed code 1
Peter closed code 1

closed code 1

CODE 1
CODE 1

CODE 1
CODE 1
CODE 1