Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
MCQ
1
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
5. The method of draining in the tunnels, is known as
a) Foredrainage
b) Dewatering
c) permanent drainage
7. The difference of height of the tunnels above rail tops of B.G. and M.G.
track is kept.
a) 0.45
b) 0.75
c) 0.60
d) 0.30 ANS- c
2
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
9. For BG single track, the section of tunnel must have width-
a) 5.5 m to 5.8 m
b) 4.5 m to 4.8 m
c) 4.2 m to 4.5 m
d) 4.9 m to 5.5 m ANS- d
10.For BG single track railway, the height of tunnel above top of rail-
a) 6.7 m to 7.3 m
b) 7.3 m to 7.5 m
c) 5.8 m to 6.2 m
d) 5.5 m to 5.8 m ANS- a
11. Which one of the following statements is not correct for heading and
benching method of tunneling
a) Benching provide a plateform for working on heading
b) Removal of the muck from the heading is very easy
c) None of these
d) drilling and mucking can be done simultaneously ANS-b
12. For hauling muck from the tunnel, the following type of muck-car is used-
a) Muck box
b) Balle-Ship
c) side dump car
d) U-bottom
e) All of these ANS- e
3
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
13. High pressure grouting is generally restored for concreting in the lining
if the rock strata is-
a) highly fissured
b) poor
c) likely to get seepage of water
d) All of the above ANS- d
14. Which one of the following methods is generally adopted for tunnelling
in firm ground
a) Full face method
b) Top heading and benching method
c) Drift method
d) All the above ANS- d
15. For tunnels exceeding 300 m in length, the grade should be provided below
a) 50% of the rulling gradient
b) 60% of the rulling gradient
c) 75% of the rulling gradient
d) 80% of the rulling gradient ANS- c
16. In case of drift method of tunnelling, the drift may be excavated at-
a) the side
b) the top
c) all
d) the bottom ANS- c
4
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
17. The following operations are required for tunnelling in rocky terrain :
1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking
The correct sequence is :-
a) 1 2 3 4 5
b) 2 3 1 4 5
c) 2 3 5 4 1
d) 4 2 1 3 5 ANS- b
5
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
20. Which one of the following linings is suitable for shield driven tunnels
particularly in the subaqueous regions –
a) stone lining
b) brick liling
c) timber lining
d) cast iron lining ANS-d
6
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
24. In case of railways,
a) a detour round the hill is preferred
b) a open cut is preferred
c) tunneling is preferred
d) all the above ANS-c
25. Which one of the following method is generally adopted for tunneling
in firm ground –
a) full face method
b) top heading and benching method
c) drift method
d) all ANS- d
26. For full face method, the excavation to be done is generally divided in to-
a) two section
b) three section
c) four section
d) five section ANS-b
27. Which one of the following method of tunneling does not required the of
time bearing –
a) linear plate method
b) shield method
c) compressed air method
d) all ANS – e
7
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
28.Match list- X with list- Y
LIST-X LIST-Y
A. Full face method 1. Larage sized tunnel
B. Top heading and benching 2. Small size tunnel
C. Drift method 3. Average size tunnel
Code:- A. B. C.
a) 1 2 3
b) 3 2 1
c) 1 3 2
d) 2 3 1 ANS- d
29. Which one of the following statements is not correct in respect of setting
of an inclined tunnel-
a) the level of the invert at the heading is marked by a tape
b) the alignment is fixed from upper/lower apex point.
c) reference points are constructed on the roof of tunnels
d) none of these ANS-d
31. Pick up the correct statement from the following during tunnel excavation-
a) Oxygen should not be less than 19.5%
b) Carbondioxide should not be more than 0.5%
8
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
c) Hydrogen sulphide should not be more than 0.001%
d) Carbon mono-oxide should not be more than 0.01%
e) All ANS- e
32. Pick up the correct statement regarding drilling a tunnel from the following
a) Holes are drilled by pneumatically operated rock drills
d) All ANS-d
hard rock.
1. Removing ground water,
2. Loading holes and firing the explosive
3. Setting up and drilling
4. Grouting and lining
5. Removing muck
6. Ventilation and removing explosion dust
The correct sequence is :
a) 3 2 6 5 1 4
b) 5 4 2 1 3 6
c) 3 4 6 1 5 2
d) 4 1 2 3 6 5 ANS- a
9
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
34. Which one of the following methods is generally used for the layout of the
muck-car tracks
e) all ANS-e
c) 1 3 2 4
d) 2 1 4 3 ANS-b
36. For initial surveys of tunnels, the following activities are involved:
1. Marking portal point with concrete pillars on the ground
2. Marking tunnel obligatory points on the topographical maps
3. Preliminary setting of the tunnel on the topographical Survey of India
maps
4. Driving lines between the fixed obligatory points.
The correct sequence of the activities is :
a) 3 2 4 1
b) 1 2 3 4
c) 4 3 1 2
10
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
d) 2 4 3 1 ANS-a
a) polycentric
b) rectangular
c) parabolic
d) circular ANS-a
38. The length of the needle beam used in needle beam method of tunneling
is –
a) 2 m to 4 m
b) 2.5 m to 6 m
c) 4 m to 7 m
d) 5 m to 6 m ANS-d
39. Which one of the following methods is adopted for permanent drainage of
Tunnels –
c) concrete lining
e) all ANS-e
11
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
40. Assertion A:- when rock condition are favorable, it will not be necessary
to take up concrete lining concurrently with the driving operations till the
Reason R:- A tunnel through rock, hard or soft, does not need any concrete
Lining.
41. What is the correct sequence of the following events in rock tunneling
3. checking misfire
4. mucking
7. grouting
a) 1 6 5 3 4 2 7
b) 1 2 6 3 5 4 7
c) 1 6 2 5 4 3 7
12
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
d) 1 6 2 5 3 4 7 ANS- d
42. which of the following methods of tunneling is used for long tunnel at
great deoth
b) Army method
c) Austrian method
ground sewer-
b) Army method
c) German method
1. is suitable for soil in which roof can stand for few minutes withot support
a) only 1 is correct
13
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
c) 1, 3 and 4 are correct
45. The correct sequence of drilling equipment for increasing size of hole
in tunnel
1.wagon drill
2. churn drill
3. shot drill
a) 1 2 3
b) 3 1 2
c) 2 1 3
d) 1 3 2 ANS- a
46. Ribs are used for strengthening and stiffening the liner plate for tunnels
a) 2 M
b) 3 M
c) 4 M
d) 5M ANS- b
47. In “full face” method of constructing tunnels, the first operation relates to
14
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
c) removal of top portion
To work alternately
a) liner plate
b) trench jack
c) stiffener
a) propelling jack
b) liner plate
c) hood
d) tail ANS-b
15
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
51. Which one of the following statements is not correct with regard
to heading and hench-ing method of tunnelling.
c) The holes in head and bench are loaded together with explosive
for blasting.
d) After driving the top portion 3 m to 3.5 m holes are drilled into the head
and bench
e) Firing of head holes is done just before the bench holes are fired.
ANS-e
52. Match list X with list Y and select the suitable answer by using code.
LIST X LIST Y
excavation
be installed
Codes:- A. B. C.
a) 1 2 3
b) 2 3 1
c) 3 2 1
d) 2 1 3 ANS-b
16
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
53. For initial survey of tunnels, following activities are involved-
of india map
a) 3 2 4 1
b) 1 2 3 4
c) 4 3 2 1
d) 2 4 3 1 ANS- a
b) the height point on the ridge is fixed with the help of reciprocal
ranging
e) all ANS-e
17
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
55. The concentration of the dust particles of the size 0.5 to 5 microns adjacent
D. 0.001% 4. Methane
Code:- A B C D
a) 1 2 3 4
b) 2 4 3 1
c) 4 1 2 3
d) 1 3 4 2 ANS-b
18
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
57. Pick up the correct statement regarding drilling a tunnel from the following
c) the diameter of bore hole at the deepest point should be 6mm more
d) all ANS-d
58. Which one of the following method of tunneling does not required the
b) shield method
e) all ANS-e
a) carrying water
b) non-cohesive soil
in rock
2. timbering
3. pumping
4. mucking
a) 1 2 3 4
b) 1 4 2 3
c) 2 1 4 3
d) 2 4 1 3 ANS- b
20
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg
62. A good blast with good yield is obtained if the cut hole is –
a) normal to face
63. In the compressed tunneling, the volume of free air provided is-
21
CIVIL BASE https://www.youtube.com/channel/UC7Q9Y0mzqZCIL4b1Y7g7yPg