Sei sulla pagina 1di 15

2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.

00

100MMØ 50MMØ PVC


PVC PIPE VENT PIPE
CO
CO
SS WC WC WC WC WC WC 0.90
WC
FD CO
FD UR
CO 75MMØ PVC
75MMØ PVC PIPE
LAV UR SOIL PIPE
6.00

6.00
CO
LAV FD FD UR 150MMØ PVC
SOIL PIPE
UR
LAV
100 MMØ FD
PVC PIPE CO WC WC
UR UR UR UR UR
CO
100MMØ WC WC WC WC WC WC
PVC PIPE

CO
6.00

6.00
FD FD

CO LAV LAV LAV SS 150MMØ PVC SOIL


WASTE STACK PIPE
75 MMØ PVC VENT PIPE
75 MMØ PVC VENT PIPE
24.00

24.00
CO
50 MMØ PVC PIPE LAV
3.00

FD
75 MMØ PVC PIPE UR
150MMØ PVC
50 MMØ PVC AIRVENT PIPE WC SOIL PIPE
CO LAV

6.00
CO CO 75 MMØ
150MMØ PVC SOIL UR PVC PIPE
WASTE STACK PIPE 150 MMØ LAV FD
3.00

PVC PIPE FD UR

50 MMØ PVC PIPE WC WC WC

CO
150 MMØ
75MMØ PVC PIPE
PVC PIPE CO 4
3
75 MMØ 2

PVC PIPE LAV 1


6.00

6.00
CO
LAV 75 MMØ
WC PVC PIPE
FD
WC
FD FD
WC KS
UR UR WC

CO
150MMØ PVC
SOIL PIPE
3.00

3.00
SEPTIC
TANK

4
3
2
1

150MMØ PVC
OUTLET PIPE
TO MAIN
SEWER LINE
PEDESTRIAN LANE

GROUND FLOOR PLAN


1 SANITARY LAYOUT PLAN
P-1 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-1
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

100MMØ 50MMØ PVC


PVC PIPE VENT PIPE

0.90

0.90
CO
SS
CO
WC WC WC WC WC WC CO
WC
FD
FD UR
CO
LAV 75MMØ PVC PIPE UR
6.00

6.00
CO FD FD FD
LAV UR
150MMØ PVC
UR SOIL PIPE
LAV
100 MMØ FD
PVC PIPE CO WC WC
UR UR UR UR UR
CO
100MMØ WC WC WC WC WC WC
PVC PIPE

FD FD
CO
6.00

6.00
CO LAV LAV LAV SS 150MMØ PVC SOIL
WASTE STACK PIPE
50 MMØ CO 75 MMØ PVC VENT PIPE CO
PVC PIPE 75 MMØ PVC VENT PIPE
FD 50 MMØ
LAV
24.00

24.00
PVC PIPE
50 MMØ CO
UR LAV
PVC PIPE WC
FD
FD
3.00

PVC PIPE
100 MMØ WC FD
UR
WC WC WC CO
WC UR

6.00
150 MMØ
PVC PIPE
3.00
6.00

6.00
PERIMETER LINE
SECOND FLOOR PLAN
1 SANITARY LAYOUT PLAN
P-2 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-2
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

100MMØ 50MMØ PVC


PVC PIPE VENT PIPE
CO
SS
CO
WC WC WC WC WC WC CO
WC
FD
FD UR
CO
LAV 75MMØ PVC PIPE UR
6.00

6.00
CO FD FD FD
LAV UR
150MMØ PVC
UR SOIL PIPE
LAV
100 MMØ FD
PVC PIPE CO WC WC
UR UR UR UR UR
CO
100MMØ WC WC WC WC WC WC
PVC PIPE

FD FD
CO
6.00

6.00
CO LAV LAV LAV SS 150MMØ PVC SOIL
WASTE STACK PIPE
75 MMØ PVC VENT PIPE CO
75 MMØ PVC VENT PIPE
24.00

24.00
3.00

6.00
3.00
6.00

6.00
W2 W1

ROOFDECK FLOOR PLAN


1 SANITARY LAYOUT PLAN
P-3 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-3
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
GENERAL NOTES:
.50 M.
.10 .30 .10 R.C. COVER W STL ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE W THE LATEST PROVISIONS
LIFTING COVER OF THE NATIONAL PLUMBING CODE
6.00 M

.15 2.40 .15 1.50 .15 1.50 .15 ALL VERT SOIL & WASTE STACK PIPE SHALL BE EXTEND FULL SIZE ABOVE ROOF LINE

TO SEPTIC VAULT

.10
0.50 AS VENTS EXCEPT OTHERWISE SPECIFICALLY INDICATED
INLET PIPE 0.40
.05 .05 ALL CHANGES IN PIPE SIZES ON SOIL WASTE LINE SHALL BE MADE W THE REDUCING

.50 M.
.30
6" CHB FITTINGS OR RECESS REDUCERS
4" CHB
PROVIDE CLEANOUT FOR EVERY FIFTEEN METERS ( 15.00 M ) DISTANCE
SEWER LINE HORIZONTAL LINE
(OUTLET PIPE)

.10
.15
PROVIDE 50MM Ø P-TRAP FOR EVERY 100M M Ø X 100MM Ø FLR DRAIN
P L A N

1.10
PROVIDE STOP-COCK FOR EVERY FIXTURES

INSIDE WIDTH
3.00 METERS
R.C. COVER W STL

2.70M
12MMØ BARS LIFTING COVER

0.50
SPACED @ .20M LEGEND & SYMBOLS
O.C BW
COLD WATER LINE
.40 X .40 SHO SHOWER FD FLOOR DRAIN

1.10
MANHOLE PLASTERED FIN. PVC POLYVINYL CHLORIDE UR URINAL
DRAIN LINE SV SEPTIC VAULT
STORM DRAINAGE DS DOWNSPOUT GV GATE VALVE

.15
PIPE LINE 10 MM THK CB CATCH BASIN
CHB WALL W SD SHOWER DRAIN CV CHECK VALVE
10 MMØ BARS
UR URINAL

120mm
P L A N VSTR VENT STACK THRU ROOF SOIL PIPE LINE
4-12 MMØ
WC WATER CLOSET
TO SEPTIC VAULT

BARS BOTHWAYS F FAUCET DRAINAGE PIPE LINE


INLET PIPE

LAV LAVATORY WM WATER METER


CO CLEAN-OUT
SECTION

.15 5.70 M .15


INSIDE LENGTH 2 CATCH-BASIN DETAIL
2.40 .15 1.50 .15 1.50 P-4 NOT TO SCALE
0.50
TO SEPTIC VAULT .05 .05 Ø12 LIFT BAR TO MAIN
INLET PIPE OUTLET PIPE
SEWER LINE 1,000 GALLONS
CAPACITY
WATER TANK
.15

.15
FHC GV
.30

AIR SPACE AIR SPACE


0.05

WATER LEVEL AIR SPACE


0.05
0.05

WATER LEVEL
WATER LEVEL
0.05

0.05

GV GV
BRANCH PIPE ROOF DECK LEVEL

DOWNFEED DISTRIBUTION PIPE


INSIDE CLEAR
HT. OF TANK

DIGESTIVE LEACHING LEACHING


2.00 M

1.75

UP FEED PIPE MAIN WATERLINE PIPE


CHAMBER CHAMBER CHAMBER
1 2
4" CHB 6" CHB
6" CHB
12MMØ BARS FHC
SPACED @ .20M
O.C BW
SLOPE 1:10 (M
IN )
.10

BRANCH PIPE SECOND FLOOR LEVEL

WF1

.40M

NOTE: SECTION
FHC
VERIFY SIZE OF SEPTIC TANK TO LOCATION
AT LEAST 2.00 MTRS. APART FROM THE BUILDING LINE
TO MAIN WATER SOURCE GV CV BRANCH PIPE GROUND FLOOR LEVEL
MAYNILAD GV WM CV
FROM MAIN WATER SOURCE
MAYNILAD

1 SEPTIC TANK DETAIL


P-4 NOT TO SCALE 3 WATERLINE DIAGRAM
P-4 NOT TO SCALE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-4
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

32MMØ PPR CWL RISER 25MM Ø PPR CWL PIPE


PIPE TO WATER TANK

SS WC WC WC WC WC WC WC GV0.90

UR 32MMØ PPR CWL


LAV RISER PIPE
UR
6.00

6.00
LAV UR

25MMØ PPR CWL UR


LAV 25MMØ PPR CWL
GV
UR UR UR UR UR WC WC

GV
WC WC WC WC WC WC

25MMØ PPR CWL


6.00

6.00
32MMØ PPR CWL LAV LAV LAV SS
RISER PIPE
GV
32MMØ PPR CWL
RISER PIPE
24.00

24.00
0.90 20MMØ PPR CWL
LAV GV
3.00

UR

WC 20MMØ PPR CWL

6.00
LAV

LAV UR
20MMØ PPR CWL
3.00

UR
EDSA

32MMØ PPR CWL

32MM Ø PPR CWL PIPE


WC WC WC
GV
20MM Ø PPR CWL PIPE

4
3
2
20MMØ PPR CWL LAV 1
RISER PIPE
6.00

6.00
LAV WC
20MMØ PPR CWL
WC RISER PIPE

UR WC WC KS
GV GV
GV 32MM Ø PPR CWL PIPE
3.00

3.00
CV
WM M
4
3 GV
2
1

PEDESTRIAN LANE 50MMØ CWL PIPE


TO MAIN WATER LINE

GROUND FLOOR PLAN


1 WATERLINE LAYOUT PLAN
P-5 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-5
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

25MM Ø PPR CWL PIPE

0.90

0.90
GV
SS WC WC WC WC WC WC WC 25MM Ø PPR CWL PIPE

25MM Ø PPR CWL PIPE UR


LAV
6.00

6.00
UR
LAV UR
LAV UR
25MM Ø PPR CWL PIPE

UR UR UR UR UR WC WC GV

WC WC WC WC WC WC
25MM Ø PPR CWL PIPE
6.00

6.00
25MM Ø PPR CWL PIPE
32MMØ PPR CWL LAV LAV LAV SS
RISER PIPE
GV
32MMØ PPR CWL 32MMØ PPR CWL
LAV
RISER PIPE
24.00

24.00
20MM Ø PPR PIPE
GV
WC UR LAV
3.00

UR
WC
GV UR
WC WC WC WC
UR

6.00
GV
3.00
6.00

6.00
PERIMETER LINE
SECOND FLOOR PLAN
1 WATERLINE LAYOUT PLAN
P-6 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-6
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

RISER FM PUMP 25MM Ø PPR CWL PIPE


SERVICE CONNECTION

GV
WATER SS WC WC WC WC WC WC WC
TANK

GV UR
LAV
6.00

6.00
UR
LAV UR
LAV UR

UR UR UR UR UR WC WC GV
GV

WC WC WC WC WC WC

25MM Ø PPR CWL PIPE 25MM Ø PPR CWL PIPE


6.00

6.00
32MM Ø PPR CWL PIPE

LAV LAV LAV SS


GV
32MMØ PPR CWL
RISER PIPE
24.00

24.00
3.00

6.00
3.00
6.00

6.00
W2 W1

ROOFDECK FLOOR PLAN


1 WATERLINE LAYOUT PLAN
P-7 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-7
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

300MMØ PVC
STORM DRAIN 300MM Ø PVC STORM DRAIN PIPE
PIPE TO MAIN CB CB CB CB CB CB CB CB CB CB
SEWER LINE
0.90

6.00

6.00
200MM Ø PVC STORM DRAIN PIPE
6.00

6.00
24.00

24.00
0.90 CB
3.00

6.00
3.00

EDSA

CB

4
3
2
1
6.00

6.00
3.00

3.00
4
3
2
1

PEDESTRIAN LANE
GROUND FLOOR PLAN
1 STORM DRAIN LAYOUT PLAN
P-8 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-8
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

150MM Ø PVC
DOWNSPOUT PIPE

0.90

0.90
DS DS DS DS DS DS DS DS DS DS
6.00

6.00
6.00

6.00
24.00

24.00
DS
3.00

DOWNSPOUT PIPE
100MM Ø PVC

6.00
3.00

DS
6.00

6.00
SECOND FLOOR PLAN
1 STORM DRAIN LAYOUT PLAN
P-9 SCALE 1:100 MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
HONORIO R AGNILA
POLICE SUPERINTENDENT
ACTING CHIEF, INFRASTRUCTURE DIVISION
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
CHIEF OF STAFF, ENGINEERING SERVICE
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
DEPUTY DIRECTOR, ENGINEERING SERVICE
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
P-9
A B C D E F G H I J
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

RD RD RD RD RD RD RD RD RD RD

1
6.00

2
6.00
24.00

3
6.00

5
6.00

6
3.00

ROOF PLAN
1 STORM DRAIN LAYOUT PLAN
P-10 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-10
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

DS DS DS DS DS DS ACU DS DS DS
ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU ACU
ACU ACU ACU ACU ACU NBI STO

MULTI PURPOSE RM
LANDBANK DI AND NBI DI STO

STO

6.00
MALE CR

STORAGE RM
ACU ACU

CABINET

CABINET
EXAMINATION RM - 2 ACU
TRANSACTION WINDOWS

ACU ACU ACU


ACU ACU
FE

ACU
H A L L W A Y
ACU ACU CLIENTS LOUNGE CLIENTS LOUNGE ACU
NP SECTION
RECEPTION AREA

6.00
OFFICE FEMALE CR
ACU ACU
INTERVIEW RM INTERVIEW RM
CHIEF
PANEL LANDBANK
INTERVIEW DI & NBI CLEARANCE

CHASE
PIPE

24.00
LOCKER COUNTER TABLE COUNTER TABLE STORAGE
RM EXIT ACU

H A L L W A Y
H A L L W A Y
UP
ACU ACU
WASH

6.00
CR
AREA ELECTRICAL RM
EXIT
FEMALE MALE
CR
ACU
CR

32.70
COMPUTER TABLE
CLIENTS LOUNGE
SERVER
CCTV RM

ACU ACU CLIENTS WAITING AREA ACU


CRIME LAB DRUG TESTING ACU
ACU
ACU ACU ACU ACU ENTEXIT
SENIOR CITIZENS & PWD LOUNGE
4 RAMP UP
ACU 3
ACU WASH AREA 2
INFORMATION
TRANSACTION WINDOWS ACU 1

6.00
ACU EXAM RM STORAGE UP
ACU
MALE FEMALE
PWD CR

EXIT LOBBY UP
URINE COLLECTION CHIEF
STO

RAMP UP
ENTRANCE

TRANSFORMATION
ENTRANCE FROM
MAIN ENTRY

OVAL
PORCH
GROUND FLOOR PLAN
1 ACU DRAIN LAYOUT PLAN 4
3
2
1
RAMP UP

P-11 SCALE 1:100 MTS UP

CANOPY LINE

P E D E S T R I A N L A N E

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-11
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

0.90

0.90
DS DS DS DS ACU DS DSACU DS DS ACU ACU DS DS

ACU ACU ACU ACU ACU ACU ACU ACU ACU


ACU

ACU ACU
6.00

6.00
ACU
ACU

ACU

ACU
ACU
6.00

6.00
ACU
24.00

24.00
ACU ACU ACU
3.00

ACU

6.00
ACU ACU
3.00

ACU
ACU

ACU
ACU ACU
ACU
6.00

6.00
ACU

ACU
ACU

ACU

ACU ACU ACU ACU

SECOND FLOOR PLAN


1 ACU DRAIN LAYOUT PLAN
P-12 SCALE 1:100 MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-12
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
2.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

0.90
6.00

6.00
6.00

6.00
24.00

24.00
0.90
3.00

6.00
3.00

EDSA

FHC

100MM Ø GI PIPE 4
DRY STAND PIPE 3
2
1
6.00

6.00
FHC

100MM Ø GI PIPE
3.00

3.00
DRY STAND PIPE

GROUND FLOOR PLAN


1 FIRE SUPPRESSION LAYOUT PLAN 4
3
2

P-13 SCALE 1:100 MTS


1

PEDESTRIAN LANE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-13
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

0.90

0.90
6.00

6.00
6.00

6.00
24.00

24.00
3.00

6.00
3.00

FHC

100MM Ø GI PIPE
DRY STAND PIPE
6.00

6.00
FHC

100MM Ø GI PIPE
DRY STAND PIPE

SECOND FLOOR PLAN


1 FIRE SUPPRESSION LAYOUT PLAN
P-14 SCALE 1:100 MTS

PERIMETER LINE

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-14
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE
54.00

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

6.00
6.00

6.00
24.00

24.00
3.00

6.00
3.00

FHC

100MM Ø GI PIPE
DRY STAND PIPE
6.00

6.00
FHC

W2 W1

100MM Ø GI PIPE
DRY STAND PIPE

ROOFDECK FLOOR PLAN


1 FIRE SUPPRESSION LAYOUT PLAN
P-15 SCALE 1:100 MTS

PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING


LOCATION: CAMP CRAME, QUEZON CITY
FERDINAND S MAGALLANES
POLICE CHIEF INSPECTOR
HONORIO R AGNILA
POLICE SUPERINTENDENT
MANUEL G FABROS
POLICE SENIOR SUPERINTENDENT
ABELARDO C MATILLANO
POLICE SENIOR SUPERINTENDENT
ANTONIO A TAYLAN, JR
POLICE CHIEF SUPERINTENDENT
P-15
CHIEF, PLANS & DESIGN SECTION ACTING CHIEF, INFRASTRUCTURE DIVISION CHIEF OF STAFF, ENGINEERING SERVICE DEPUTY DIRECTOR, ENGINEERING SERVICE DIRECTOR, ENGINEERING SERVICE

Potrebbero piacerti anche