2 Scope of Works
2.1 Scope
Installation the fire blanket of shutdown valve 10" & 8"(UZV)
Site Preparation
Preparation the materials and tools
Site restoration
4 Resources
4.1 Personnel
Mechanical Supervisor no.1
5 Execution of Works
The steps you identified in section 2.2 but now in more detail, how will you prepare the site, how deep
will the excavation be, how will you excavate, what arrangements will be in place for shoring or banking,
what size will the scaffold be, how many access points will it have, etc.
6 HSE Requirements
6.1 HSE Requirements
-Barrier around work location.
6.4 PPE
Full PPE must be worn like helmet ,safety shoes ,glasses ,FR coverall.
Attachments