Pour Description
Created by www.ConstructionLogs.com
CONCRETE INFORMATION
Pour Location Estimated Concrete CY
Pour Number Actual Concrete CY
Mix Design No. Pour Area SF
Mix Slump Mix Strength PSI
Mix Addmixtures Placement Method
Required Finish * Pump Size
Curing Method * Pump Start Time
By signing below, I agree that I have inspected the areas noted to receive concrete are that they are complete and ready for
concrete placement.
SIGNATURE CONFIRMATIONS
Special Inspector GC
Superintendent Mechanical
Project Manager Electrical
Project Engineer Plumbing
Surveyor Post Tension
Foreman Misc.
NOTES: PRE-PLACEMENT
INSPECTOR INFORMATION
Weather Conditions Temperature
Testing Company Misc. Tests
Slump Test
Cyl Sets Actual Concrete CY