Sei sulla pagina 1di 2

CONCRETE PRE POUR CHECKLIST

PROJECT NAME ABC Project PROJECT NUMBER 1234


PROJECT LOCATION 123 Florida Ave, Miami, FL DATE OF POUR: 1/1/2017
GENERAL CONTRACTOR ABC Contracting TIME OF POUR: 9:00 AM
Pour Location

Pour Description
Created by www.ConstructionLogs.com
CONCRETE INFORMATION
Pour Location Estimated Concrete CY
Pour Number Actual Concrete CY
Mix Design No. Pour Area SF
Mix Slump Mix Strength PSI
Mix Addmixtures Placement Method
Required Finish * Pump Size
Curing Method * Pump Start Time

Walls Columns Footings


Clearences Clearences Clearences
Elevations Elevations Elevations

By signing below, I agree that I have inspected the areas noted to receive concrete are that they are complete and ready for
concrete placement.

SIGNATURE CONFIRMATIONS
Special Inspector GC
Superintendent Mechanical
Project Manager Electrical
Project Engineer Plumbing
Surveyor Post Tension
Foreman Misc.

NOTES: PRE-PLACEMENT

INSPECTOR INFORMATION
Weather Conditions Temperature
Testing Company Misc. Tests
Slump Test
Cyl Sets Actual Concrete CY

NOTES: CONCRETE PLACEMENT


Thank you for trying our Free Template!
You may enjoy this template as long as you want for personal use.

Looking to Upgrade for Full Editing Ability and Premium Features?


We make it easy with our 3 Options Below

Option 1: Updage to the Lite Package


Unlock all of the Free Templates for Full Editing and Formatting ability.

Option 2: Updage to Premium Templates


Purchase individual templates with premium features not found in the Free Templates!
These templates are designed to save you time and reduce costly errors and derive more data!

Option 3: Updage to our Premium Packages


Bundle and Save with our Premium Packages!
These packages combine the Premium Templates for significant Savings!

Broken link or have any questions? Visit www.ConstructionLogs.com

Potrebbero piacerti anche