ELECTROSTATIC PRECIPITATOR
TESTING
TRAINING
VISION
➔ To be a world class engineering organization that provides the best products & services
MISSION
We commit to be the most admired company by:
➔ Providing the products & services that exceed customer expectations
➔ Innovating & Deploying total business solutions
➔ Empowering our employees & creating an environment for them to perform at their highest potential
MANAGEMENT TEAM
MANUFACTURING CAPABILITIES
➔ Manufacturing Capacity of 1600 MT per month
➔ Concurrently, 4 numbers of bigger size APH 36 VI can be manufactured
➔ Equipped with all the machines required for our In-house machining
ROTARY AIR PREHEATER
NEW AIR PREHEATER
Executed a contract to M/s. Bharat Aluminium Company Ltd., Power Plant – II for the replacement of existing Air Preheaters [size
24VIT] with the New Air Preheaters [2-numbers of size 25.5 VITM 1900 (2100)] including Design, Engineering, Manufacturing, Supply
& Site Supervision for one of their 135 MW unit, to their entire satisfaction. This APH is consistently running with desired parameters.
Contract was awarded and completed for the total supply of New Air Preheaters [Two Numbers of size 27 VIT - 2100] to M/s.
Ansaldo for their Nagai – I Power Plant.
Hindalco Industries Limited (Renukoot Executed a contract involving Design, Engineering, Manufacturing & Supply including Site
Power Division) Supervision during Erection & Commissioning for Air Preheater with increase in size.
Hindalco Industries Limited (Renusagar Executed a contract for 5 Boilers, involving Design, Engineering, Manufacturing, Supply &
Power Division) Site Supervision for Air Preheater.
Tuticorin Thermal Power Station Contract was executed involving Design & Supply of Complete Support Bearing Assembly
(210MW), TANGEDCO including Erection & Commissioning for Air Preheater.
Talcher Thermal Power Station Executed a contract through M/s. NASL, India, involving Design, Detailed Engineering,
(110MW), NTPC Ltd. Manufacturing & Supply of Air Preheater with Sector Angle Modification.
Tuticorin Thermal Power Station Three contracts for Unit 3, Unit 4 & Unit 5, Converting existing Air Preheater to Modular
(210MW), TANGEDCO Air Preheater with Double Sealing Arrangement was executed.
Mettur Thermal Power Station The existing Air Preheaters were replaced with higher sized Air Preheaters.
(210MW)
National Aluminium Co. Ltd. Replacement of existing Air Preheaters with higher size Air Preheaters to increase the heat
Damanjodi transfer area.
Bharat Petroleum Corporation Ltd. The existing Air Preheaters were replaced with higher sized Air Preheaters.
(Kochi Refinery)
ELECTROSTATIC PRECIPITATOR
ENGINEERING CAPABILITIES
➔ Sizing & Selection of ESP for any type of applications &
for a wide variety of fuels including fossil and biomass
➔ Design & Engineering for both Tumbling Hammer
Rapping Mechanism & Electro Magnetic Impulse Gravity
Impact (EMIGI) Rapping Design
➔ Compliance with stringent emission norms as low as
20mg/Nm3.
➔ Structural frame analysis using FEA
➔ Computational Fluid Dynamics model study
MANUFACTURING CAPABILITIES
➔ Manufacture of ESP Components within our shop floor
➔ International Quality Standards in manufacturing
16
14
13
11
5 Optimized Design
4
Pressure (Pa)
2
-1900 -1860 -1820 -1780 -1740 -1700 -1660 -1620 -1580 -1540 -1500
0
Electrostatic Precipitator
Transient Analysis of various Air Preheater Heating Element profiles was carried out in a test
environment to provide a detailed comparison of Temperature, Pressure, Velocity, Boundary Heat Transfer,
Turbulent Kinetic Energy & Nusselt Number. The results are used to select the most appropriate heating
element profile for the plant operating condition. CFD Analysis is also carried out to study the flow pattern &
establish a uniform flow upstream of the Air Preheater.
The velocity flow streamlines depict the flow behaviour & possible stagnation zones. These zones are
studied for their turbulence characteristics & efforts are taken to minimize flow losses.
Flow through
DU VAR1 PROFILE FNC PROFILE NF6 PROFILE DU VAR2 PROFILE CU PROFILE Air Preheater
Geometries of APH
Heating Elements.
Temperature (C)
30 94 158 222 286 350
FINITE ELEMENT ANALYSIS
Finite Element Analysis, an advanced computational program based on numerical methods for evaluation of structures & system is
used to accurately predict components' response when subjected to thermal & structural loads. It verifies design integrity & identifies
critical location on a component, thereby design improvements can be done before building the component.
FEA is being used extensively at GEECO during the Product Design & Development stage to ensure safe operation and longer life
of the products. It accurately predicts the induced stresses and the resulting deformation during operation of the component and thus paves
way for optimized product design. The picture given below illustrates the FEA process cycle deployed during the design of a typical
bearing housing at GEECO.
2 3
Geometry FEA
Discritization Solver
FEA
Process Cycle
3D CAD
Implementation
Geometry
& Production
1 4
FEA APPLICATIONS
Stress (MPa)
0 25 50 75 90
FIELD ENGINEERING SERVICE
CAPABILITIES
➔ Dedicated & Technically competent Engineers
➔ Quick Troubleshooting
➔ Imparting knowledge to the Customer
➔ Fast Response & Customized solutions
➔ Identify even the smallest problem that may lead to performance loss
➔ Suggest performance improvements
➔ Maintain long-term customer relationship
➔ Increase the reliability of operation
0
TESTING
AIR IN LEAKAGE TEST
The air in leakage test is conducted to ensure that the erection weldments are sound & leak proof.
The purpose of the test is to proactively identify the leakage sources & to arrest them appropriately with
suitable welding, thereby reducing the possible leakages when ESP is in operation. This is done as a part
of erection activity before insulation work is taken up.GEECO possesses necessary expertise & has
advanced test instrumentation consisting of venturi meter with blower & U tube manometers to assess the
leakage constants of the precipitator casing & quantify the leakages.
GD TEST
As the ESP cross section area is huge & the gas velocity is reduced from 15 m/s to less than 1
m/s, the flue gas flow across the cross section should be uniform so as to achieve effective utilization of the
collecting area provided for collection of dust particles. GD test is mandatorily done in all precipitators as part
of precommissioning test. GD test is carried out conforming to domestic & ICAC standards by GEECO's
experienced team using equipments like vane type digital anemometer suitable for measuring velocities from
0.3 m/s to 40 m/s.
VALIDATION TEST
Pre-tests are conducted for all layouts connecting APH with ESP & ESP with ID Fan
systems to get required inputs for CFD optimizations. The purpose is to ensure uniform flow
distribution across the cross section in the medium through which fluid is allowed to flow. This
distribution also aids in reducing pressure drop across the equipment by which it operates at its
best efficiency. This is also further ascertained by conducting post-tests with pitot tubes,
micromanometers & vane type anemometers by doing grid measurements.
AIR LOAD TEST
In ESP, upon completion of all erection activities, air as a medium of load, the voltage is let through the emitting & collecting
electrode system gradually. This is to ascertain the healthiness of the particular field. The current is increased in steps of 50 mA till the
field receives the full power & the equipment (TR. Set) reaches its full load capacity. During the gradual increase of current &
corresponding voltage, there should not be any sparking. During air load test, if the voltages are nearer to the RMS voltage of full
capacity, then it can be concluded that the field is healthy. This procedure shall be repeated for other fields of the ESP.
PERFORMANCE TESTING
➔ GEECO is equipped with test equipments required for conducting full scale performance testing
conforming to Domestic Standard (IS11255) & International Standard (EPA Method 17)
➔ Involves velocity measurement & particulate sampling which is done at iso-kinetic conditions
➔ Possesses instruments such us Air-neutronics to assess the pressure drop across the System
➔ Possesses wattmeter for conducting power measurement
CAPABILITIES OF TESTING GROUP
Having experience of over three decades in Engineering, Manufacturing, Field support service, we are specialized in all types of
combustion including Oil, Gas, PF & bed firing systems. GEECO conducts Performance testing, Residual Life Assessment study, Tube
failure analysis during commissioning, execution of R&M & regular operation of Boiler & Auxiliaries.
Performance Guarantee testing is done as per performance test codes & standards of Boilers & Auxiliaries to prove the contractual
guarantee. Performance Evaluation testing of Boilers & Auxiliaries (APH, ESP & Pulverisers) is done to assess the present condition &
also to meet out the influences of different coal properties for further improvements.
Other testings include Air / Gas flow equalising test, Cold air velocity test for boiler, Clean / dirty air flow test for pulverisers.
TRAINING
TRAINING OFFERED TO
➔ Engineering & Management Professionals
➔ Power Plant O&M Engineers
➔ Newly recruited Power Plant Engineers
➔ Power Sector Consultants
➔ Technicians & Operators of Power Plant
➔ Students
AREAS OF TRAINING
Air Preheater
➔ Principle of Working
➔ Construction & Features
➔ Improvements
➔ Problems & Solutions
➔ Case Studies
➔ O&M Practices
Electrostatic Precipitator
➔ Principle of Working
➔ Construction & Features
➔ Developments
➔ Erection Methods
➔ O&M Practices
Boiler Performance
➔ General Boiler Performance
➔ Combustion Optimization
RESEARCH AND DEVELOPMENT
CAPABILITIES
➔ Develop new Product & Technology to meet customer needs Y
Hot
➔ In-depth product / process knowledge & expertise End
SA X
Cold End
PA
APH Simulator: Predicted Fluid
GAS Temperatures
as a function of APH Height
CORE ACTIVITIES
➔ Comparison & development of heating element profiles for efficient heat recovery, lower pressure drop & easy cleanability
➔ Development of Diagnostic tool to continuously monitor the health of APH
➔ Identification of suitable geometry & wear-resistant material for seals to minimize indirect leakage
➔ Optimization, Automation & Modification of cold rolling process of heating elements
➔ Criterion for Basket Replacement, fouling & cleanability of heating elements
➔ Installation of Guide Vanes at inlet & outlet ducts for uniform fluid flow through APH
➔ Development of APH Simulator to predict transient steady-state metal temperature
➔ Prediction of thermal deformation of rotor using FEA & numerical methods
➔ Surface Modification of Hot End Elements for Erosion Resistance
➔ Improvement of Soot Blowing Process
R & D - ADVANTAGES
➔ Deeper Insight
➔ Innovative Design
➔ Optimized Solution
➔ Cost Saving
➔ Better Reliability
➔ Continual Improvement
CONTACT DETAILS
GEECO Enercon Pvt. Limited, GEECO Enercon Pvt. Limited, GEECO Power Mech SDN BHD,
D/C 6, SIDCO Industrial Estate, 103, Muthandipatti (Post), No.50-1 A, Pusat Perniagann Barat,
Thuvakudy, Pudupatti, Sengipatti (Via), Jalan Raya Barat, 41100 Klang,
Tiruchirapalli - 620 015. Thanjavur - 613 402. Selangor Darul Ehsan, Malaysia.
Tamil Nadu, India. Tamil Nadu, India. Tel : +603 33744306
Tel : +91 431 2501239 E-mail : geeco.my@geeco.in
+91 431 2501312
E-mail : geeco@geeco.in
Fax : +91 431 2500705
www.geeco.in