Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Introduction
1.1 Raymond
Incorporated in 1925, the Raymond Group is a Rs. 1400 crore plus conglomerate
having businesses in Textiles, Readymade Garments, Engineering Files & Tools,
Prophylactics and Toiletries.
The group is the leader in textiles, apparel, & files & tools in India and enjoys a
pronounced position in the international market. Raymond believes in Excellence,
Quality and Leadership.
Raymond is uniquely positioned as a brand that addresses the innate need of men to
look good and at the same time possess strength of character. This emphasis on
human values creates a warm emotional link with consumers- the essence of ‘The
Complete Man’.
Raymond has the distinction of producing the finest suiting in the world using super
fine wool from 80s to 230s count and blending the same with superfine polyester and
other specialty fibers, like Cashmere, Angora, Alpaca, Pure Silk, Linen etc.
The company produces nearly 20,000 design and colours of suiting fabric, that have
found their way in over 55 countries including the European Union, USA, Canada,
Japan and Australia among others. Even as our products evolve with the times, the
brand still caters to the different faces of ‘The Complete Man’- a man who is caring,
sensitive and places a huge premium on relationships
The company’s engagement with the customer works on multiple dimensions right
from developing fashion guides that help them look sharp, to a wide selection of
fabric for all occasions and fashion, to offering superior tailoring at The Raymond
Shops at convenient locations all over India and the Middle East.
Shirts Suits
Trouser Jackets
2
1.2 Organisational Structure
Thane
President HR Chindwara
Textile
Vapi
Manufacturing
Jalgaon
SSAL
Denim
Raymond – Ever Blue Ltd
UCO
Manzoni
Park Avenue
Parx
Raymond Group
CMD RAL ColorPlus
Group President
Notting Hill
Be
Zapp
Celebration
RZPL
Apparel
Raymond The Raymond
Retail Shop
J K Ansell Kamasutra
Raymond
Aviation
President
Finance
1.3 History
Around the time the Singhania family was building, consolidating and expanding its
various businesses in Kanpur, one Mr. Wadia, was in a similar manner engaged in
fulfilling his dream: he set up a small woollen mill in the area around Thane creek,
40 kms away from Bombay. The Sassoons, a well-known industrialist family of
Bombay, soon acquired this mill and renamed it as The Raymond Woollen Mills
When the Singhania’s were looking for new regions to establish their presence and
new fields to venture into, they concurred that textiles appeared to hold promise. A
piece of information that a woollen mill was available on the outskirts of Bombay
clinched the issue.
When the grandson of Lala Juggilal, Lala Kailashpat Singhania took over Raymond
in 1944, the mill was primarily making cheap and coarse woollen blankets, and
modest quantities of low priced woollen fabrics.
The vision and foresight of Mr. Kailashpat Singhania helped greatly in establishing
the J.K. Group’s presence in the western region. Under his able stewardship,
Raymond embarked upon a gradual phase of technological up gradation and
modernisation producing woollen fabrics of a far superior quality. Under Mr. Gopala
krishna Singhania, the mill became a world-class factory and the Raymond brand
became synonymous with fine quality woollen fabrics. At Raymond, quality did not
rest on its laurels
When Dr.Vijaypat Singhania took over the reins of the company in 1980, he injected
fresh vigour into Raymond, transforming it into a modern, industrial conglomerate.
His son Mr. Gautam Hari Singhania, the present chairman and managing director has
been instrumental in restructuring the Group. With the divestment of the Synthetics,
Steel and Cement divisions he initiated, the Group has emerged stronger with a better
4
bottom line, more focused approach, become market oriented and achieved a
consolidated position
Today, the woollen mill by the creek has turned into a Rs. 1400 crores conglomerate
and is India’s leading producer of worsted suiting fabric with 60% market share. It is
also the largest exporter of worsted fabrics and readymade garments to 54 countries
including Australia, Canada, USA, the European Union and Japan. The Raymond
group is also the leader among ready-mades in India with a turnover of Rs. 2000
million with its three brands – Park Avenue, Parx and Manzoni.
5
1.4 International Business
It all began with a small but significant order from Fiji for Rs. 7,000 worth of
Raymond fabrics. In the St. Erik’s Fair in Sweden, a sizeable order was won and
executed and ever since exports have never looked back.
Today, Raymond is the largest exporter of worsted fabrics and readymade garments
to over 58 countries including Australia, Canada, USA, the European Union and
Japan. From winning the first ever Government of India award for outstanding
export performances, Raymond has continued to win a number of export awards.
Happily the export graph continues to rise higher…and higher.
Raymond Denim enjoys a substantial market share in all parts of the world. The
company exports 55% of its production to around 20 countries around the world and
to leading denim wear brands like Levi’s, Pepe, Lee Cooper and retail brands like
Zara, H&M, Gap, Tommy Hilfiger, etc.
Fabrics
100% Wool, Wool Rich, Polyester Wool & Polyester Viscose fabrics .Exotic fabrics
like Wool Silk, Wool Cashmere, Cape Wool and Linen blends. Available in variety
of finished and stretch properties both with and without Lycra.
Blankets
100% Wool, Wool Rich Blankets & Flannels.
Garments
Trousers, Jackets, Suits, Shirts, Jeans and Readymade accessories such as Ties,
Socks Handkerchiefs and Leather Belts.
6
RAYMOND GROUP STRUCTURE
7
1.5 Group Companies
The Raymond group was incorporated in 1925 and within a span of a few years,
transformed from being an Indian textile major to a global conglomerate.
In the endeavour to keep nurturing quality & leadership, it always choose the path
untaken- from being the first in 1959 to introduce a polywool blend in India to
creating the world’s finest suiting fabric the 250s made from the superfine 11.4
micron wool.
It also has some of the most highly respected fabric and apparel brands in its
portfolio: Raymond, Raymond (Ready-to-wear), Park Avenue, Color Plus, Parx,
Makers &Notting Hill.
The Raymond Group also has an expensive retail presence established through the
exclusive chain of “The Raymond Shop” and the stand-alone brand stores.
Raymond today is one of the largest players in the fabrics, design wear, denim,
cosmetics & toiletries, engineering files & tools, prophylactics and air charter
services in national and international markets. All its plants are ISO certified,
leveraging on cutting-edge technology that adheres to the highest quality parameters
while also being environment friendly.
1. Raymond Ltd.
It is among the largest integrated manufacturers of worsted fabrics in the world
8
ColorPlus is among the largest smart casual brands in the premium category. The
company was acquired by Raymond to cater to the growing demand for a high
end, casual wear brand in the country for men & women
Joint Ventures
1. Raymond UCO Denim Pvt. Ltd.
The manufacturers and marketers of denim fabrics.
2. J.K.Ansell Ltd.
The manufacturers and marketers of condoms and surgical gloves.
9
3. J.K.Talabot Ltd.
Joint venture with MOB Outillage SA, manufacturing files and rasps for
international markets. (raymond india, 2016)
10
Clients
11
2. ABOUT DRESS MASTERS PVT. LTD.
Dress Masters Apparel Production limited is a subsidiary of Raymond limited,
established on September 10th 2016 in Peenya (Zone-1). This new unit manufactures
Jackets, Vest coat, and Trousers catering to Domestic as well as Export markets. The
state of the art, manufacturing facilities at the plant, helps in producing .4 million
Jackets, .3 million Trousers and 93 thousand Vest coat annually. With a total build -
up area is 155461 Sq. Ft. The Plant's forte lies in the manufacture of jacket. The unit
has a manufacturing capacity around 1000 suits (jacket, trouser and vest coat) and
shirts. There are 5 floors in the unit. The basement comprises of the fabric and trims
store and spreading and cutting section. The ground floor is warehouse. At 1st floor
vest coat and jacket are manufactured. At 2nd floor the trousers are manufactured.3rd
floor is not in used but recently it is in planning to convert it into jacket floor. 4th
floor is the canteen.
1. Sacoor Brother
2. Calvin Klein
3. Peerless Clothing
4. Charles Tyrwhitt
5. Banana Republic
6. Blackberry
7. JC Penny
8. Pelestrom
12
Name of the company RAYMONDS
13
2.1 Site Plan
Fabric store
Cutting department
CAD department
Maintenance store
HR department
IT department
warehouse
Embroidery section
Carpenter room
Store room
15
Figure 2.2.2: Pleats
ii.Jacket
Half Canvas
Full Canvas
Floating Canvas
No vent
Single Centre Vent
Double vent (one on each side)
Single Breasted
Double Breasted
16
Figure 2.2.4: Types of Jacket
Half Canvas
Full Canvas
DMAPL
Operations Support
Functions
Maintenance
Suit Cutting
IT (out Source)
Jacket Sewing &
Finishing
Quality Assurance
Warehouse
18
2.3 Workflow in Departments
The business is headed by Business Head (Vice President); he has four functional
heads supporting him namely,
GM (Head Manufacturing),
GM (Marketing/Merchandising),
GM (HR/Admin) and
GM (Finance)
The Department heads reports to the respective GMs for the various activities
and major decision making in the departments.
The work flow of Dress masters limited is a planned and coordinated effort from
all the departments. Giving the importance to quality and precision, checks are
performed at every stage of Manufacture right from pre-production to post-
production. There are 16 different departments in dress masters Limited. They
are:
Marketing and
Purchase Planning Fabric Accessory and
Merchandisin
Department Department Department Store
g Department
Industrial
Cutting Sewing CAD Quality
Engineering
Department Department Department Assurance
Department
19
All these departments are directly or indirectly related to the process of production.
The following flowcharts will explain the working of departments, which are directly
involved for the process of production right from receipt and conformation of order to
purchase than production to final finishing processes.
20
2.4 Flowchart Explaining Workflow in Departments
20. Sample
21.
Customer/ Mktg/Merchand Patterning Mktg/Merchand
Buyer ising Departmen ising
t
Department Department
S
Sample a
Proto approval m
p
l
e
Pre Production Mktg/Merchand
Sample (to pre ising Order Customer/
production confirmed Buyer
department) Department
Fabric
Trims
Inspectio Finish
n Sew ing
Cutti ing Finishing
Cutting ng Sewing Dept. Qualit
Dept. Dept. Qual y
22. Qual ity Chec
ity Che k.
23. Che ck.
ck.
21
24.
General Manager
(Marketing &
Merchandising)
Merchandiser Merchandiser
22
3.2 Workflow
Receipt of Enquiry
Performance of Feasibility
Planning of Material
To Sampling Dept
23
3.3 Process flow of Merchandising Department
24
26.PURCHASE DEPARTMENT
Before final order placement from the buyer, there is some development period
of 15- 20 days.
During this development period, purchase department advices the merchandising
department regarding the current rates of the fabrics and the trims in the market.
Based on that the merchandising department calculates the cost and quotes the
price to the buyer and the order gets confirmed.
After order confirmation, purchase department receives B.O.M. from
merchandising department for both fabric and trims of a particular department.
Then it starts sourcing the material from the supplier. 2-3 suppliers are evaluated
in the process.
Sometimes, suppliers are nominated by the buyers.
Thus the suppliers are decided based on their background and other such
conditions.
Eg. For Konaka, silver spark does only job work.
Average time taken by the fabric supplier : 45 days
Average time taken by the trims supplier : 15 days
25
27.5. PLANNING DEPARTMENT
Plant Manager
Planning Manager
Office assistance
This department does all the planning related to the production and the delivery.
They do of loading plans for the lines, fabric details plans and the shipment plans.
The department plans the entire production process from the receipt of the fabric, the
cutting plan, the quantity time of loading, type of fabric to be loaded etc.
The PPC does planning for all the Jacket and Trouser lines. Few things that have to
be considered for effective planning are:
1. Fabric & Trims available in-house or to be sourced
2. Sewing capacity
3. Which style to be loaded on a particular line
4. Maintaining input and output on daily basis in each and every line.
5. Machine availability
6. Shipment date
The BOM generated by the marketing department is issued to the stores and other
department by PPC. The PPC is also responsible for issuing cut tickets.
Once the buyer approves the pre-production sample, bulk production has to start. The
CAD department considering the following points generates the marker:
Fabric width
Length of the lay
Size ratio
Order quantity
26
A mini marker along with details for cutting is generated. The purchase department
generates the BOM. Depending on this the store department issues fabric and trims.
Based on the spreading plan the spreading department spreads the lay and the lay is
shifted to cutting table.
The cutting department cuts the lay on the basis of mini marker.
The marker plan is fed into the computer and the auto cutter cuts the patterns
accordingly.
The cut pieces are then fused and bundled.
The bundles are then coded and bundle tickets are applied on them.
The bundles are then issued to the sewing section according to the sewing plan
Order execution plan is prepared 120 days in advance.
28.
27
29. 6. FABRIC STORE
6.1 Departmental Hierarchy
This department is headed by the GM of Planning department. There is a head
of department who takes care of the proceedings of the department. The main
functions of the department are:
Receive the fabric as per BOM
Inspect the fabric
Conduct shrinkage and colourfastness tests
Issue to spreading dept. as per plan
Receive the end bits
Shell
Lining
Pocketing
Felt
Fusing
Canvas
Production
Sample Pieces
Cutting Department
Sampling Department
Total Manpower: 19
28
Figure 6.1: Fabric Store SOP
29
Process
Once the Raw material or fabric is been sent by the suppliers to the company and
once they reach In- House the concerned person keeps the track of all the documents
and material, he/she checks the quantity of material in–house and the material
ordered and cross checks i.e., he checks the materials against invoice/ DC / Packing
list.
After conformation, he/she enters the details in STAGE. After preparing the GRN
(Goods Received Note) they have to do the bill entry and keep the record and
maintain the document of whatever the slips received or delivered.
Then the entries are forwarded to the head office for the checking and payment. Then
after preparing the GRN of everything that has been received a process selection is
been made.
Checking
In this step, the work order is being prepared and also the delivery of goods and the
formalities regarding the goods has to be carried out. All this happens in the process
of receiving the goods to in-house, there has to be another action which the fabric
store has to take care of is the situation of delivering the fabric to the other units and
also to the cutting department of the same unit.
This department receives the required documents of the production issues/exports
and similar other related aspects from the merchants and then as soon as they receive
this they enter the details of the PO/export/process follow ups into the STAGE. The
department then checks the material availability with respect to the PO and other
documents as per the merchants given details. Then they look at the production
issues/export and as per that two things are done. First, they pick the material as per
the approval that would have been given by the fabric audit department and then they
prepare the challan and keep it ready for issue to the cutting department of the unit.
100% checking for the shell fabric, 10% for the pocketing lining and fusing.
30
Plan & Priority sheet
Taken all requirement
taken from fabric store Start 100% inspection for
assets for inspection with
department (issuing jkt, trs, vest coat
face side approval card
operator) in daily basis
Sanghai-YBJ180-4
31
Face side / Grain line approval card
Colour fastness (Steam wash, white liquid wash at jacket finishing)
Shade report(swatch)
Incoming Material
Unloading
Width Checking
Visual Inspection
8 Parameters Preparation
Receive Requisition
Issue Material
Receive Returns
32
7. TRIMS & ACCESSORIES STORE
7.1 Work flow of trims & accessories store
Goods received
Quantity Check
Swatch Preparation
Visual inspection/Quality
Storage in racks
Issueing materials
Trims are materials used to ornament or enhance garments. They are the visible parts
of a garment. Trims can be categorized as decorative and functional trims.
Trim store acts as a storehouse for accessories. It is the place where all the
accessories required are stored. Right from sewing threads, needles to packaging
material like poly bags and tapes etc. all are stored in the trims store.
Once the Raw material or Trims is been sent by the suppliers to the co company and
once they reach In- House the concerned person keeps the track of all the documents
and material, he/she checks the quantity of material in–house and the material
ordered and cross checks i.e., he checks the materials against invoice/ DC / Packing
list.
After conformation, he/she enters the details in STAGE. After preparing the GRN
(Goods Received Note) they have to do the bill entry and keep the record and
maintain the document of whatever the slips received or delivered.
Then the entries are forwarded to the head office for the checking and payment. Then
after preparing the GRN of everything that has been received a process selection is
been made.
33
Thread – colour, no. of ply, ticket no. etc.
Elastic – width, stretchability
Twill Tape – width, weave structure, colour
Hang Tags – size, colour, print, string
Stickers – gum strength, colour, size print quality etc.
Sizer – Print quality, size.
Polybag – measurement, print quality
34
SOP of Trims store
35
AQL Chart
0-280 13 0 1
281-500 20 1 2
501-1200 32 2 3
1201-3200 50 3 4
3201-10000 80 5 6
10001-35000 125 7 8
8. CUTTING DEPARTMENT
Cutting department has five sections.
CAD
Pattern Making
Spreading
Cutting
Fusing
8.1 CAD
36
CAD section is responsible for making the markers made by the pattern making
department and accordingly release the lay reports and cut order plan.
Spreading department is responsible for spreading the fabric according to the lay
reports released by the CAD department.
Cutting section cut the spread lay according to the online marker sent by the CAD
section. Also a hardcopy of mini marker & stickers are provided to them hence when
the pieces are cut, they are marked with the help of stickers at the very moment to
avoid confusion.
Ticketing & bundling section number each & every part so that while sewing proper
parts of the jacket or trouser can be matched.
The width report and patterns are received electronically via mail so that the CAD
department can start with a pattern, while file and 8 parameter reports is received
later in hard copy.
While issuing the patterns they need to make entry into records about patterns of
what order were received by whom in CAD from whom in pattern department and
take the respective signatures. The marker is directly communicated to the cutting
machine electronically (“Cut File”) or to the plotting machine.
They make around 60 markers per style (lining, shell, trim fabrics combined)
according to quantities corresponding to different sizes.
37
8.1.2 Process flow of CAD
Approved copy of
fabric details,
swatch cards, & 10
Parameters report
BOM received
Patterns making
Patterns received
department
Patterns checked
Planning with
with model sample
details
& fabrics
Cut file
generation
Placing same size
patterns in same
shade area
Correction
Issue to laying
Marker Made
Incorrect
Correct
Fill lay report & Consumption
check marker & ratio
checking
38
8.2 Process flow of Pattern making
Merchandiser
Sampling of one
piece
Fail
Passe
d
Pre-production Sample approved
sample made
Fail
Checking Correction made PPS approved
Passe
d
Size set
In house comments
Production
39
8.3 Spreading Section Process Flow Chart
Not ok
Checking Informed to fabric
of rolls store
Rolls assigned
according to width &
shade by CAD
department
Manual Spreading
In case of stripes more than 7mm & checks the spreading of the fabric is carried out
in pinning table.
40
8.4 Relaying
In case of stripes over 7mm and checks fabrics, the alignment in proper position is
very important in order to give the end product the required design match. It is
achieved by re-spreading the block cut panels with the help of needles & relaying
table. Relaying table has slots for needles to fit in. After relaying, the blocks are then
cut precisely on band knife cutting machine to get the ready cut parts.
41
8.5 Cutting section Process Flow Chart
Marker Plan
run
Cutting
Not ok
Panel Re-cutting
checking
Ok
Not ok
Defect Re-cutting
checking
Ok
Fusing
Ticketing &
Loading for
Bundling
sewing
42
8.6 Cutting process
The cutting department receives shell fabric, lining, fusing, canvas, felt, pocketing
from the stores, while referring to the indent.
Along with the fabric, the cutting department also receives CAD markers from the
CAD department, which includes the spreading report and the ratio details. Marker
gives an idea about the lay length.
All the pieces on marker can be given a number so that the machine can sequentially
cut the parts and the direction of blade movement can be changed.
43
Panel should perfectly match with the pattern.
The Production planning & control team sends the cutting schedule a week before.
Marker is prepared 3 days before cutting. And Cutting is done 1 or 2 days before
feeding date & stored.
Quality team reports the shrinkage% to the pattern master, who in turn adds it to the
final pattern, which is digitized and used for marker making.
Splicing is not done. Re-cutting of defected pieces is done. The fabric defects are
easy to identify as fabric inspector puts marks on defects. After cutting, pieces are
numbered, checked for defects and re-cutting orders given.
8.7 Numbering
The numbering of parts is done for a particular lay in order to avoid the
problem of shade-variation in the garment and to assure the different parts for a
single garment should be from the same layer of the fabric.
In addition, it helps the workers to have a perfect count of the parts and thus,
helps in avoiding the misplacement of parts.
44
Figure 8.7.1- Numbering
100% inspections of all the parts are carried out in order to check for any
defects in the fabric, line matching and any other problem.
After inspection and rejection, re-cutting of defective parts is done and
required numbers of pieces are cut of the required part of required size.
Then after the cut parts are ready, they are issued to the sewing department,
where they are bundled for appropriate WIP maintenance.
Extra rolls are sent back to the store. But the end bits are still kept in the
cutting department only, till the order is shipped.
45
8.9 Fusing section Process Flow Chart
Panel
Inspection
Block cut
Fusing parts
applied
Fusing
If all pieces
Pieces found
found
Bundling
Stored in the
trolleys to be
sent for sewing
8.9.1 Fusing
The fusing parameters (temperature, pressure & speed) are set as per the fabric and
interlining quality. Both woven & non-woven fusing are used as per specifications.
The fusing parameters are:
46
9. SEWING DEPARTMENT
Sewing department’s function is the crucial and most vital job in a garment industry.
This department makes the plans, pattern and material in to a garment; this is the
place where actual production takes place. After the fabric is released from cutting, it
is passed on to the sewing department for the sewing. The various parts are stitched
together to form the garments.
Jacket Lines
Trouser Lines
Vest coat lines
Trousers section has its operation in the basement and there is a Technical and a
Production Manager for this department. In the basement there is a Floor in-
charge, fifteen supervisors, twenty three Team Leader and five hundred and sixty
seven operators.
47
9.2 Flowchart showing the structure of Sewing Department
Quality Check
Quality Check
Warehousing
48
9.3 Jacket Line
There are three jacket lines at DMAPL, the brief description of their capacity and
clientele is as follows:
Prod.
Parts Section: collar, fusing, lining, small parts (canvas, facing flaps& facing) and
sleeve sections.
Assembly
The SAM for a basic Jacket is 65-70. The Jacket line follows the UPS system of
production. The material moves on overhead hangers.
Half Canvas
Full Canvas
Floating Canvas
No vent
Single Centre Vent
Double vent (one on each side)
Full Lining
Half Lining
The Jackets produced at DMAPL are world class and can be compared with the
quality the quality produced anywhere in the world. The major buyers are:
1. Charles Tyrwhitt
2. Blackberry
49
3. ITC
4. Raymond’s
5. BRFS
6. Peerless, etc..
There are four trouser lines at DMAPL, the brief description of their capacity and
clientele is as follows:
Double pleated
Single pleated
Flat front
The material handling and movement in the preparatory and front & back sections is
on waterfall trolleys and the assembly lines are based on UPS system. The material
flow is on manually controlled overhead trolleys.
50
30. 10. FINISHING DEPARTMENT
10.1 Process flow
The process flow of finishing department is as follows
Sewing section
Finishing section
Finishing processes
Rejected
100% inspection
Warehouse
Packing
Dispatch
The finishing facility at DMAPL is highly mechanised with modern state of art
machinery. The finishing department at DMAPL also has the exclusive license to use
the SI-RO-SET chemical for permanent crease setting. It is used for both jackets as
well as trousers. The finishing process for jackets and trousers is as given below
51
The trouser finishing involves the following steps:
Legger Pressing
Topper Pressing
Final Touch up
Inspection
Warehouse
52
The jacket finishing involves the following steps:
Spot washing
Shoulder pressing
Sleeve nipping
Sleeve blocking
Collar pressing
Lining pressing
Elbow pressing
Lapel Pressing
Button attach
Auditing
Inspection
Warehouse
53
11. QUALITY ASSURANCE DEPARTMENT
The objective of the quality assurance and control department is to deliver quality
product by thoroughly checking the quality of the product produced by the production
department as per the requirement of the buyer.
Quality Assurance department has its presence in every stages of the production. The
Quality Assurance Department‘s function starts with receipt of the fabric that is, once
the fabric and trims reaches the stores the quality of the fabric and trims are checked.
The operation continues throughout cutting and sewing process.
After each operation the quality checks are done and in the finishing department a
detailed quality check is done and is sent for alteration in case of any defects, finally
approve the trousers and jackets for packing.
Sub objectives:
To check the products for any defects
11.1 QC in stores
.
Checking fabric
Checking of
for 8 parameters Report sent to
product against
& generation of CAD
approved fabric
8 parameters department
& trims
report
54
After spreading, the fabric ply is pulled with the help of perforated paper to the
automatic cutter. Fabric is cut through automatic cutting machine.
Checking of
fabric lay &
Checking of Check marker
count no. of
cut parts for all parts
plies as per
lay report
Wrong size
Panel length/width
Parts missing
Mismatch stripe/checks
55
3. Lining inspection Quality report.
End line
1. End line Inspection report for 100% inspection.
2. End line inspection report for random measurement
SPI
Style Check
POCKET
Check the stripes/checks matching and bend for the breast pocket
Check the Shape of the chest pocket, Flap and side pocket
Check the chest pocket bone/welt stitch for puckering and stitch open
Check for edge of the welt pocket for pleat, stitch open.
56
FRONT
Check stripes/checks matching and bend of the side panel
Check the dart bend, dimp, loose stitch and stitch open
BACK
SPI
Damage
57
Check for front side seam loose stitch and puckering
SPI
Fabric damage
Shade variation
58
Check the sleeve lining loose stitch & open
59
Front end fullness improper
Bottom tight
Bottom uneven
Collar Height at CB
Button Stance
Collar Point
Lapel Point
Lapel Width
Collar Zigzag.
60
2. FRONT SECTION
Lining damage/weaving.
Lining open.
61
Sleeve vent improper.
GENERAL
Hanger loop miss and thread change.
SPI
62
11.4.2 Quality check of Trouser line
ZONE A: Top quality surface exposed to close customer security & affecting the
finished appearance of the garment
ZONE B: Surface area where spots are less conspicuous to customer viewing
ZONE C: Internal surface that are somewhat hidden from customer view.
POCKETS:
1. Check the stripes/checks of the side pocket matching with the front and
back panel
2. Check the Shape of the side pocket
3. Check the pocket bag open/improper
4. Check whether the left & right side pocket are mirror image of each other
5. Check the top stitch of side pocket
6. Check the stripes/checks of the welt pocket matching with the back panel
7. Check for welt pocket lip
8. Check the welt pocket bar tack
9. Check for pocket bone tacking
10. Check for edge of the welt pocket for pleat, stitch open.
11. Check the welt pocket stitch for puckering and stitch open
63
5. Check whether the left and right side pockets are mirror image of each
other
6. Check the side pocket top stitch
7. Check for side pocket stitch open/puckering
8. Check the brand label placement
9. Check the brand label stitch open/ puckering
10. Check the side pocket bag tacking
11. Check for welt pocket lip
12. Check for welt pocket stitch for puckering / stitch open
13. Check for welt pocket bar tack
14. Check for the back dart bend, dimp, loose stitch and stitch open.
15. Check side seam for seam puckering/ open stitch
16. Check in seam for seam puckering/ open stitch
17. Check for seam allowance
ASSEMBLY
1. SPI
2. Check the waist band loop placement
3. Check the waist band attach seam for puckering/ open stitch
4. Check whether the left & right waist band are mirror image of each other
5. Check the waist band extension shape
6. Check the hook & bar placement
7. Check the J –stitch is proper
8. Check for the front rise & crotch attach
9. Check for the front rise seam open/ puckering
10. Check the slider is proper
11. Check the button hole stitch open/ button hole placement
12. Check the back rise seam open/puckering
13. Check the side pocket bartack proper
14. Check the fly bartack
15. Check the waistband button placement
64
16. Check the back pocket button placement
17. Check the belt loop bartack
18. Check the bottom overlock
19. Check the bottom hem
20. Check for loose button
21. Check the zipper and slider functioning properly
22. Check for bottom sergeing improper
65
Head Accounts & Finance also heads the EXIM (Document) functions. There
are two executives of EXIM and one administrative assistant and an executive
admin in this department reporting to the accounts & finance head.
The department is involved in documenting and implementing all the export
and import policies which are in compliance with the Indian as well
international laws.
The functions of Documentation department are:
Licensing
Documentation of certification
Logistics Documentation
Customs Clearance
Bank documents
66
Table 13.1: Process flow of Exim department
33.
67
34.14. INDUSTRIAL ENGINEERING DEPARTMENT
Industrial engineering department is the brain of any industry and garment
industry is no other exception. The industrial engineering department is
responsible for all the factory operations. The operation of this department
starts from the receipt of the order from the buyer. Once the customers place
the order the merchandise department forwards the order to the industrial
engineering department for the processing. They then prepare the CM cost (cut
make cost). This includes:
Operational run
SAM (standard allocated minute) for each individual operation
Cost per machine hour is calculated
Standard achievable efficiency, etc are calculated and forwarded back
to the merchandise department
The operation continues once the order is confirmed. The APS or the Approved
Production Sample is given to the department, here the sequence of the process
is studied, and the necessary suggestions for changes are made if required. And
also in the receipt of the confirmed order the complete operation bulletin is
prepared, along with all the attachments, guidelines and files the documents are
forwarded to the production department with all other accessories. They also
have certain functions like going to the line while the batch is set, during menu
style loading and so on. They ensure the process is running smoothly the go for
continues checking till the first product comes out. After that they will have a
periodic check for line balancing exercise for productivity improvement. They
also monitor the manpower allotment. The finally the reports generate and the
performance is evaluated as per the actual target and the achievement and the
same report is sent to the management. The industrial engineering department
also under takes projects, setting up lines maintenance &utility, R&D activities
etc.
IE EXECUTIVE (TROUSER)
I.E. Assistants
PLANT HEAD
IE EXECUTIVE (JACKET)
I.E. Assistants
There are 5 I.E. assistants, 2 for jacket and 3 for trouser. They maintain the report
of production. The reports are mainly-
68
1. Time study
2. Skill matrix maintain
3. Production report
4. Efficiency and productivity report
5. Incentive report
6. IE performance report
69
35. 15. MAINTENANCE DEPARTMENT
15.1 DEPARTMENTAL HIERARCHY
assistants(trousers)
assistants (Utility
section)
Assistant maintenance
Plant Manager Maintenance officer assistants(Jackets)
officer
assistants(Pressing)
assistants( Cutting)
1. Servicing of machine.
2. Modifying machines for the ease of using
3. Checking of Boilers for steam.
4. Water supply for the whole plant
5. Hard water refining
6. Electricity supply—if power is gone then starting of generator.
7. Building maintenance.
8. Oil change.
9. Replacement of defective parts
10. Servicing of Motor.
11. Checking of Motor
Finance
70
o Sales booking
o Expense booking
o Payments booking, that is, payments of bills as per the Goods Received Note or
GRN of the stores department.
o Finance operation mainly takes care of all the finance operation. They are:
Collection, that is, collection of payments from the customers.
71
17. HUMAN RESOURCE DEPARTMENT
The Human Resource Department is headed by the HR manager, under who is
the assistant manager.
The department also comprises of junior managers for different sectors like
Recruitment, Welfare, Transportation and Payroll. The total strength of the
department is 17, including various office assistants and trainers.
The recruitment can be in various formats like Campus placement Cells, In-
office recruitment, Recommendations or Walk-In Interviews depending on the
requirements of various departments prior in hand with the HR.
Every employee and operator is made to set up a new salary account in which
the pay checks are deposited every month. A muster roll and absentee register
is maintained for proper records. All the operators are on a fixed wage basis.
Overtime is paid as double the amount of their basic.
The HR is also responsible for making sure the presence of floaters and
contracted labour.
The welfare segment takes care of the basic amenities of the operators since
95% of them are female operators. They are provided with the facility of Child-
Day care. Also once in a month, the operators are engaged in recreational
activities.
HR manager
Assistant HR
Manager
72
18. WAREHOUSE
18.1 Departmental hierarchy:
Warehouse Incharge
Warehouse is the last stage where the trousers are stored till the date of
shipment.
It has the capacity of 80000 pieces per month. The major problem faced by the
trouser warehouse was the missing trousers due to four exit points. Trims were
delayed resulting in a stuck up inventory in packing area which eventually
flooded warehouse.
73
Space allocation in warehouse is line-wise too. Line-wise receiving and hourly up
gradation of the status colour-wise and size-wise is done with 100% checking for
packing accuracy and daily tallying of sending and receiving report.
18.4 JACKET
Warehouse for jacket is huge with a capacity of 40000 pieces per month. Here too
line-wise segregation is done though not followed. There‘s only one entry point for
the jackets. All other exit points are sealed with security code. Dehumidifiers are
provided at places on the request of the buyer Konaka which wants a particular
temperature and humidity to be maintained. Maintenance department has to check it
daily. Final audit, loading in the container and dispatch of the garments takes place
from the warehouse.
74
PROJECT
75
1. PROJECT OVERVIEW
1.1 Introduction:
In the 1980’s the garment industry was led by fashion and retailing and the emphasis
was on technologies in the demand-related parts of the supply chain. India ranks
among the top target countries for any company sourcing textiles and apparel.
Indeed, apart from China, no other country can match the size, spread, depth, and
competitiveness of the Indian textile and apparel industry.
Moreover, the global elimination of quotas at the end of 2004 has greatly enhanced
the opportunities for sourcing from India. India supplies over US$13 billion worth of
textiles and apparel to the world markets. And exports are growing rapidly as more
and more buyers around the world turn to India as an alternative to China. In 2005 –
spurred by the global elimination of quotas – shipments to the EU soared by 30%
and those to the USA shot up by 34%. These increases are remarkable, given that EU
imports from all sources rose by only 8% while US import growth was just 6%.
Consumer spending is slowing down all over the world. Retailers are looking for real
innovation from their suppliers. They want really new garments made from new
fabrics and yarns. They want new services to offer their customers. Competition in
the late 1990s will be based on the capabilities and core competences of textile and
clothing companies and on the building of long-term supply relationships. There are
many opportunities to be addressed. Textile and clothing machinery will continue to
be improved but the most interesting technologies for the 2000s are in the areas of
fibres, fabrics, measurement, control and multimedia. We can say a garment industry
is an independent industry from the basic requirement of raw material to final
products, with huge value addition at every stage of processing, Apparel industry is
largest foreign exchange earning sector contributing 15% of the total country export.
In this scenario, the Indian garment industries have witnessed substantial
improvements in recent years. But the unnecessary capital investment is not going to
solve the problem entirely; moderately this will turn out the waste in long run. The
implementation of lean manufacturing is greatly recommended, in order to identify
the waste and to eliminate them.
76
1.4 Project Title
Achieving Quick Changeover through SMED implementation at Dress Master
Apparel Pvt. Ltd., Bengaluru.
1.5 Significance of the Project
Most of the factories in India still follow the traditional ways of changeover in that
they do not segregate their internal and external activities, maintain high inventory
levels, having large lot sizes, etc. But this generates lots of problems and leads to
under-utilization ofresources and time. This is a major loss for the organization, as in
the current situations where there is an increasing demand in the product variety,
smaller lot sizes, unpredictable market trends and very tight profit margins, every
penny saved is a penny profited for the organization. And this cannot be done by
following earlier methods of setup and inventory management. The next step for
organizations catering to high variety low volume orders is quick changeover,
without which the company is liable to lose a lot. And the sooner they realize this,
the better.
2. REVIEW OF LITERATURE
2.1 Lean Manufacturing
The core idea of lean manufacturing is to maximize customer value while
minimizing waste. Simply, lean means creating more value for customers with fewer
resources.
A lean organization understands customer value and focuses its key processes to
continuously increase it. The ultimate goal is to provide perfect value to the customer
through a perfect value creation process that has zero waste.
To accomplish this, lean thinking changes the focus of management from optimizing
separate technologies, assets, and vertical departments to optimizing the flow of
products and services through entire value streams that flow horizontally across
technologies, assets, and departments to customers.
Eliminating waste along entire value streams, instead of at isolated points, creates
processes that need less human effort, less space, less capital, and less time to make
products and services at far less costs and with much fewer defects, compared with
traditional business systems. Companies are able to respond to changing customer
desires with high variety, high quality, low cost, and with very fast throughput times.
Also, information management becomes much simpler and more accurate.
77
changes to the end product – a Model T assembly line produced only the Model
T. It was also a "push" process, where Ford set the level of production, instead of
a "pull" process led by consumer demand. This led to large inventories of unsold
automobiles, ultimately resulting in lots of wasted money.
Other manufacturers began to use Ford's ideas, but many realized that the
inflexibility of his system was a problem. Taiichi Ohno of Toyota then developed
the Toyota Production System (TPS), which used Just In Time manufacturing
methods to increase efficiency. As Womack reported in his book, Toyota used
this process successfully and, as a result, eventually emerged as one the most
profitable manufacturing companies in the world.
78
2.1.3 Lean Manufacturing Process
The Lean Manufacturing Process has three main stages:
Stage 1: Identify waste
According to the lean manufacturing philosophy, waste always exists, and no
matter how good the process is right now, it can always be better. Lean
manufacturing relies on this fundamental philosophy of continuous
improvement, known as Kaizen.
One of the key tools used to find this waste is a Value Stream Map (VSM).
This shows how materials and processes flow through the organization to bring
the product or service to the consumer. It looks at how actions and departments
are connected, and it highlights the waste. As the VSM is analyzed, the
processes that add value and those that don't can be seen. Then a "future state"
VSM is created that includes as few non-value-adding activities as possible.
Stage 2: Analyze the waste and finding the root cause
For each waste identified in the first stage, figure out what's causing it by using
Root Cause Analysis. If a machine is constantly breaking down, one might
think the problem is mechanical and decide to purchase a new machine. But
Root Cause Analysis could showthat the real problem is poorly trained
operators who don't use the machine properly. Other effective tools for finding
a root cause include Brainstorming and Cause and Effect Diagrams.
Stage 3: Solve the root cause and repeat the cycle
Using an appropriate problem-solving process, decide what must be done to fix
the issue to create more efficiency.
79
4. Single Minute Exchange of Die (SMED) – This helps an organization build
flexibility into their production. For example, in the automotive industry, it
could take days to change a line to produce a different car model. With
SMED, the assembly process and machinery are designed to support quick and
efficient changeovers. (Here, a "die" is a tool used to shape an object or
material.)
5. The 5S Philosophy – Lean manufacturing depends on standardization. One
wants their tools, processes, and workplace arrangements to be as simple and
as standard as possible. This creates fewer places for things to go wrong, and
reduces the inventory of replacement parts that one needs to hold. To
accomplish a good level of standardization, the 5S System is used.
Lean manufacturing focuses on optimizing the processes and eliminating waste.
This helps cut costs and deliver what the customer wants and is willing to pay for.
With a lean philosophy, one can enjoy the benefit of continuous improvement. So,
rather than making rapid, irregular changes that are disruptive to the workplace,
one makes small and sustainable changes that the people who actually work with
the processes, equipment, and materials will take forward.
This systematic and simple approach is very effective across all types of
industries. What's more, ultimately, a process without waste is much more
sustainable.
80
of manufacturing, assigned him the task of matching a German company’s die-
changeover speed of an astounding two hours for an entire tandem press line. The
company’s previous time had been 10 hours or more.
To meet the challenge, Shingo first targeted the Germans’ two-hour mark, then
realized that by the time he achieved that goal, the Germans would be even
faster. He decided to set his own goal of less than 10 minutes, leapfrogging the
competition. The “single minute” part of SMED refers to a single-digit time limit
-- nine minutes or less, not a single, 60-second minute (although small dies are
regularly changed in less time that that).
Shingo and his team discovered that if setup time was greatly reduced, batch
sizes could shrink proportionately. Today, inventory is the enemy of production
efficiency and effectiveness. More than 50 years ago, Shingo realized that
inventory costs more than originally thought. Materials “on the shelf” have to be
bought and paid for much sooner, and so does the labor used to make and store
finished and work-in-process goods. The cost of floor space and new warehouses
is considerable, as is the cost of ensuring those facilities and the products they
contain.
Run-up phase: This phase starts when production for the new style is
commenced and continues until consistent output at full capacity occurs. Run-up
period extends till each operation (including new operations) reaches the
specified production and quality rates consistently.
81
2.2.3 Goals of SMED
Following are the goals of implementing SMED in a factory:
1. Reduce inventory
2. Reduce batch sizes
3. Reduce changeover time
4. Reduce impact on equipment utilization
5. Improve quality after changeover
6. Improve repeatability
7. Improve throughput
8. Improve flexibility
82
2.2.6 Implementing Single Minute Exchange of Die
Quick changeover is not an isolated process, where specially trained work force
carries out the changeover activities. It requires focus on Organizational
improvement and design improvement. Following are the six techniques that
should be considered while implementing SMED:
Segregate or set apart the internal from external setup operations (tasks)
Convert internal to external set-up tasks
Standardize functions
Adopt parallel operations
Improve design of machine equipment
Use functional clamps or eliminate fasteners and adjustments.
It is quite evident that limited scope of design improvement makes SMED
implementation in apparel industry to rely mainly on organizationalimprovement.
Operation type
Machine type (segregated as internal/ external)
Machine number
Stitches per inch (SPI)
Required Settings
Operations of old style and new style should be compared for segregation of
internal and external elements. If operation for new style is already being
performed in old style then the element is internal, thus the machine type should
be filled as internal element. But if a machine has to be arranged from outside or
a machine from the old style will become idle but can be utilized at some other
operation in the new style, then that should also be filled as external element.
Along with machine type attachment details should also be filled by referring to
operation bulletin.
83
1. Convert Internal Task to External: Since reallocating task by
converting internal activities to external activities significantly reduces
set-up time, opportunities for such conversions should be identified.
Example, loading of parts before the end of old style or template
preparation in advance.
2. Investigate the use of Automates/Work Stations: Like continuous
bottom hemming machine for knits Tee/Polo shirts (internal to external
elements) or the use of fusing machine in cutting section rather than in
sewing line.
3. External Machine Setting: External machines should be set-up by the
mechanic according to the machine plan in advance (in run-down phase).
Typically machine setting should include machine parameters like gauge
change, folder/presser foot change, needle change/ removal, SPI
adjustment, programming, etc. as per the requirement of new style.
Machine setting should be approved for quality by the quality supervisor
and machine marked with ‘Setting OK’ tag.
4. Adopt Parallel Operations: Set-up parallel operations example, set-up
of operations in different sections simultaneously (front and back
sections). Note that the tasks must not be dependent upon each other.
Usually, the creation of parallel tasks requires more manpower, so
increased personnel must be considered.
5. Eliminate Waiting Time: Concentrate on efforts to eliminate waiting
time during changeover process. A simple reallocation or reorganization
of group tasks may help reduce this waiting time. For example,
performing bottom hem operation before waistband attach in a denim for
starting few bundles, as setup of waistband operation consumes more
time.
6. Training and Development: Traditional changeover procedure can be
modified by broadening the scope of a technician’s abilities through
training programs. This will allow a technician to perform tasks that he
or she was not previously allowed to do, and thus remove dependency on
another technician for completion of a task.
7. Minimize Trials and Controls: Trials and controls can be minimized
by formalizing procedures and utilizing standards. Checklists can be
used, and technicians can be held accountable for key procedures by
signing off on the checklists.
8. Standardize Functions: Formalize standardized operation instructions
for changeover process. Examples develop standard operating
procedures defining responsibility and accountability.
Design Improvement:
84
feasible, for example use magnetic edge guides in place of screw
fastener type.
2. Improve design of manufactured products: Exercise the scope of
changes in product construction parameters in consultation with buyer to
facilitate reduction in set-up time. For example, margin for strip
matching at sleeve joint for yard dyed knits, increasing/ decreasing SPI
by a unit as the specified SPI cannot be produced on some machines or
to increase the width of J-Stitch so that it can be easily performed on J-
Stitch machine. However, since such changes require buyers’ consent,
which often is a time-consuming process, they have limited application.It
is observed that in comparison to design improvement, organizational
improvement is cheaper, easy to implement, and produces significant
reductions in changeover time.
3. METHODOLOGY:
3.1 Defining Methodology:
The project is being carried out in five phases:
1. Define
2. Measure
3. Analyze
4. Implement
5. Control
1. Define: This phase is all about defining the objectives, the scope, the areas to
be worked on and the goals of the project. Familiarization with the factory’s
ways of working is also a part of this phase.
2. Measure: The main objective of this phase is to measure the following:
o Changeover time
o Breakup of the changeover time with causes
To achieve this, some new formats, matrices and reports in the form of graphs
and paretos were developed along with several reports already being prepared.
The usefulness of this step is that a record of the style changeovers is being
maintained which will later help in monitoring the progress and also in
identifying the areas of concern. And, since the charts and paretos would be
displayed for each line and each section separately, this would also provide
85
visibility to the problems being faced in the factory, which would in turn
create more ideas for improvements in the form of kaizens.
3. Analyze: This phase is about making deductions from the earlier phase about
areas of concern and future plan of action. For this, the use of charts and
graphs and discussions with concerned people is to be done.
The activities carried out in this step are as follows:
1. Video Analysis
2. SOS Preparation
3. Conversion of internal activities to external
4. SOS preparation
5. Style Preparation
6. Streamlining Pre-Production activities
This step is the most critical step of the project, since a wrong analysis would
cause all the earlier steps to go wrong and a lot of time and energy would be
wasted. Its usefulness lies in the fact that the critical area identification
depends solely on this step where each and every cause is analyzed and
decision taken as to which problem to eliminate first, and how, and why? And
if improvements are noticed, then what is the measurement of the
improvement.
4. Implement: In this phase, problem areas defined earlier are to be focused on
and plan action determined earlier is to be carried out with proper inputs from
concerned people.
Steps to be carried out in this phase are as follows:
o New Method testing
o Revision
o Operator training
o Trial runs
5. Control: This phase is about improving and standardizing and making the
improved processes an integral part of the changeover process and ensuring
that the process is maintained properly. It is all about putting proper checks in
places to ensure that everyone in the organization follows the practices.
86
4. DATA ANALYSIS:
4.1 Understanding the concept of changeover
Data regarding changeover time, techniques developed by Shigeo Shingo to carry
out changeover was gathered from different research papers to understand the
concept of changeover. Case studies related to SMED implementation in different
companies were also analyzed to get a rough idea of various problems faced
during changeover and to relate them to the company in study.
4.2 Define
A major problem faced by Laguna Clothing during style changeover is the start-up
loss which is a major loss for the lines affecting planning and meeting deadlines.
So, the project focus will be on analyzing and reducing this start-up loss.
4.3 Measure
In this phase, few style changeovers were studied and time study done using Style
Changeover Analysis Sheet for these styles for measuring the current style
changeover time in the lines.
87
Style change 1
Rework of
previous style
Run up period
37%
41%
Machine layout
planning
1%
Inline Machine setting
inspection of 6%
garment Technical issue
Thread change
1% 1%
0%
88
Total
Activity Time ( in minutes)
time (in
minutes)
Layout Planning 63
Planning time M/c Planning 306 854
Style analysis 58
machine cleaning 15
work aids 10
Machine setting time machine setting on actual 95
10
fabric
machine movement 60
Pilot demonstration 0
Operator
operator change, re-
demonstration and idle 05 605
demonstration
time
Idle time 600
Marking
0
Pattern and Quality
Template making 0 400
issue
Quality standards 180
cutting accuracy 0
Cutting and fusing time 45
fusing, folding & pairing 45
1999 minutes
Total
33.31 hours
Table 4.3.1: Time for calculating changeover
89
Style change 2:
M/c checking
22% Batch setting
40%
90
Time (in Total
Activity
minutes) time (in
minutes)
Layout Planning 10
Planning time M/c Planning 8
324
Style analysis 306
machine (un)availability 367
Machine setting work aids 15 579
time machine setting on actual fabric 546
machine movement 18
Operator waiting time 135
Operator
operator change, re-
demonstrationand 90 250
demonstration
idletime
Idle time 25
Marking
0
Pattern and Quality
issue Template making 21 33
Quality standards 12
Cutting and fusing cutting accuracy 48
time fusing, folding & pairing 22 70
1256
Total minutes
21 hours
Table 4.3.2: Time for calculating changeover
Problems Identified: The style changeover observed in the company were of the
repetitive style. Few are the problems which were encounter during the style
changeover:
91
were placed, and for; P.O. number #2106 of brand Raymond Apparel Limited
two waist band attachment machines were used.
2. Communication gap: It has often been seen in a factory that there is a lack of
proper communication among the various departments. This seriously affects the
production activities of the factory, especially so at the start and end of the
production activities, for if proper communication is not passed on to the right
person at the right time, he cannot make arrangements to make sure that the exact
requirements are met at theright time. For example, if the IE department does not
pass on the information on to the maintenance department about the batch
setting, the maintenance department cannot be expected to be prepared
beforehand with the required attachments and work aids and the required
personnel.
3. Quality problem: There are several quality related problems during a style
changeover like:
1. Rework at the start of the batch setting: Rework at the start of batch
setting is a very commonly faced problem during style changeover. The
reason for this can be many: machine was not setup properly or the operator
is not skilled enough or the quality requirements were not fully
communicated to the concerned people on time. This creates a lot of problem
at the start of the style changeover, increasing the run up period to a
maximum and also raising quality concerns for the order if the order quantity
is too less.
2. Clearing of alteration pieces at the end of the current style: This is
another major quality problem faced during a style changeover. The alteration
pieces for the previous style are not cleared on time and are left pending to be
done at last. This increases the run-down period two-fold as the alteration
pieces need to be first brought back to the original state and then altered. Also,
this means that the machine setting for the new style cannot be done until the
alteration bundles are cleared, again resulting in a high changeover time for
the factory.
4. Operator problem: Often it is seen that an operator allocated at an operation
is not properly skilled in that operation. Inline training is then given to the
operator to increase their efficiency. During this time several issues of quality
related problems also might come up which would need attending to. This
would result in a higher changeover time. Even absenteeism is a major
problem related to the operators which if occurring in sufficiently large
numbers can cause serious damage to the factory’s production for the day.
Sometimes, the operator attitudes also have a negative impact on the
production activities for a factory. The attitude can be of any of the following
types:
1. This operation is not my job. I will not do it.
2. I will do this job only if I am allowed to do the operation on only this
machine.
3. I will not learn a new operation. I am comfortable doing this operation.
4. I don’t care what happens, I will do only this operation. Even if I know
some more operations, what is the use of telling them.
92
Sometimes, some personal problems also seriously hamper a good operator’s
working, and if this happens to be on a day of a style changeover, it is bound to
create problems for everybody. Sometimes it is also seen that the required number
of maintenance personnel are not available at the required place at the right time.
This is also an area of concern for the factory if this keeps happening at regular
intervals.
1. Loading problem:Quite often delayed loading of cut parts and/or trims in the
line increase the changeover time because, quite simply, the operator does no
productive work for the time he/she has no feeding. This situation is not good for
any factory. The reasons for delayed loading could be several: like cut parts not
ready on time, trims not inhouse on time, absenteeism of feeding helper, rigid
mentality that the loading should be taken only after the last pieces of the
previous style are clear, etc. Sometimes, it also happens that the trims loaded are
wrong or insufficient quantities are issued. Another concern sometimes occurring
is that the pattern for the cut parts received are wrong, either due to the mistake
of the cutting department or the pattern making department. Even imbalance in
the parts section leading to an improper matching for assembly section increases
the run-up period for an incoming style.
2. Batch setting: Batch setting involves necessary activities to prepare a line for
an incoming style. It includes activities such as Machinery Planning, Capacity
Planning, Operator Allocation, Line Balancing and Skill Development for new
styles. For new styles this causes major problems, especially for styles having
some new operations. The reason is that sufficient attention is not paid to the
batch setting task in terms of skill development and skill mapping. As a result,
the new operation often becomes a bottleneck right from the start, increasing the
startup time for the line. Also, when sufficient numbers of required machines are
not available to be shifted into the lines, batch setting becomes a problem and
attaining the peak production often needs more time than is anticipated.
4.4 Analyze: In this section detailed analysis of changeover of each style was done,
by differentiating the internal and the external activities, and making a note of
which activities can be done externally. Examples of the style changeovers
mentioned earlier are given below:
93
Table 4.4.1.1: Separating internal and external element
S.no. Activity Scenario before Actual scenario
implementation
1 Machine plan Internal External
Table 4.4.1.2: Table showing operation needed to separated internal and external
94
Knee lining (Front ss o/l) Yes
Front o/l (inseam and Yes
rise) Yes
o/l Back
o/l Yes
Pairing
Yes
Front pocket attach Yes
Yes
Front pocket point (left) Yes
Front pocket point (right) Yes
Front pocket lock Yes
Fly attach Yes
Back dart
Back dart pressing and Yes
fusing
Back pocket welting Yes
Yes
Back pocket corner lock
Yes
(v-tongue)
Yes
Back pocket ironing
Yes
Back pocket keyhole
Back pocket lock
Yes
Back pocket top lock
Yes
Back pocket top stitch
Yes
(edge stitch)
Side seam join
Yes
Side seam iron (press
open)
Attach front pocket with Yes
side seam (o/l side) Yes
Bar tack (Back pocket & Yes
front pocket inside) Yes
Bottom tape attach Yes
Bottom tape lock Yes
Inseam join Yes
Inseam press open
Stay stitch Yes
Belt loop marking and Yes
attach
Tape attach at J- Fly and Yes
marking for waist band
Waist band attach (2) Yes
Waist band extension Yes
lock and turn
95
Hook and bar attach
Yes
Right fly facing lining
Ironing (fly facing lining Yes
and Waistband) Yes
Fly facing top stitch right Yes
fly extension closing Yes
Slider
Yes
Front rise and crotch
Yes
J-fly topstitch
Yes
Marking and attaching Yes
brand and care label Yes
Back rise
Fusing waist band Yes
Inline checking Yes
Yes
Run tack
Bar tack (loop bottom) Yes
Crotch lining
Curtain felling on waist Yes
band
Waist band extension key Yes
hole Yes
Button attach (back Yes
pocket, waistband, care
label) Yes
Loop finishing
Yes
Bottom overlock
Yes
Pin tack at waistband &
Crotch
Yes
Bottom hem
Trimming
Yes
Loop cutting and button Yes
wrapping
Yes
96
4.4.2 Style change 2 BRFS to RAL:
Firstly, the activities leading to the style change were observed and based on
their nature classified as below:
Table 4.4.2.2: Table showing operation needed to separated internal and external
97
Pocket & front fusing iron Yes
Front & back
Back o/l
Knee lining o/l (front lining
attaching)
Front o/l (lining finishing) Yes
Loading & pairing Yes
Front pocket attach Yes
Front pocket pointed Yes
Front pocket lock Yes
Front pocket top stitch & pocket Yes
kinari Yes
Side pocket & front rise o/l Yes
fly attach Yes
sew back darts and size label Yes
Press and fuse back dart Yes
Back pocket welting Yes
Back pocket corner lock Yes
press back pocket Yes
Back pocket keyhole Yes
Back pocket toplock Yes
Back pocket button attach Yes
Back pocket bartack Yes
Back pocket restitch
Back pocket restitch Yes
Assembly-1 Yes
Sideseam Yes
Inseam Yes
ss stay stitch Yes
ss and is iron Yes
loop attach & marking Yes
tape at crotch lining Yes
WB marking and attach Yes
WB marking and attach Yes
WB extension Yes
Hook & bar Yes
Right fly lining attach Yes
Right & left fly iron Yes
Right fly edge stitch Yes
Slider Yes
Front rise Yes
J- stitch Yes
Back rise Yes
98
Assembly-2 Yes
Loop down bartack Yes
Front pocket bartack Yes
Keyhole at wb & right fly Yes
Button attach @ WB & left fly Yes
WB hemming Yes
Loop finishing Yes
Crotch lining attach Yes
Crotch l ining press Yes
Bottom o/l Yes
Bottom hemming Yes
Pin tack Yes
Trimming Yes
Wrapping & knotting
5. IMPLEMENT/REDUCE:
Step 1: Video analysis of different changeover operations
Purpose: The main objective behind doing the video analysis of the changeover
operations was threefold:
1. To find out and eliminate Non-Value-Added Activities (NVAA) or
Muda
2. To create Standard Operating Sequences (SOS) for repetitive standard
activities
3. To set a Standard Target Time in which to complete the desired activities
99
Number of observations: 7
How it was done: The process of video analysis for various style changeover
activities by following these steps:
100
charts, matrices, etc. should be such that it can be understood and used by anybody
and everybody, and filling them up should not take too much of time.
Outcome: The outcome was the development of the following:
1. A matric for calculation of changeover time
2. A checklist to be filled before style changeover
3. An End of Line (EOL) chart for style changeover
4. A checklist for documenting machine setup and layout change time
Benefits: The company’s goal of measuring and maintaining a visual display of
changeover time for one week along with its paretos was achieved by developing a
standard matrix for automatic calculation of run up and run-down period of each
style changeover. This meant that the measurement of run up and run-down period
was very much systematic and error free, giving much reliable results than doing the
same work manually. And a visual display for this in the form of end of line (EoL)
charts has been prepared which also updates automatically based on the inputs
provided by the user. Some other formats were also developed, like, a format for
monitoring the machine availability, machine setting, raw material availability, etc.
was developed for use during a style changeover. These would help monitor the
plant’s performance levels after each style changeover and take necessary actions
wherever necessary.
101
Figure 5.3: Layout change time monitor format
102
Figure 5.4: Checklist for style changeover
103
Figure 5.5: Checklist for style changeover for sewing process
104
Step 3: Formation of style changeover team
Purpose: A changeover team was required in the factory for making sure that the
planning done by the planning department is followed as closely as possible
Justification: The factory is provided inputs from the merchandising team about the
various orders coming its way for production in its lines. But without proper inputs
from them and the various other departments, who are subsequently dependant on
merchandising team for information, the changeover process becomes a major area
for concern with problems occurring everywhere. For example, the IE and the
Training department are often unaware of the bottleneck operations in a particular
style. So no planning is done ahead of its loading in the lines for optimal production.
And as soon as the pieces reach the critical operation, problems start creeping up,
increasing the changeover time considerably. Another example. A new style is
loaded in the lines, but the trims are not yet in house. Since no one has been
following it up, no one knows that the required trims are not yet available until the
pieces reach the operation where the trim has to be used. The pieces can now no
longer move for want of trims. The purpose of this step is to stop such types of
occurrences from happening in the factory.
Outcome: A very novel approach has been adopted in the factory for this purpose.
The IE team is informed beforehand about the upcoming styles for the next two
months. The team starts taking follow-ups on these styles from all the required
departments. They check when the patterns are in house, what are the major
105
bottlenecks in the style based on the samples given to them, they conduct meetings
with merchandisers, maintenance, production and quality people at least two weeks
before the style is being loaded in the lines for discussions on the styles, its critical
areas, counter measures on how to get maximum productivity, get the OBs,
technical sheets, and every other follow up and actions found necessary to make
sure that the style does not become a headache after it has been loaded in the lines.
This team checks for the folder availability, machinery requirements, and analyses
each style and keeps the information in a format known as the Single Sheet
Information System. With the help of this sheet they are able to tell which style
requires what and whether the factory is ready to load the particular style in the line
at any point of time.
Benefits: The benefits of this step are enormous. Although it required a lot of
changes in the organizational level and in the mindsets of the people, this step was
very much successful in solving major critical problems for the factory. The benefits
are manifold:
1. The factory is well prepared to take on any style that comes its way with
people well aware of its requirements beforehand
2. The problem of untrained operators handling new and critical operations
leading to bottlenecks has been minimized
3. The availability of machines, attachments and trims are checked beforehand so
that availability of resources is not an issue any longer
4. Style wise analysis done beforehand gives the factory people a fair idea of
what to expect and where all they need to have checkpoints to ensure that
everythingmoves smoothly, so they are prepared for it every time a new style
is loaded in the lines
5. Each department of the factory is informed and made ready for the different
styles coming their way which increases participation, innovation and
information circulation among the different departments, which makes sure
that almost every aspect of the style has been discussed and appropriately
reviewed for problems and it has been troubleshot
Purpose: The purpose of this step is to simplify the tools used for change in
machine settings and for attachment fixing to reduce machine setup time during a
style changeover
106
free, time is lost waiting for the machine to set up. But if a simple tool was to made
which could make sure that there are no screws to opened and closed, and the
pressure foot can be changed with a single touch, this waiting time could be
eliminated, giving maintenance people more freedom to work and reduce machine
setup time, even further.
Outcome: The outcome of this step was the purchase of a simple device from an
oversee vendor for quick pressure foot change in the machines. The tool is a simple
device allowing operators to change the pressure foot at just a touch of their
fingers.
Benefits: The major benefit of this tool is that it eliminates the need to wait for the
maintenance people to come and fix the pressure foot. This ensures that manpower
is always available at more pressing operations where maintenance personnel are
required to the needful. Also, time saving is done, for a normal pressure foot
change sometimes can take two minutes or more. But this tool gets the same work
done in a matter of seconds.
Purpose: The purpose of this application is to have a central database for all the
attachments in the form of folders, guides and gauges and style details in terms of
attachments requirementof upcoming styles, for proper communication between
the IE and the Maintenance departments.
Justification: The need for such an application was felt because of the following
reasons:
1. The maintenance team had no proper record of their assets with which anyone
could identify the different attachments and check their availability prior to a
style being loaded in the line
2. Proper communication flow for the requirements of maintenance team could
not be seen in the factory due to a lack of proper asset database. This
application would bridge the gap by having a central database accessible by
IED and the maintenance team simultaneously
3. It was sometimes seen that when a style was loaded in the lines, its
attachments would be unavailable or there would be a shortage, for it was in
use in some other line and could not be used for the production of the given
style. This application would check the availability of the folders, guides and
gauges for different combinations of styles that could be loaded in the lines at
any given point of time
Outcome: An application was prepared on VB.NET with a central database on the
company’s local server. It is easily accessible by all through a front end that can be
installed on any computer. It displays and stores information related to the number
and kinds of attachments, different buyers, different styles and their folder
requirements. It is very user friendly and can be used by anyone in the company
107
Benefits: The application has brought about the following changes in the process
of style changeover:
1. The communication gap between the IED and the Maintenance departments
has effectively been bridged, even if there is no direct interaction between
them
2. The maintenance department now has a record of each and every attachment
in its possession and is now answerable for any discrepancies
3. The IED has also been made accountable for the number of attachments and
machinery details that would be required for given style
4. Unavailability of attachments would also no longer be an issue during the style
changeover, since it has already been checked for availability
The current status of the changeover process of the factory is summarised below
in the table:
108
6. RESULT AND DISCUSSION:
6.1 Reduction in changeover time:
M/c layout
15%
Operator
waiting time
30%
Inline
inspection of
garment
3%
M/c
arrangement
44%
109
Operator waiting time 02:03:00
Discussion 00:10:00
Total 06:51:04
Quality issue
3%
Line
disturbance
M/C setting 6%
52%
Thread change
1%
Operator
waiting time
19%
110
Operator waiting time 01:02:00
Disturbance 00:20:03
Total 05:43:38
111
Table 6.1.3.1: Changeover time study summary before implementation
112
Table 6.1.3.2: Changeover time study summary after implementation
113
Table 6.1.3.3: Figures to show changes
4:48:00
0:00:00
19:12:00
14:24:00
9:36:00
4:48:00
0:00:00
M/C setting Waititng time Thread change Run up + Run Garment Other elements Total
itme down time inspection
114
sure that the improvements are carried out is in itself a big task which too
requires that the management be supportive and the employees motivated to
do that extra mile to make continuous improvement an integral part of the
project. Also, for a factory facing style changeovers practically every day,
ensuring that the methods used are effectively and efficiently carried out all
the time, may not always be possible. It should however not discourage
employees from following these procedures devoutly. Only by making them
an integral part of the system can it be ensured that such an event does not
occur.
36. 8 . CONCLUSION
Nothing can be achieved without handwork and dedication. The duration spent
in DMAPL helped a lot in personal understanding of the industry. The
garment industry is the crucial industry and the problem statements found for
the improvement scope in industry is difficult to achieve. Due to its labor
intensive nature, the implementation results fluctuate as the success rate at last
depends on the operator’s dedication and the interest to use the new idea or
methodology to improve, as human nature is against the change in any field.
The whole 3 month was utilized to create the healthy relationship with the
work force and making them understand that anything new implemented in the
process or the material flow is for the betterment. And in order to achieve the
satisfying results theirs pilot run should be successful enough.
115
37.
38.
39.
40.
41.
42.
43.
44.
45.ANNEXURES
46.
47.
48.
49.
50.
51.
52.
116
53.
54.ANNEXURE 1
55.
56.
57.
58.
59.
60.
61.
117
62.ANNEXURE 2
63.
SPREADING DEPARTMENT
Style # 2 PL1883A Fabric Width 33.5" Solid
Fabric Detail Woven lining
Fabric Woven Fibre Content polyester Nap - either way
Machine Spreading
Manual Spreading No Yes Splicing ? No
?
Spreading M/c Type - Gerber Make - German Model SY-101 TT
Fabric Package Type -
Spreading Mode - F2F Lay Length - 237.2" (5.93m) Roll
Roll/Meter fold
No.of Weights Use of papers between layers -
No.of Clamp Used - Use of pins - Yes- Bottom and Top
NA Used - NA NA Yes/No
Table Height 35" Table Width 65.25" Table Length - 240" Table top type Metal
MarkerType Paper / Fabric /
Lay No. 2 Lay Height 1" No. of Fab Layers 46 CAD
CAD / On line
Time Duration in min. 20 min 20 min 20 min 20 mins
No. of Layers 12 12 12 10
Total fabric handled* (metres) 272.78
Spreading operators 1 1 1 1
* (No. of layers x Lay length)+ End bits
Name Age Sex Education Height Rating How long working in the deptt. Salaried/Hourly wage
Gayathri 20 F Salaried
64.
65.
118
ANNEXURE 3
CUTTING DEPARTMENT
Malbin Solid/YarnDyed/Pr
Fabric Width - 60.8" Solid
Style 2740A int
Navy Blue
Fabric Woven Fibre Content - Wool Blend Fabric Detail
Woven Fabric
No. of patterns
F2F 40 Marker way -
per garment
Marker Mode
Type of cutting
machine: Straight CAM
Table Length
36" LENGTH- 5.18 Metres; WIDTH- 72"
Table Height & Width
Working
Condition (Light, GOOD
fan etc.)
Height of
Fans per
0.25 0 light from 5 metre
Sq.mt.
Lights per Sq.mt. cutting table
MarkerType
No. of Fab
4 Lay Height 0.5" 80 Paper / Fabric / CAD
Layers
CAD / On line
Lay No.
Time Duration in
30 min. 30 min. 30 min. 30 min. 30 min. 30 min.
min.
No. of Patterns
40 40 36 40 40
cut
Linear Length*
cut
No. of Notches 72 72 68 72 72
Cutting Master/s 2 2 2 2 2
How long
Age Sex Education Height Rating working in the Salaried/Hourly wage
Name deptt.
Kempa 32 Male Good salaried
Ravi 28 Male Good salaried
66.
67.
119
68.ANNEXURE 4
69.
Element Breakdown
OPERATION : ARMHOLE LINING CLOSE
Sheet No. 1
Style PL -4030 Pulling the sleeve Pulling the sleeve
Pick up the pc & Checking & pushing Shifting to next Checking & pushing
Fabric WOOLEN to align the sleeve Stitching to align the sleeve Stitching Dispose
place it on the bed the sleeve back sleeve the sleeve back
Garment JKT lining with shell lining with shell
NOTES LINE T R T R T R T R T R T R T R T R T R
1 3.24 15.8 23.91 2.15 2.78 16.72 25.97 2.2 5.46
2 3.07 14.87 22.46 2.46 3.38 17.1 26.81 2.46 5.05
3 2.83 15.25 24.06 3.25 3.05 16.93 26.17 3.23 4.9
4 3.83 15.62 23.32 2.23 2.7 16.84 27.77 2.41 4.81
5 3.11 14.7 22.98 4.28 2.91 17.02 26.89 2.28 5.66
6 3.48 16.56 23.76 2.26 3.23 16.67 27.14 2.54 5.97
7 3.26 14.89 24.22 2.62 2.87 18.16 26.07 2.4 6.39
8 4.1 16.3 23.87 3.1 2.73 17.46 25.94 3.73 5.93
9 3.25 15.68 23.9 2.41 3.28 16.49 26.81 2.25 4.95
10 2.8 15.51 24.72 2.27 3.12 16.67 25.75 3.15 5.1
SUMMARY
TOTAL 'T' 32.97 155.18 237.2 27.03 30.05 170.06 265.32 26.65 54.22
AVG T 3.297 15.518 23.72 2.703 3.005 17.006 26.532 2.665 5.422
RATING 60% 60% 60% 60% 60% 60% 60% 60% 60%
Normal T 1.98 9.31 14.23 1.62 1.80 10.20 15.92 1.60 3.25
PF 15% 15% 15% 15% 15% 15% 15% 15% 15%
Standard T 2.27 10.71 16.37 1.87 2.07 11.73 18.31 1.84 3.74
M/c Delay* 9% 9% 9% 9% 9% 9% 9% 9% 9%
S.A.M. 2.45 11.55 17.65 2.01 2.24 12.65 19.74 1.98 4.03
70.
Element Breakdown
OPERATION : BODY BASTING
Sheet No. 2
Style PL:4030
Fabric WOOLEN BLEND Picking Aligning Stitching Picking Aligning Stitching Dispose
Garment JKT
NOTES LINE T R T R T R T R T R T R T R
1 4.25 3.75 30.57 5.14 4.78 30.5 4.5
2 4.23 3.78 30.45 5.21 4.79 29.98 4.6
3 4.29 3.89 31.56 5.13 4.56 29.87 4.1
4 4.28 3.79 31.25 5.15 4.65 29.96 4.3
5 4.65 3.88 30.21 5.23 4.78 30.01 4.5
6 4.56 3.56 30.33 5.45 4.98 31.2 4.99
7 4.45 3.98 30.42 4.98 4.67 30.32 4.87
8 4.32 4.01 30.42 5.01 4.87 30.12 4.56
9 4.29 3.89 30.12 5.24 4.95 30.21 4.85
10 4.54 3.76 30.32 5.14 4.96 30.23 4.56
SUMMARY
TOTAL 'T' 43.86 38.29 305.65 51.68 47.99 302.4 45.83
AVG T 4.386 3.829 30.565 5.168 4.799 30.24 4.583
RATING 60% 60% 60% 60% 60% 60% 60%
Normal T 2.63 2.30 18.34 3.10 2.88 18.14 2.75
PF 15% 15% 15% 15% 15% 15% 15%
Standard T 3.03 2.64 21.09 3.57 3.31 20.87 3.16
M/c Delay* 9% 9% 9% 9% 9% 9% 9%
S.A.M. 3.26 2.85 22.74 3.84 3.57 22.50 3.41
71.
120
ANNEXURE 5
72.
73.
121
74.ANNEXURE 6
JOB EVALUATION FOR PACKER
Com pensable Factors Weightage Total points 100% 75% 50% 25% SCORE
Skill
Multi skilled w ith
skilled w ithout
experience and Multi skilled w ith
qualif ication and
job know ledge 6 10 qualif ication, mentor all qualif ication, mentor others skilled w ith experience 5
experience, requires
other, upto date to some extent
mentoring
know ledge
Written and oral,technical
terminology, logical Both w ritten and Oral but uses oral communication Little or no inf ormation
ability to communicate 4 10 development of little f ace to f ace to describe simple routine f low , apart f rom opersonal 2
arguments, clariry of communication w ith others w orks recording daily activities
experssion
executes w hat has been
collect data f or record
analysis reports by others Format and generate thought but does not use
analytical ability 4 10
and give solution reports
keeping and implement
self discrestiojn or
2
analysed plans
anlaytical
Effort
hard physical w ork, Hard w ork, Rest and
less Physical w ork, little
Physical conditions and f atigue f actor high, interval allow ed, no very little physical w ork,
w ork
7 10
hazardous or extreme exposure to hazardous or
f atigue, Comf otable
luxuries w ork station
5.25
w orkstaion,
condition exposure extreme conditions
Mental w ork but not Mix of physical and mental
Hevy mental w ork,
monotonus, not w ork, Executes Little mental w ork, just
mental requirements 6 10 monotonus,
answ erable, less criticle instructions physically execute instruction given
4
responsibilities are criticle
responsibility w ith some discreation
Responsibility
Small impact as heavy
impact on the organisation 2 10 Crucial and un-doable Crucial but renew able Non crucial but important
ref inement higher of f icers
1
Supervising junior Supervisies w orkers and
Supervises senior
supervisory authority 2 10 managers, requires some operators,requires some Requires supervision 1
managers
supervision himself supervision himself
Final decisions, others
take decisions w hich are
f ollow the decision,
crucial by only w ith take decisions w hich are take smaller decisions that
decision making 2 10 decisions have crusial 1
consulation of other not crusial too w ith consultaion
impact, no consultaion
of f icaials
necessary
Individually Accountable
Accountability of a
accountability 2 10 f or overall perf ormance of Accountability of a team Individual accountability 1
department or a group
company
know ledge
Solve problems, Gives
logical solution w ith
Solve problems f or a Solve problems f or a team, Individual problem solving
implementation f or entire
problem solving skills 2 10
organisation , high
department, High lesser Qualif ied and and execution of solutions 1.5
qualif ication experience laid dow n by others
qualif ication and
experience
Plans f or the entire
Planning and organising 2 10
organization (Visionary)
plans f or a department plans f or a team individual planning 1.5
TOTAL 25.25
Com pensable Factors Weightage Total points 100% 75% 50% 25% SCORE
Skill
Multi skilled w ith
experience and skilled w ithout
qualification, mentor all Multi skilled w ith qualification and
other, upto date qualification, mentor others experience, requires
job know ledge 10 100 know ledge to some extent skilled w ith experience mentoring 5
Written and oral,technical
terminology, logical
development of Both w ritten and Oral but uses oral communication Little or no information
arguments, clariry of little face to face to describe simple routine flow , apart from opersonal
ability to communicate 6 100 experssion communication w ith others w orks recording daily activities 3
executes w hat has been
collect data for record thought but does not use
analysis reports by others Format and generate keeping and implement self discrestiojn or
analytical ability 6 100 and give solution reports analysed plans anlaytical 1.5
Effort
hard physical w ork, Hard w ork, Rest and
fatigue factor high, interval allow ed, no less Physical w ork, little
Physical conditions and hazardous or extreme exposure to hazardous or fatigue, Comfotable very little physical w ork,
w ork 6 100 condition exposure extreme conditions w orkstaion, luxuries w ork station 4.5
Mental w ork but not Mix of physical and mental
Hevy mental w ork, monotonus, not w ork, Executes Little mental w ork, just
monotonus, answ erable, less criticle instructions physically execute instruction given
mental requirements 8 100 responsibilities are criticle responsibility w ith some discreation 2
Responsibility
Small impact as heavy
Non crucial but important
impact on the organisation 6 100 Crucial and un-doable Crucial but renew able refinement higher officers 3
Supervising junior Supervisies w orkers and
Supervises senior managers, requires some operators,requires some
supervisory authority 3 100 managers supervision himself supervision himself Requires supervision 1.5
Final decisions, others
follow the decision, take decisions w hich are
decisions have crusial crucial by only w ith
impact, no consultaion consulation of other take decisions w hich are take smaller decisions that
decision making 3 100 necessary officaials not crusial too w ith consultaion 0.75
Individually Accountable
for overall performance of Accountability of a
accountability 3 100 company department or a group Accountability of a team Individual accountability 0.75
know ledge
Solve problems, Gives
logical solution w ith
implementation for entire
organisation , high Solve problems for a Solve problems for a team, Individual problem solving
qualification and department, High lesser Qualified and and execution of solutions
problem solving skills 5 100 experience qualification experience laid dow n by others 1.25
Plans for the entire
Planning and organising 5 100 organization (Visionary) plans for a department plans for a team individual planning 1.25
TOTAL 24.5
122
ANNEXURE 7
Section a
QUESTIONNARE
SEGMENT – I
123
ii.Are traditional skills required to work on CAD?
Please Comment: Training is given to employees before they join for work.
iii.Are experienced pattern makers (who manually developed patterns and markers) easily
accepting the extensive use of CAD / CAM?
Yes
No
Sometimes
iv.Is the combination of an individual readily available who is an expert in CAD / CAM
and pattern making?
Yes, always
No, sometimes
Rarely
SEGMENT- IV (TRAINING)
i.Was any training imparted to the operator when the new soft-ware was installed?
Yes
No
If yes, then for how many days?
- Less than 7 days
- 7-15 days
- More than 15 days
ii.Are you satisfied with the training given?
Yes
No
If no, please specify the reason?
- Training should be of longer duration
- Language problem
- Any other __________________________
iii.Do you think that training is only required when a new software is installed or do you
recommend an in-house training otherwise as-well?
Training every year or 6-months
Only when a software is installed
iv.Do you think that the person working on CAD / CAM should be well versed in Pattern
and Marker development or should he have fair knowledge about textile and styling as-
well?
Please Comment:
124
SEGMENT – V (PEOPLE INVOLVED)
i.How many people are working in the pattern development and marker making
department?
Please specify, (125ncorre.) 5
ii.Has the number changed (increased / decreased) with the usage of CAD?
Reduced
Are the same
Can’t say
iii.What is the age of person working on CAD?
20-25 yrs.
25-35 yrs
Above 35 yrs.
iv.Does he have any prior work experience on CAD?
Yes
No
If yes, then how many years?
- 1 yr.
- 1-2 yrs
More than 2 yrs.
Section b
The following factors have been identified to have an influence on adoption of CAD /
CAM.
125
Factors influencing Strongly Moderatel Indifferent Moderatel Strongly Can’t
adoption of IT positive y positive y negative negative say
High Price
Reduces dependence
on people
Failed installation in
other organization
Collaborative working
between various
employees, supplier
and buyer is easier
Ability of supplier to
train the users in our
organization
Saves fabric
Reduces throughput
time for product
assemble
Requirement of
constant training
Ready availability of
literate professionals
Constant up gradation
of system required
126
Section c
Note: Kindly tick mark in the relevant column and pen down any remark / comment related
to the point in the last column
1. Digitization
2. On screen pattern
construction
3. Notches option
4. Dart manipulation
5. Grading tools
6. Size
correspondence
7. Specification
sheet development
8. Piece assembly
9. Variant tools
11. Plotting
13. Measurement
capabilities
127
functions- Darts,
pleats, trace, cut,
combine, shrink,
stretch, flip,
Rotate pattern.
128
ANNEXURE 8
SOFTWARE EVALUATION
Section One - Overall Software Requirements Name of the software- ERP
Meeting your general or overall software Total (your
Ref. Your W/F Score
compatibility requirements W/F * Score )
1.1 Operating System (Widnows NT, XP, etc.)(XP) 4 3 12
1.2 Database format (SQL, Oracle,etc.) (SQL) 4 3 12
1.3 Data import or export requirements 3 3 9
1.4 The look and feel of the application 2 2 4
1.5 Filtering and searching friendliness 3 3 9
1.6 Look ups 3 2 6
1.7 User configurabilty of look ups and lists 3 2 6
1.8 Users configurabilty of tags and labels 4 3 12
1.9 Handling of links to ancillary information 3 2 6
1.10 Required number of concurrent users 4 3 12
1.11 Archiving requirements 2 2 4
1.12 Barcoding, PDAs and remote devices 1 0 0
1.13 Single or multi-site functionality 3 2 6
1.14 Graphical, hierarchical data structure 3 2 6
1.15 Regulatory compliance support 3 2 6
1.16 Ease of implementation 4 3 12
1.17 Additional database software required 3 3 9
1.18 System maintenance 4 3 12
1.19 Paperless systems 4 3 12
1.20 Access to data from various areas 4 3 12
1.21 Equipment history 3 2 6
1.22 Simple login process 4 4 16
1.23 Speed 4 3 12
1.24 Customisable screens 0 0 0
1.25 Resourcing 3 2 6
1.26 Alternative Languages 3 2 6
1.27 Overall ease of use 4 3 12
1.28 Your Data
1.29 Your Data
1.30 Your Data 85 225
Total A B C
Effeciency = C/(A*4)*100
Efficiency 66.17647059
129
Section 2 – Application Support for various functions in the Name of the software- ERP Stage
Unit 6.5.1
Application Support for various functions in the Total (your W/F * Score
Ref. Your W/F Score
Unit )
2.1 Marketing ( Pre Sales)
Enquiry 4 3 12
Quotation 4 3 12
Folow up – buyer ratings 4 3 12
Communication – summary /status 4 2 8
2.2 Sales Order Processing ( post sales) 0
Bulk, Sample, Job orders 4 3 12
Order Tracking 4 3 12
Order Amendments/cancellation 4 3 12
Technical review, 4 3 12
Order Grouping, Shipment status 4 3 12
2.3 Planning and Scheduling (T & A) 0
Planning document 4 3 12
Process Sequence 4 3 12
Allocation to Jobs ( skill matrix ) 4 3 12
BOM status 4 4 16
Fabric/Yarn Consumption 4 3 12
Order budget/Actuals 4 3 12
2.4 Purchase and Stores 0
Purchase Order handling and status 4 3 12
Goods received details 4 3 12
Invoice details 4 3 12
Quality inspection details 4 3 12
Supplier rating 4 3 12
Debit and credit note 4 3 12
2.41 Raw Material Store 0
Opening stock updates 4 3 12
Requisitions in and out 4 3 12
Stock transfer 4 3 12
Isuues to process and production 4 2 8
2.5 Process Management 0
Process orders, issues, receipts, returns 4 3 12
Quality and inspection 4 3 12
Debit and credit note 4 3 12
2.6 Production and Floor management 0
Material Inward 4 3 12
Fabric Consumption plan/details 4 3 12
Bundling 4 1 4
Cut garments Stock 4 2 8
Components Tracking 4 2 8
Damaged Fabric Stock 4 2 8
2.61 Printing/Embroidery/Other Stages 0
2.62 Sewing 0
Capacity Planning 4 3 12
Line allocation 4 2 8
Line issues/Bundles 4 2 8
130
Line production 4 3 12
Rejections 4 2 8
Issues/receipts statements 4 3 12
Capacity vs production details 4 2 8
Daily Production Summary 4 4 16
2.63 Finishing / WIP finishing 0
2.64 Checking / Ironing / Packing / Despatch 0
Piece issues / receipts 4 3 12
Packing entry 4 3 12
Despatch details 4 3 12
Returns and damages details 4 3 12
2.65 Quality and inspection 0
Size set 4 4 16
Accessory inspection 4 4 16
2.7 Shipment and Documents 0
Shipping Bill /Invoice 4 3 12
Payment Pending 4 3 12
Buyer Payment/Discounts 4 3 12
Letter of credit etc 4 0
2.8 Asset Management 0
Asset Inward Details 4 3 12
Asset allocation / Transfer 4 2 8
Service Records 4 3 12
Caliberation 4 2 8
Disposal / depreciation 4 2 8
Warranty / AMC 4 3 12
2.90 Personal Management 0
Employee records 4 4 16
Allowance/deduction 4 3 12
Payslip 4 3 12
Loans and advances etc 4 3 12
2.91 Financial Management (tally 7.2) 0
Ledger 4 3 12
Balance sheet 4 3 12
Vouchers 4 3 12
Trail balance 4 3 12
Sales / Purchase 4 3 12
2.92 Other specific options not metioned above ( if any)
2.93 Other specific options not metioned above ( if any)
268 756
Section 2 Total A B C
131
Section3 - Administration and Security Name of the software- ERP Stage 6.5.1
Administration and
Ref. Your W/F Score Total (your W/F * Score )
security Assessments
3.1 Ease of use 4 3 12
3.2 Tabular selection 4 4 16
3.3 Password 4 4 16
3.4 Individuals and group settings 4 4 16
3.5 Audit trial 4 3 12
3.6 Customisation 3 2 6
3.7 Your Data 0
3.8 Your Data 0
3.9 Your Data 0
3.1 Your Data A B C
Section 3 Total 23 B 78
132
Section 5 – Web Based
Name of the software- ERP Stage 6.5.1
Software
Ref. Web based Assessments Your W/F Score Total (your W/F * Score )
Effeciency =
C/(A*4)*100 79.46428571
Final Scores
Section Description Effeciencies
1 Overall Software Requirements 66.18%
2 Application Support for various functions in the Unit 70.52%
3 Administration and Security 84.78%
4 Reports 93.75%
5 Web Based Software 79.46%
6 Vendor and Vendor Support 61.54%
7 Software and Associated Costs 64.29%
8 FINAL EFFECIENCY 74.36%
133
20. REFERENCES
1. Departmental Study, Primary data
Dress Master Apparel Pvt. Ltd.
2. Review of Literature (2017), Available at:
i. https://www.leanproduction.com › smed
ii. https://www.leanaccountants.com
iii. https://www.sixsigmadaily.com
iv. A Revolution in Manufacturing, The SMED system, by Shigeo Shingo
134