HSE Administration 2019

HSE WEEKLY
REPORT
2019

CCPP JAWA 1 1760 MW


CILAMAYA
19 - 25 Sept 2019

1
HSE Administration 2019

I. HSE Weekly Report

Project Total Man Hours 794.738


Total Safe Weekly Man Hours 63.220
Days free LTI 169
Number Days after LTI 0

II. Safety Observation


No Finding / Observation Reported by Date PIC Status
1 DWI (HSE) 19/09 TOMMY
(CM)

AFTER INSTALL HOSE TI


NO REBAR CAP TO PROTECT REBAR PROTECT REBAR
AT CTEB AREA
2
HSE Administration 2019

HERMAWAN 19/09 AHMAD


(HSE) SAUQI
(CM)
2

NO RAILING AND ACCESS AT PB2


AREA
AFTER INSTALL ACCESS WAY
FOR WORKER
3 HERMAWAN 19/09 TOMMY
(HSE) (CM)

NO COVER PILE AR CT1 AREA AFTER INSTALL COVER PILE

3
HSE Administration 2019

4 FANNY (HSE) 19/09 TOMMY


(CM)

FOUND REBAR NOT IN PLACE AT


AFTER REMOVED SCRAB
CT2 AREA
MARERIAL
5 YOGI (HSE) 20/09 DANY
SUMBAR
A (SM)

AFTER PUT SAFETY SIGN


NO SAFETY SIGN AT WWTP AREA

4
HSE Administration 2019

DWI (HSE) 20/09 TOMMY


6 (CM)

BAD HOUSEKEEPING & FPUND AFTER HOUSEKEEPING AND


CABLE NOT PUT ON HANGER AT PUT CABLE ON HANGER
CT2 AREA
7 YOGI (HSE) 20/09 DANY
SUMBAR
A (SM)

BAD HOUSEKEEPING AT WWTP AFTER CLEANING


AREA

5
HSE Administration 2019

8 RIZAL (HSE) 21/09 TOMMY


(CM)

NO REBAR CAP AT WATER TANK


AREA AFTER INSTALL REBAR CAP
9 YOGI (HSE) 21/09 TOMMY
(CM)

CABLE PUT NOT IN PLACE AT CTEB AFTER PUT CABLE ON


AREA HANGER
6
HSE Administration 2019

RAKA (HSE) 21/09 RIO P


(SM)

10

AFTER BARICADE THE


MATERIAL
MATERIAL NOT BARICADE AT CWP
AREA
11 RAKA (HSE) 22/09 RIO. P
(SM)

NEED DIPTRAY ON BENSIN AT CWP AFTER PROVIDE DIPTRAY


AREA

7
HSE Administration 2019

12 RIYANTO 22/09 OCHATAV


(HSE) IANUS
(SM)

MATERIAL CLAMP SHOULD BE AFTER REMOVED THE CLAMP


REMOVED AT PB1 AREA MATERIAL
13 DZIKRI (HSE) 22/09 TOMMY
(CM)

AFTER INSTALL SOFT


BARICADE ON VERTICAL
NO REBAR CAP TO PROTECT REBAR
VERTICAL REBAR AT CT1 AREA
8
HSE Administration 2019

14 DZIKRI (HSE) 22/09 PUNGKAS


(CM)

NEED BARICADE ON HEAVY


AFTER INSTALL BARICADE
EQUIPMENT AT CTEB AREA
15 BUDI (HSE) 23/09 TOMMY
(CM)

BAD HOUSEKEEPING AT WWTP


AFTER CLEANING
AREA

9
HSE Administration 2019

16 BUDI (HSE) 23/09 TOMMY


(CM)

MATERIAL NOT BARICADE AT AFTER BARICADE THE


WWTP AREA MATERIAL

17 RAKA (HSE) 23/09 RIO.P


(SM)

BAD ARRANGEMENT CABLE AT AFTER MAINTANANCE THE


CWP AREA CABLE BY ELECTRIC TEAM

10
HSE Administration 2019

18 BUDI (HSE) 23/09 TOMMY


(CM)

NO ACCESS WAY AT WWTP AREA AFTER INSTALL ACCESS WAY


19 MADE (HSE) 24/09 TOMMY
(CM)

NO BARICADE AT SWTP AREA AFTER INSTALL BARICADE


RAKA (HSE) 24/09 RIO.P
20 (SM)

AFTER PUT ON DIPTRAY


NOT PROVIDE DIPTRAY AT CWP
AREA
11
HSE Administration 2019

21 DZIKRI (HSE) 25/09 PUNGKAS


(CM)

AFTER PUT ON HANGER


NO CABLE HANGER AT CTEB AREA CABLE
22 DZIKRI (HSE) 25/09 PUNGKAS
(CM)

BAD ARRANGEMENT RAILING AT AFTER MAINTANANCE


CTWB AREA RAILING

12
HSE Administration 2019

III. Safety Activities


Description

PPE INSPECTION AT MAIN GATE EVERY DAY


Check PTW before activity

13
HSE Administration 2019

Cek Daily checklist heavy equipment

14
HSE Administration 2019

MORNING TOOL BOX MEETING


TBM LEADER TRAINING
Prepared by Approved by

Alamsyah Patrick Kirby


HSE Manager Project Manager
Date : Date :