100%(1)Il 100% ha trovato utile questo documento (1 voto)
591 visualizzazioni2 pagine
This document contains a list of node numbers and descriptions related to the master state control for an FLG vehicle bus monitor. It describes the sequence of nodes that would be activated in response to different types of disturbances, such as a disturbance without turning off the main circuit breaker or a disturbance that requires turning off the main circuit breaker. The last section outlines the node sequence that would be followed depending on the current node and type of disturbance.
This document contains a list of node numbers and descriptions related to the master state control for an FLG vehicle bus monitor. It describes the sequence of nodes that would be activated in response to different types of disturbances, such as a disturbance without turning off the main circuit breaker or a disturbance that requires turning off the main circuit breaker. The last section outlines the node sequence that would be followed depending on the current node and type of disturbance.
This document contains a list of node numbers and descriptions related to the master state control for an FLG vehicle bus monitor. It describes the sequence of nodes that would be activated in response to different types of disturbances, such as a disturbance without turning off the main circuit breaker or a disturbance that requires turning off the main circuit breaker. The last section outlines the node sequence that would be followed depending on the current node and type of disturbance.
Nodes For The Master State Control (MSC): State description for FLG
Node Nr. Description
1 Start node; first node after MCE activation 2 Vehicle Bus Monitor; the communication to all processors is monitored 10 Release process to processor SLG1 & SLG2 12 MCE starts 'Switch off timer' 13 MCE switches off 70 Disturbance with or without VCB off (Priority 1 fault) 71 FLG ready for acknowledge; Protective action executed 110 Test periphery SLG1 120 Test periphery SLG2 310 Release Test 1 ALG1 320 Release Test 1 ALG2 350 Release Test 2 ALG1 351 Release Test 2 ALG2 390 ALG ready 503 Loco ready for setup, cab not active 504 Cab active, Key switch in Pos."D" (Multiple operation: Cab on slave loco active) 550 Pantograph up enable 560 VCB enable 570 VCB closed 580 Gate Unit Bogie 1 enable 581 Gate Unit Bogie 2 enable 583 DC-Link precharging 584 Release converter contactor bogie 1 585 Release converter contactor bogie 2 590 DC-Link ready 592 Configuration Harmonic Filter (true only if filter is on) 594 NSC & NSC pulsing (true only ASC pulsing, if theremotors Traction is no traction interlock magnetised, B1/B2) TE/BE effort enable (true only if 596 there is no traction interlock B1/B2) 600 VCB off , Panto Down 601 Shut Down Loco , DC link deenergising 605 DC - Link voltage too low. prepare precharging 612 MCE starts 'switch off timer' 613 MCE switches off 700 Disturbance without VCB off 701 Loco ready again 710 Disturbance with VCB off 715 Loco Ready for VCB on 716 Protective shut-down activated through SLG1/2
MSC Disturbances / Nodes Next node
present Disturbance sequence 002-390 disturbance without VCB off 070 / 071 002-390 disturbance with VCB off 070 / 071 503-596 503-596, disturbance without VCB off 700 710 // 701 715 700-701 disturbance disturbance with with VCB VCB off off only if SLG /710 716/ 715 600-612 commands protective turn off / 716