Check Valve
N.B: Makeup water storage tank is use to maintain the condenser level with the help of Two make pump(1 Working & 1 Standby) LCA Main Condensate piping System
During the makeup condeser level,flow measurement is done with the help of flow meter. AA Valves,Damper
Condenser level is control with help of Level control valve.
Technical data of Ext. Line -4
From Ext. Line 4 DEC CEN Pr.In Mpa Flow in t/h Technical data of Ext -8 to LPH-8
Drg No:-K210-01 Condensate Water Flow 339.5 0.878 87.1 DEC CEN Pr.In Mpa Flow in t/h LPT A
M-26 F Temp.=172.1 °C 75.5 0.039 56.66
T M
LT L
DEAERATOR T 10LCA50AA001 Ext. Line-8
Chemical Pr.=0.834MPa
10LCA70AA001 M Sampling M-26 Deaerator Level LP Heater No. 7A
Transmitter Technical data of LPH-8 LP Heater No.8A
M
M-26 DEC CEN Pr.In Mpa Flow in t/h
74.3 0.037 56.66 Condenser
10LCA71AA001 Technical data of Condensor
Feed Water Storage Tank DEC CEN Pr.In Mpa Flow in t/h
46.1 0.1013 1128.58 Hotwell
10LCA61AA001
M M
10LCA46AA001
Condensate suction
M motorised Valves
Technical data of Ext. Line -5 to LPH-5 10LCA41AA001 10LCA10AA001
DEC CEN Pr.In Mpa Flow in t/h
227.2 0.337 47.27 10LCA40AA002 LCV CEP-A
M-26
10LCA60AA002 M
Technical data of Ext. Line -6 to LPH-6 TTPS At Teughat Thermal Plant Having 2X210 MW (BHEL make
DEC CEN Pr.In Mpa Flow in t/h Where as at Mahan Super Thermal Plant Having 2X600
167 0.19 46.37 to extract non-condensate gas from condensor to maintain
M
Technical data of LPH-6 LP Heater No. 6
DEC CEN Pr.In Mpa Flow in t/h
117 0.18 56.66
10LCA50AA002 M From Auxi. Steam Header
N.B:- Remove condensate water from the hot well, driven by CEP (condensate pump,two operating and one
standby),through Condensate polishing unit
which is used to maintain the condensate water qual
finaly it send to the deaerator through LPH,where condensate water is heated by turbine extracting system,
Dearator and minimum recirculation control valves are working in same subgroup for fine control of
Dearator as well as Hotwell level
Minimum recirculation control valve is use to maintain minimum flow to hotwell
Dearator level control valve is used to maintain dearator level Gland Sealing
LPH Steam Condensor
Whenever need to maintain dearator as well as hotwaell level both valve are working as tandem compound(spit)
With the help of these two control valve also maintain the CEP discharge pressure.
Dearator pressure control valve is used to maintain dearator pressure .
Technical data of Ext -7 to LPH-7
DEC CEN Pr.In Mpa Flow in t/h
LPT B 105.6 0.099 56.36
Ext. Line-7
Hotwell
10LCA10AA021
M
M M
CA10AA001 10LCA10AA011
CEP-B
SCS10LCA43AA001
ing 2X210 MW (BHEL make Turbine). There was Ejactor system between Gland Sealing Steam Condensor and LP Heaters As shown in Fig.
ermal Plant Having 2X600 MW (CHAINA make Turbine). Three Water ringed vacuum pumps are used
from condensor to maintain required vaccum. LPT LPH
CONDENSOR
Hot Well
From Auxi. Steam Header Main Ejectot A Main Ejectot B Main Ejectot C Start Ejectot
CEP
M M M M M M
CEP
Gland Sealing
Steam Condensor
From 4Th
Extraction line
Drawing No:-K0211-03 or Auxi. Steam
N.B:-The supplying steam for BFP turbine comes from 4th extraction
steam line during unit normal operation, and steam source from P
aux. steam system during low load T DEC CEN Pr.In Mpa Flow in t/h
339.5 0.834 92.96
Technical Specification taken from HMBD
LP MSV of o-make up
TE
BFP-T
DEC CEN Pr.In Mpa Flow in t/h T
0.0111 92.96 SCS MV E
10LBR30AA001
To Condenser M DEC CEN Pr.In Mpa Flow in t/h
171.6 1875.12
N.B: There are two 50% capability turbine-driven BFP and one 50% capability
To Drain Flash Vessel
M motor-driven BFP. Each of them has booster pump. During normal
operation,two turbine-driven BFP (TDBFP) are working and one motor-driven
SCS MV BFP(MDBFP) is standby.The MDBFP with 50% capacity is used for unit start-up
10LBR30AA401 and for standby.
TDBFP will control, feed water flow by regulating the rotation speed
of BFP turbine, and MDBFP will control by hydraulic coupling.
TTPS At Teughat Thermal Plant Having 2X210 MW (BHEL make Turbine). There was no
BFP-T.only three motor-driven BFP , these are controled by hydraulic coupling.
MCS
PCV M-25 M
From EXT-4
M-26
Temp.=172.1 °C
LT DEAERAATOR LT M-26
Deaerator Level
Pr.=0.834Ma Transmitter
FCV M-37A
10LAB11AA211
Check Valve
DEC CEN Pr.In Mpa Flow in t/h 10LAB 11 AA 002
DPSwitch M 2FT 171.6 1875.12 M
P T
M 10LAB11CP001 T I Water Pump M
M-37 A Water Pump
10LAB 11 AA001 Strainer Booster Pump Flow Nozzle Strainer T- BFP A Check Valve
10LAB 11 AT001 is used to provide NPSH 10LAB 11 CF501 10LAB 11 AT002
to BFT suction
BFP-B 10LAJ 11 AP001 TO K0211-02D Technical data of Ext Line-2 toHPH-2
DEC CEN Pr.In Mpa Flow in t/h
325.8 3.82 123.14
N.B:- Boiler feed water system shall supply feed water from deaerator to the boiler
BFP-C economizer header inlet with required flow and flow rate under all operating
conditions, and feed water will be heated by turbine extracting steam through Technical data of Ext Line-3 toHPH-3 From EXT-2
HP heaters DEC CEN Pr.In Mpa Flow in t/h
444.7 1.85 80.3
From EXT-3
N.B:M-25 Dearator pressure control valve is used to maintain dearator pressure .
M37-A= BFP recirculation is used to maintain the minimum flow though BFP pump
M
SCS 10LAB 30AA 001
HPH-3 HPH-2 HPH-1
Drawing NO:-K0211-01 DEC CEN Technical data of HPH-3 Technical data of HPH-2
Boiler Feed water system 177 DEC CEN Pr.In Mpa DEC CEN Pr.In Mpa
& 206 1.793 245.8 3.706
Drawing NO:-K0211-02 Three high-pressure heaters shall be applied with 100%BMCR capacity
Water Piping system
RH Desuper Heater
K0211-02A
10LAB 11 AA 002
M K0206-03A
TO HP BYPASS
SYSTEM
K0201-02A
To Supper Heater
Desupper Heater
From EXT-1
From EXT-3
HPH-3 HPH-2
From EXT-2
K0201-02 A
M
HPH-1 To Feed control Station
SCS 10LAB 30AA 002
K0211-01 D
Feed Water
Flow
Control M
10LAB 41 AA 101 11
10LAB 41 AA 001 10 LAE02AA001 10LAE03AA001
SCS 10 LAE01AA001
M M
10 LAE03CF101
10LAB 41 AA 002 10 LAE01CF101 F F
FT
T 10 LAE01CF501 M11 F Flow Nozzle T
0 To 100% CV M11 Flow Nozzle Flow Nozzle T
10 LAE02CF501 M11 10 LAE02CF101
M TE TE
HPH Flow Nozzle
10LAB 41 CF 501
SCS 10 LAB 40 AA 001 Check Valve S12
N.B: TTPS At Teughat Thermal Power Plant Having 2X210 MW (BHEL make Turbine). There was two control valves (0 to 30% and 30 to 100%)in
Feed control systen. To control drum level.During light up & at low load ," 0 to 30%" control valve is taken in action ,
i.e Single element Control(only drum level are measured with drum pressure compansation and applied to the PID controller with
set point)
During more than 30% of full load 30 to 100 % control valve is taken in action , I,e three element control ( 3- elements are Drum level ,
Main steam flow & Feed water Flow) which is applied in secondary PID controller to maintain the drum level with out srinking/swelling of
drum water surface.
Where as at Mahan Super ThermalPower Plant Having 2X600 MW (CHAINA make Turbine). Only 0 to 100% control valve is used
in feed control station, to main tain drum level.
T M08
E
TE
SH Back Screen O/l Header Tank T M08
E
TE
M-08=Boiler
Secondary Stage
10LAE03AA002 Main Steam
Temp. Control
M M
T M08 10LAE04AA002
E
TCV TCV
End Stage SH O/l Header Tank
M8 TE T M08
E 10LAE04AA101
M08
TE
T M08
M08 E 10LAE04AA001
TE
10 LAB10AA102
M 10 LAB10AA104
M
10 LAB10AA101 M M
F
Flow Nozzle T
10 LAE03CF501 10 LAB10AA103 10 LAE04CF101 10 LAE04CF501
TO Turbine I/L
M M
FT
2060 for 600 MW
1 To 100% CV
M M
HPH
Flow Nozzle
ECONOMISER
0 To 30% CV
M M M
Flow Nozzle
for 210 MW
7 7 7 7
8
8 8 8
Reheater :-
Steam from the exhaust of the first stage turbine goes back to the boiler for
reheating and is returned to the second stage. Reheater coils in the flue gas path
does the reheating of the returned steam. The reheat steam is at a much lower
pressure than the super heated steam but the final reheater temperature is the
same as the superheated steam temperature. Reheating to high temperatures
improves the output and efficiency of the Power Plant. Final Reheater
temperatures are normally in the range of 560 to 600 °C. Reheat steam
pressures are normally around 45 bar
HPTurbine IP Turbine
M FT M
From Boiler Feed Pump
REHEAT
O/L Header
K201-03/C
To LP BY Pass
K206-03A
Technical data O/L Reheater
DEC CEN Pr.In Mpa Flow in t/h
538 3.438 1579.6
10LBB32AA401
10LBB32AA401
To Drain Flash Vessal
10LBB31AA401
SCS ECV
10LBC10AA201 M75 10LBC11Cp101
A HP
10LBC 10AA403 Exha 10LBC11CT601 MCS TCV
SCS DCV ust TE PT 10LCA32AA130 M77A HP
Pr. Exhaust Steam
MCS M75A DEH DEH M77A Device A Temp
K206-3 Contr
PCV Control
ol
10LBC20AA402
K210-1
To Drain Flash Vessal MCS M75A From Condensate System
To HP Bypass Valve PT TE K212-1
10 LBC 20CP101 10LBC20CT601
To Condensor
MCS TCV
K206-3 K209-2A 10LCA32AA130
MCS M75A M77A K210-1
K209-01
Reheat system is used to increase the efficiency of system
K207-01
From HPH-2
K0201-03
Reheter I/L Header
77A HP
xhaust Steam
evice A Temp
ontrol
S27 Turb Drain Sub Group
S27 SCS DCV
Drg No: K206-03 10LBA10AA00
Main Steam
LBA Main Steam Piping System
CP Pressure
M MAN
DCV Drain Valve
10MAN10AA151 MS SV
To Auxi. Steam Header From Feed Water System S27 SCS DCV
M
10LBA12AA01
Liquit pump
BSP pcv
BPS TT
Turbine is provided with two stage serial bypass devices. Bypass system capacity is 60% of BMCR.
HP/LP bypass system are used to maintain the flow though boiler during rolling of turbine or when turbine got tripped or its come at partial load.
M-01=Boiler,
Turbine
,Coordinate
control
Main steam
control valve
LP 1
Generator
Generator