Waste – Segregation

No Segregation Materials segregated in


containers

47
Waste –Containers
Containers

Small container provided for ALL Container large enough to store


construction waste. If full will not defined material
encourage segregation

48
Waste – Signage

Signage not clear and only in Signage in various languages


English with images

49
Site Walk Around – Clean Materials

Segregated concreted contaminated Clean Materials


with other materials e.g. timber

50
Site Audit – Envelope
• Envelope related Awareness
Questions are in Stage 1 and Stage 2
of the audit process
• Responses to all questions link to
minimum and improved energy
performance or building envelope
verification
• Team must demonstrate purchase of
materials with appropriate U-Value
• Contractor must demonstrate that
envelope elements have been installed
appropriately
• All gaps should be appropriate sealed Gap in Insulation

51
Envelope – Insulation

Incorrectly
y laid blocks / p
poor detailing
g Insulation full length
g of wall

52
Envelope – Gaps
All gaps
need to be
appropriately
sealed

53
Envelope – U
U-Values
Values

• Third-party test certificate


demonstrating thermal
properties of insulation
and other wall make-up
elements
Envelope – U
U-Values
Values
• Shop drawings highlighting envelope elements with different U-Values
Envelope – U
U-Values
Values
• Elemental U-Value
calculations
• PVRS U-Value calculator
Envelope – U
U-Values
Values
• Area weighted average U-Value calculations

U-Value = (A1 x U1 + A2 x U2 + An x Un) / (A1 + A2 + An)


Envelope – Insulation
Lessons Learned
• Where material intent has been supplied it is imperative that:
• The design team checks the contractors submission for compliance
• The contractor only purchases approved materials
• Any alternative offered must be approved
• Accuracy of material submittals against as installed

• Testing and Commissioing:


• Adequate time to be included
• Procedures to be approved and recorded by ICA
• Documentation of results to be accurate and approved
• UPC will spot inspect projects for accuracy

• Effective
Eff ti andd accurate
t as b
built
ilt information
i f ti is
i collated
ll t d and
d issued
i d
• Draft to be issued for comment six weeks prior to handover
• Final documentation to be issued before handover
• This to include an owners handover pack (where applicable)
• All of the above to be approved in writing by the design team

Failure to comply will add significant risk to villa handover/ acceptance

59