Firespot safety and security

OFFER WITH Client Name


system
Doc. No.
212
Project
BILL OF QUANTITY Location
Andhra Pradesh Rev. no.
1
HFC 227 ea Flooding
KAWIZ SERVICES PVT LTD System
System
Effective from:
Dec-18
Web:Kawizservices.in BOQ No. BOQ-FP-HFC 227ea-212 Prepared By Waseem R S
Email:- design.kspl@gmail.com Date of
05-12-2018 APP. By
release S. Waqar
Mob No:+91 8587892570
SITC
S.NO DESCRIPTION Make UNIT QTY Remarks
UNIT RATE AMOUNT
GAS SUPRESSION SYSTEM
140 Litre Seamless Cylinder CCOE Approved, complete with valve assembly and a
1 MX Nos. 1
pressure gauge with a safety burst disc and a safety cap.
80 Litre Seamless Cylinder CCOE Approved, complete with valve assembly and a pressure
2 MX Nos. 1
gauge with a safety burst disc and a safety cap.
3 HFC 227ea Agent WAYSMOS BY MX Kgs 118
4 Electric Cum Manual Actuator. MX Nos. 2
Discharge Nozzles are designed to provide the proper flow rate and distribution of FM-
5 MX Nos. 8
200 to total flood a hazard area : 180 deg. / 360 deg.
6 Manifold Discharge Pressure Switch MX Nos. 2
7 Flexible discharge Hose MX Nos. 2
8 M.S. Container strap FABRICATED BY MX Nos. 2 LOT 6,10,000.00
9 Gas Release Panel with battery RAVEL Nos. 2
10 Manual Release Switch RAVEL Nos. 2
11 Manual Abort Switch RAVEL Nos. 2
12 Warning Sign Board. FABRICATED Nos. 2
13 Conventional Smoke Detector RAVEL Nos. 10
14 Conventional Hooter with Flasher RAVEL Nos. 2
15 2 c x1.5 sq. mm FRLS Cable armoured/Flexible with conduit ISI Mtrs. 300
Pipe, & fittings complete with steel structure support like angle, channel, fastner, clamp
16 etc. including primer and painting. ISI Lots 2
Pipe (S) : M.S. Seamless To ASTM A-106, SCH. 40
TOTAL FOR GAS SUPRESSSION SYSTEM TOTAL= 6,10,000.00
IGST 18% 1,09,800.00
Amount for one site in words: INR-Seven lakh nineteen thousand eight hundred only Total for One Site 7,19,800.00
Amount for seven site in words: INR-Fifty lakh thirty eight thousand and six hundred only G.Total for Seven Site 50,38,600.00

TERMS AND CONDITION


1 We will submit our own gas flow calculation for RTG DCCC server Room and APSCLDHQ Server Room as per given dimension in design sheet.
2 Number of nozzle and detector may varied depending on our final design layout.
3 50% Advance against P.O and Material delivery time will take 2-4 Week.
4 5 Amp UPS power supply required for alarm genretion and Panel.
5 Water supply and electricity will be provided by client or end user on free of cost.
6 Detail Material delivery /execution schedule ,technical data sheet/compliance will be shared upon P.O confirmation.
7 System will be under DLP/Warranty for 12 months as per DLP Clause.
8 Client has to provide lockable store arrangement at site as vendor does not bear the responsibility of material theft and damage once supplied.
9 Balance Payment-40% upon material delivery at site should be clear within 5-7 working days from date of material receipt and 10% after testing and
10 Installation will be completed in a week time after material delivery at site subjected to site clearance and work front availability.
commissioning.
11 Upon completion, We will handover the work to Fire Spot Safety & Security System and will not wait for handingover to end user.
12 Material Insurance Premium should be payable by Fire Spot Safety & Security System.
13 Offer is prepared based on received above BOQ , any deviation in supply will be on additional cost.
14 Once the material is delivered in one location furthrer movment of material will not in our scope and you have to provide E-Way bill if required.
15 We will supply the material as per your site wise requirement and you have to clear the payment accordingly site by site.
16 Any dispute is subjected to Delhi and Andhra Pradesh Court of Juridiction.

Potrebbero piacerti anche