Landslide mitigation works are conducted in order tostop or reduce the


landslide movement so that the resulting damages can be minimized.

With a clear understanding of the causes and mechanicsof the landslide,


the landslide control works can be implemented according to Figure 1
Introduction
I
Introduction
I

Figure 1 Landslide Investegation Procedure


Introduction
I
The landslide mitigation works are broadly classifiedinto two
categories : 1) control works; and 2) restraint works.
Control Work
I
Surface Drainase

The surface drainage control works are implemented tocontrol the


movement of landslides accompanied by infiltration of rain water and spring
flows.
Control Work
I
Sub Surface Drainase

The purpose of the subsurface drainage control works isto remove the
ground water within the landslide mass and toprevent the inflow of ground
water into the landslide mass from outside sources
Control Work
I
Sub Surface Drainase

Drilling works for horizontal gravity drains


Control Work
I
Sub Surface Drainase

Drainage well
Control Work
I
Sub Surface Drainase
Control Work
I
Sub Surface Drainase

Cross Section of Drainage Tunnel


Control Work
I
Sub Surface Drainase

Inside of Drainage Tunnel


Control Work
I

Soil Removal Work


This is one of the
methods where the most
reliable results can be
expected, and generally
applies to small to
medium sized landslides.
Except for special cases,
the soil removal is
focused on the head
portion of the slide
Control Work
I

Butress Fill Work

This is one of the


methods where the
most reliable results
can be expected, and
generally applies to
small to medium sized
landslides. Except for
special cases, the soil
removal is focused on
the head portion of
the slide
Restrain
I Work

Pile Work
The pile works consist
of driving piles as
keys to tie together
the moving landslide
and the stable ground
to restrain the
movement. Generally,
a thick walled steel
pipe is used as the
pile, and is then filled
with concrete
Restrain
I Work

Cast in Place Pile Work

The large diameter cast-


in-place works function
similar to those of the
pile works and are
designed to tie the
moving landslide and
the stable ground
together. However it
involves much larger
diameters.
Restrain
I Work

Anchor Work

The anchor works utilize


the tensile force of
anchor bodies
embedded through the
slide mass and intc
stable earth, and are
connected to thrust
blocks located on the
ground surface
Restrain
I Work

Retaining Wall

Retaining walls are constructed to prevent smaller sized and


secondary landslides that often occur along te toe portion of the
larger landslides
Landslides
I

Okushiri Harbor Landslide Before Mitigation


Landslides
I

Okushiri Harbor Landslide After Mitigation


Landslides
I

Jinmyono Landslide Before Mitigation


Landslides
I

Jinmyono Landslide After Mitigation


Landslides
I Jizukiyama Landslide

Potrebbero piacerti anche