(Draft)
Minutes meeting of SOFITEL SO SAMUI project
On March 18th, 2019 at 2.00 pm. At AAPC THAILAND (ACCOR)
Attendants :
OWNERS K.T. PROPERTY
Mr. Sanitpong Kosaipolkul Mr. Songpol Thanatpojanamattaya
PROJECT MANAGEMENT SYNCHRON GROUP
Mr. Yodthana Worawuthangkul Mr. Manu Kupadavinij
Mr. Noppadol Chutakorn Mr. Sirirach Sakornchit
HOTEL CONSULTANTS AAPC THAILAND (ACCOR)
Mr. Kiesnakitt FAIMUENWAI
MEP ENGINEERS WEP ENGINEERING PARTNERS
Mr. Suthee Sukthammarat Mr. Nunthit Thongrak
FOOD SERVICE DESIGN TRI-ARC ENTERPRISES
Mr. Anusorn Booranasilp Mr. Sawattachat Srisopon
Regarding Building MEP engineering system and Kitchen lay out plan in Building P1AB
- WEP will develop MEP lay out and will be updated according to the suggestions of BA as shown in
BA additional data files. (surge tank & pump room for reflecting pond 1, surge tank & pump room for
tranquility pond, stair 1 at +85.13)
- One cocoon of function room (function room 2 at +96.00) seems not possible and need to be
omitted, which it might be compensated by Salas on the Rocks – New Design by BA.
(interior designer has proposed a new conceptual interior design on December 6th, 2018. This new
design affects the location of this oval room in which PM needs to discuss in these following issues;
- The new location is overlapping with shaft box for rain ventilation from So Hall’s large roof
along the wall prepared by BA.
- The new location is overlapping partitioning wall between Public area and Back of the house
area. Therefore, when the curtain is drawn opened, the overlapped part between the room
volume and the partitioning wall can be seen.
- The new location is overlapping into Back of the house area in which is the position of the
electricity room and IT room (EE & IT room). The position of these rooms is the same as in
every level.)
- Some BOH Offices and service area will be off site with full facilities : Main laundry, staff laundry, staff
changing room, BOH offices as finance, H.R., F&B. So, owner already prepares new 2 rai off-site as
location for these functions. Laundry will be off site because laundry is not be in scope work at the
beginning.(to be included to serve only Hotel for Guests and Staff uniform)
- Accor suggests and mension about DG plant and Transformer
- DG plant - Air Intake should be ducted via plenum from the upper floor to avoid hot air short
circuit caused by the current location.
- DG – Oil tank should be sufficient for 2 days.
- DGs to be 100% back up.
- Transformer as dry type which locates in this building should be the better choice than oil type.
After Accor recommend to use dry type, WEP will enclose this room with air conditioned.
- ACCOR suggests about Security Office lay out that should be relocated with suitable layouts.
- Engineering office should be modified and spare some area for water tank which WEP will develop
lay out plan for having surge tank of tranquility pond at basement floor. (+91.35)
- WEP answers Accor that air conditioning system is VRV system and there is energy recovery units
from VRV ODUs. About VRV system, Accor recommend DAIKIN.
- ACCOR considers about Heat pumps :
- Heat Pumps will be tube in shell.
- Heat Pumps is in well ventilated area.
- ACCOR considers about Kitchen make up air & Kitchen Exhaust :
- Kitchen Make up Air: 95% of Extraction
- Kitchen Exhaust Air: recommend stainless steel (because of salty air)
- Kitchen Exhaust Air: Activated carbon filter is needed due to discharging at low level.
- ACCOR suggest about Galleries or Multi-purpose room nearby main pool that lighting system should
be well prepared as well as the MEP provision need to be very careful.
- There is not Wine cellars at back of the house area. This issue will be consulted to Mr. Roger.
- Other suggestion from ACCOR :
- Cool Rooms: ODUs to be coordinated with Architect and MEP to be in well ventilated area. Also
need water hose bib and waterproof power sockets.
- ODUs of DX split units for IT sever room and Security Office, Front office to be located.
- Hotel Back Office: To be prepared and submitted to ACCOR DTS for review.
- WEP to review all Fire Escape Route.
- Coordination: To connect Accor IT with the WEP
- Coordination: IT consultant or SI company to on board.
- Coordination: Owner’s PM to coordinate quickly with Mr.Roger regarding the Hotel Back Office.
- Coordination: WEP to summarize all queries regarding technical of the Pools and water feature
and send to the Owner’s PM.
- Coordination: Site Storm drainage: NOT YET : WEP to work out with landscape designer.
- PM asks WEP to calculate and send the size of surge tank and pump room for reflecting pond 1 (at
+102.5) and PM will have meeting with CASE for redesign structural drawing for support these
function.
- PM will arrange the m eeting about present and consult update MES design (by WEP) & Kitchen
design (by TRI-ARC) with BA at BA’s office on next week. If BA is convenient, will be on March
28th,2018. If BA is not convenient or it is inappropriate, PM will inform the appropriate meeting date
and time to all the related parties.
-------------------------------------
ไม่มีห้องเครื่ อง
ด้านบน
ไม่มีห้องเครื่ อง
ด้านบน
ICE WELL
FOR CHAMPAGNE DISPLAY
DETAIL & PROVIDE BY ID.
ICE
BIN
DRAW
ER
JUICE
/ CH
AMPA
3-PORT GNE
POP-UP RECEPTACLE
12
HOT PLATE HOT PLATE HOT PLATE HOT PLATE KD-1
FOR BUFFET FOR BUFFET FOR BUFFET FOR BUFFET
002
AMBIENT COUNTER
ELECTRIC
SALAMANDER
ELECTRIC
ELECTRIC 2-BURNER 2-BURNER PASTA
GAS SOLID TOP
DEEP FAT FRYER
JUICE / CEREAL / MILK
PASS
CHARCOAL GRILL
BUILT-IN ICE WELL
ELECTRIC
MULTIFUNCTION
(FOR MORNING BREAKFAST)
W/ LIGHTING
COOKER
FOR FRUIT DISPLAY
1-WOK
ELECTRIC OVEN
02
DRAWER
DRAWER COLOR OVEN KD-1001
20.00 SQ.M. 03
04 GRILL STATION KD-1001
KD-1001 7.00 SQ.M.
WASTE BIN
REF.
WASTE BIN
WASTE BIN STORE
CABINET
REF. REF.
WASTE BIN
2893
PRINTER
PRINTER
(ON SHELF)
(ON SHELF) HAND WASH
BY ID.
OPEN CABINET
WASTE BIN
OPEN CABINET
ELECTRIC ELECTRIC HOT PAN HOT PAN HOT PAN HOT PAN COLD PAN COLD PAN COLD PAN COLD PAN 5-SYRUP 120 litre
SS WALL CLADBING STOCK POT NOODLE SOUP RANGE RICE WARMER GN.1/1 GN.1/1 GN.1/1 GN.1/1 GN.1/1 GN.1/1 GN.1/1 GN.1/1 (IN CABINET) DISH / GLASS
6-OPEN BURNER ( BY OS&E )
DETAIL & PROVIDE BY KEC STOVE
1000
WASHER
CHILLED PLATE
ON OPEN BASE
BEVERAGE PASS BOWL BOWL BOWL CO2
HAND WASH (HOOD TYPE)
DROP-IN
CONDIMENT
UPRIGHT HOT HOLDING
2 WOK RANG EXHAUST AIR GRILL
GAS RICE COOKER
COLD SECTION
WAFFLE CREPE
STORE REFRIGERATOR FLOW RATE : 20 AIR CHANGE PER HOUR
CONTROL UNIT
DIPPER WELL BANQUET CART MOBILE WORK TABLE 9 LITER
CABINET HAND SLICER 1 FULL SOLID DOOR COLD
BANQUET CART
(PLATES Ø229-254 MM. DETAIL & PROVIDE BY HVAC. CONTRACTOR
UV-C
(RED COLOUR) FOR BEVERAGE
RACK SLIDE
CUBE FLAKE WASTE BIN STORE
CABINET DRAWER REF.
PRINTER HAND WASH NOODLE SECTION HOT SECTION COLD SECTION BEV. SECTION
CHILLED PLATE
RACK SLIDE
CREPE / WAFFLE 10
POT WASH
DROP-IN
SIZE : 500x500
UNDERCOUNTER
ICE PRODUCTION
PANTRY
GLASS WASHER
KD-1002
DROP-OFF
ICE CUBE MACHINE
07 09 D03
( AIR COOL ) KD-1002 Ø75
A/C 25°C STAFF KITCHEN
WALL CABINET
KD-1002
4.00 SQ.M.
301 Kgs. / DAY
08 FOR FUNCTION ROOM LOW WALL PARTITION
2000
6.50 SQ.M. A/C 25°C
CHILLED PLATE
KD-1002 H. = 900 MM
A/C 25°C
900
BEVERAGE 16.50 SQ.M. 01
DROP-IN
BLENDER DETAIL & PROVIDE BY ARCHITECT
CHEESE&CHARCUTERIE WASTE
BAKE OVEN BREAD STATION 13.00 SQ.M. KD-1001
INSECT TRAP
(ON COUNTER)
DISPENSE
BIN
WASTE
A/C 22°C
BIN REF. FREEZER
WASTE BIN UPRIGHT DISPLAY UPRIGHT DISPLAY
STORE
REFRIGERATOR, REFRIGERATOR,
8.00 SQ.M. ICE FLAKE
CABINET
1 FULL GLASS DOOR
W/ REMOTE CONDENSING
2 FULL GLASS DOOR
W/ REMOTE CONDENSING
BUILT-IN
BAKE OVEN
HAND WASH
HAND WASH DISH WASH &
W/ PROOFER
900
(AIR COOL)
130 KGS. / DAY
PRINTER
(ON SHELF)
FOR CHEESE FOR MEAT TOASTER
POLY CUTTING BOARD
STEWARD STORE
A/C 25°C
BEVERAGE D03
WALL CABINET
STORE 1500
A/C 22°C
6.00 SQ.M.
STAFF DINING
( 45 SEAT )
LOW WALL PARTITION
D05 H. = 1500 MM
115.00 SQ.M.
COFFEE STATION COLD PASS DETAIL & PROVIDE BY ARCHITECT
HIGH STORAGE
UPRIGHT
REFRIGERATOR
UPRIGHT
REFRIGERATOR 5.50 SQ.M. PASS W05
CABINET 1 FULL SOLID DOOR 2 FULL SOLID DOORS
FOR BEVERAGE RACK SLIDE
FOR BEVERAGE
SIZE : 500x500 AIR CURTAIN
HAND WASH STAFF TOILET
( UNISEX )
(ON SHELF)
HAND WASH COFFEE
PRINTER
HAND WASH
MACHINE
D05
HAND WASH
UV KNIFE
MOBILE TRASH BIN
POTATO PEELER
WALL CABINET
MEAT 6.50 SQ.M.
PANINI
30 Lts.
GRILL
(ON SHELF) PRINTER OVEN
HIG
4.2 LITER MIXER
SPIRAL
6-SLOTS TOASTER
PLATE WARMING CABINET REF. REF. FREEZER 20 Lts. MIXER
PLATFROM
DRAWER
ICE FLAKE MACHINE
REF.
UV KNIFE
40 Lts. KNEADER
HAND WASH SCALE
EXHAUST AIR GRILL ( AIR COOL ) 50 Kg.
HAND WASH
130 Kgs. / DAY
SERVICE LIFT
850
FLOW RATE : 20 AIR CHANGE PER HOUR DOUGH DIVIDER
SIZE : 500 x 500
BAKERY BAKERY
AIR CURTAIN
DETAIL & PROVIDE BY HVAC. CONTRACTOR
DRAWER
RACK SLIDE
DRAWER
CITRUS
WATER COOLING UNIT
JUICE
SS WALL CLADBING CR-07 ( 50 LTs.)
DETAIL & PROVIDE BY KEC
KITCHEN PAN WASH AREA
SUPPORT KITCHEN 900 BAKERY & PASTRY
DRAWER
2-WOK RANGE
A/C 18°C TO 22°C
MOBILE WORK TABLE
RINSE
A/C 25°C
VACUUM MEAT SLICER
CHILLER +2°C
EXTRACTOR
15.50 SQ.M.
MACHINE
ELECTRIC
SEAFOOD
HAND WASH
JUICE
MEAT MINCER
UNDERCOUNTER
GLASS WASHER A/C 25°C 10.00 SQ.M. GENERAL FLOUR BIN FLOUR BIN FLOUR BIN FLOUR BIN
SANITIZE
SECURITY / PREP.
HOSE REEL
HANGING
GN. TRAY SLIDE
W/ UNDER SHELF W/ UNDER SHELF
STEWARD RECEIVING
4 SOLID DOORS
SCALE
GN. TRAY SLIDE
DOU
A/C 25°C
GH
PROCESSOR
WALL CABINET
HAND WASH SHE
4 X 2 LEVEL HOT BOX (ON WALL SHELF)
A/C 25°C ETE
FOOD
STORE / PURCHASING 5.50 SQ.M. ROOM SERVICE
R
SCALE
REF.
WALL CABINET
BAKERY BAKERY BAKERY BAKERY
13.00 SQ.M. DISH / POT SS WALL CLADBING
OFFICE TRAY SLIDES TRAY SLIDES TRAY SLIDES TRAY SLIDES
DETAIL & PROVIDE BY KEC A/C 25°C A/C 22°C
WASH A/C 25°C
AIR CURTAIN AIR CURTAIN AIR CURTAIN
PLATFROM
SQ.M.
13.50RACK 16.00 SQ.M.
A/C 25°C
TROLLEY BUN WARMER
6.50 SQ.M.
RACK DOLLY SLIDE RACK SLIDE
BURIED CONDUIT FOR DATA CABLE (BUILT-IN CABINET)
WORK TABLE
13.50 SQ.M. CONNECT TO RECEIVING OFFICE
SIZE : 500x500 SIZE : 500x500 REF.
CR-05 W/ SINGLE PIECE WHITE POLYPROPYLENE TOP
BAKERY ROOM
& PROVIDED BY MAIN CONTRACTOR MICROWAVE CR-06 CR-04 H.= 850 MM. DETAIL & PROVIDE BY KEC A/C 22°C
MEAT SLICER
UPRIGHT
OVEN
SEAFOOD CR-08
INDUCTION
HAND WASH (IN CABINET) REFRIGERATOR
1 FULL SOLID DOOR FRUIT / VEGETABLE MEAT FOOD PROCESSOR
BAKERY
TRAY SLIDES
BAKERY
TRAY SLIDES
43.00 SQ.M.
6-SLOTS TOASTER FOR BEVERAGE
CHILLER +6°C CHILLER +1 °C CHILLER +2°C BAKERY & PASTRY INDUCTION
WALL CABINET WALL CABINET WALL CABINET
CR-03
WALL CABINET
( SYSTEM BY KEC ) ( SYSTEM BY KEC ) ( SYSTEM BY KEC ) FREEZER -18°C
GENERAL
8.00 SQ.M. 7.00 SQ.M. 7.00 SQ.M. ( SYSTEM BY KEC ) BAKING AREA
FREEZER -22°C
WALL CABINET
MAIN CONTRACTOR / ARCHITECT CONFIRM MIXER 7 Lts.
MAIN CONTRACTOR / ARCHITECT CONFIRM
6.00 SQ.M.
BAKERY BAKERY
DOOR HEIGHT TO MATCH DOOR HEIGHT TO MATCH MAIN CONTRACTOR / ARCHITECT CONFIRM TRAY SLIDES TRAY SLIDES
W/ AIR CURTAIN AIR FLOW W/ AIR CURTAIN AIR FLOW DOOR HEIGHT TO MATCH ( SYSTEM BY KEC )
DISH CADBY LOADING / UNLOADING W/ AIR CURTAIN AIR FLOW
GN TROLLEY GN TROLLEY GN TROLLEY GN TROLLEY 6.50 SQ.M.
MAIN CONTRACTOR / ARCHITECT CONFIRM
HAND WASH
PLATFORM DOOR HEIGHT TO MATCH
(18 x 2/1 GN.) (18 x 2/1 GN.) (18 x 2/1 GN.) (18 x 2/1 GN.)
CHOCOLATE
DIPPING 2 CONVECTION
INSECT TRAP
A/C 25°C W/ AIR CURTAIN AIR FLOW
SERVICE CORRIDOR & TEMPERING
INDUCTION
W/ UNDER TRAY SUPPORT
3-DECK ELECTRIC OVEN
W/ UNDER PROOFER
FOR CHOCOLATE
(ON SHELF)
SS WORKING TOP
HOSE REEL
WASTE BIN
120 litre H. = 750 MM. AFF. FLORIST ROOM ICE CREAM
FREEZER
REF.
( BY OTHER ) D03 MAKER
DISH CADBY A/C 22°C AIR BY ARCHITECT AIR BY ARCHITECT AIR BY ARCHITECT AIR BY ARCHITECT INSECT TRAP PUMP ROOM
SS WORKING TOP ( BY ARCHITECT ) ( BY ARCHITECT ) ( BY ARCHITECT ) ( BY ARCHITECT )
H. = 750 MM. AFF. 900
11.00 SQ.M.
ROLLING SHUTTER DETAIL ROLLING SHUTTER DETAIL ROLLING SHUTTER DETAIL ELECTRICAL DISTRIBUTION CABINET
& PROVIDE BY ARCHITECT & PROVIDE BY ARCHITECT & PROVIDE BY ARCHITECT SINGLE PIECE GRANITE TOP ( BLACK COLOUR )
FOR - REMOTE SURFACE SWITCH
H.= 850 MM.
( PROVIDED BY ELECTRICAL CONTRACTOR )
DETAIL & PROVIDE BY KEC
UPRIGHT REFRIGERATOR,
2 FULL GLASS DOORS
+10 °C (70% RH)
INSECT TRAP
D03 BUGGY SERVICE
AIR BY ARCHITECT
( BY ARCHITECT )
1100
FOOD LINEN
DELIVERY DELIVERY TRUCK
TRUCK
SHAFT
GARBAGE
TRUCK
AIR BY ARCHITECT
( BY ARCHITECT )
INSECT TRAP
CHARCOAL
11
STORE
28
A/C 25°C
SORTING AREA
4.00 SQ.M.
GAS STATION
13.00 SQ.M.
DRY
GARBAGE
2.00 SQ.M.
CR-01
WET GARBAGE
CHILLER +8°C
7.50 SQ.M.
EMPTY
BOTTLE
6.00 SQ.M.
2893
800
800
800
800
STAFF TOILET STAFF TOILET
( FEMALE ) ( MALE )
SERVICE CORRIDOR
A/C 25°C
Ø75 Ø75
INSECT TRAP
1500
4-TIER PLAIN SHELF
PLASTIC DUNNAGE RACK
( BY OS&E )
( BY OS&E )
OFFICE A/C 25°C
A/C 25°C 5.00 SQ.M.
EXECUTIVE
SERVICE CORRIDOR
4-TIER PLAIN SHELF
4-TIER PLAIN SHELF 4-TIER PLAIN SHELF
4.50 SQ.M.
( BY OS&E )
5.50 SQ.M. FOR BEVERAGE 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF
A/C
( BY OS&E )
( BY OS&E )
( BY OS&E )
(NON-FOOD) RECREATION ROOM
( BY OS&E )
1500
STORE STORE
A/C 25°C LOST & FOUND A/C 25°C A/C 25°C A/C 25°C
TOTAL AREA 56.00 SQ.M. CLEAN LINEN Ø75
30.00 SQ.M. 37.00 SQ.M. 15.50 SQ.M.
A/C 25°C
12.50 SQ.M.
( BY OS&E )
( BY OS&E ) UPRIGHT 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF ( BY OS&E ) ( BY OS&E ) ( BY OS&E )
DETAIL BY ARCHITECT REFRIGERATOR
& PROVIDED BY MAIN CONTRACTOR 2 FULL SOLID DOORS
INSECT TRAP
FOR BEVERAGE
4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF
( BY OS&E ) 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF ( BY OS&E ) ( BY OS&E ) ( BY OS&E )
OPERATING SUPPLY
& CLEANING EQUIPMENT LINEN TROLLEY LINEN TROLLEY LINEN TROLLEY LINEN TROLLEY
4-TIER PLAIN SHELF
STORE
(BY OTHER)
(BY OTHER)
(BY OTHER)
( BY OS&E )
( BY OS&E )
( BY OS&E )
Ø75 A/C 25°C
A/C 25°C A/C 25°C 4.50 SQ.M. UPRIGHT
4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF
(BY OTHER) (BY OTHER) (BY OTHER) (BY OTHER) (BY OTHER) ( BY OS&E ) 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF 4-TIER PLAIN SHELF ( BY OS&E ) ( BY OS&E ) ( BY OS&E ) ( BY OS&E )