4.435 m
4.43 m
4.43 m
4.43 m
4.43 m
5. DETAILS OF THE SEWERS INSTALLED UNDER DUBAI MUNICIPALITY DRAINAGE &
IRRIGATION DEPT. ARE SHOWN IN ATTACHED PART PLAN FOR REFERENCE. THE
100 mm THICK 100 mm THICK EXACT LOCATION TO BE DECIDED ON SITE WITH TRIAL TRENCHES AND
100 mm THICK
CONCRETE PANEL CONCRETE PANEL 100 mm THICK 100 mm THICK COORDINATION WITH THE DM & CONSULTANT IN PARTICULAR AREA.
CONCRETE PANEL
CONCRETE PANEL CONCRETE PANEL
6. THE CONTRACTOR RESPONSIBLE TO PROTECT EXISTING SEWERAGE/ DRAINAGE/
IRRIGATION/ HOUSE CONNECTION LINE. ANY DAMAGED TO THESE SERVICES WILL
BE CHARGED TO CONCERN PARTY.
MAXIMUM EXCAVATION LEVEL 7. TEMPORARY HOARDING OUT WITH THE BUILDING LINE TO BE AGREED WITH
MAXIMUM EXCAVATION LEVEL MAXIMUM EXCAVATION LEVEL
9.50 m
-1.635 m DMD MAXIMUM EXCAVATION LEVEL MAXIMUM EXCAVATION LEVEL DUBAI MUNICIPALITY OR CONSULTANT.
-1.635 m DMD -1.635 m DMD
-1.635 m DMD -1.635 m DMD
9.50 m
8. PROGRAM OF THE ABOVE WORKS MUST BE COORDINATED WITH DUBAI
9.50 m
9.50 m
9.50 m
MUNICIPALITY CONTRACTOR AND CONSULTANT WITHIN THE AREA.
9. THE MINIMUM CLEAR DISTANCE BETWEEN THE TIEBACK ANCHORS AND THE
PIPELINE SHOULD BE 1.0 METER. OTHERWISE SHORING TO BE CARRIED OUT
WITHOUT TIEBACK ANCHOR.
5.065 m
5.065 m
5.065m
5.065 m
5.065 m
THE METHOD OF SHORING THE BASEMENT EXCAVATION IS APPROVED SUBJECT TO
FOLLOWING:
2. THE 'H' PILES SHALL BE WITHIN MAXIMUM OF 600mm OUTSIDE THE PLOT LINE
TOE LEVEL SUBJECT TO EXISTING SERVICES AND WILL HAVE TO BE REMOVED AFTER THE
-6.70 m DMD CONSTRUCTION OF FOUNDATION UPTO GROUND LEVEL OR CUT TO 2.00m BELOW.
TOE LEVEL TOE LEVEL TOE LEVEL TOE LEVEL THE VOIDS MUST BE COMPACTED AND TILING MUST BE MADE TO ROADS
-6.70 m DMD -6.70 m DMD -6.70 m DMD -6.70 m DMD
SECTION 1D DEPARTMENT STANDARDS.
DETAILS OF H BEAMS
SECTION 1 SECTION 1A SECTION 1B 3. NO OPEN EXCAVATIONS WILL BE PERMITTED IN RIGHT OF WAYS (ROW) EXCEPT
DETAILS OF H BEAMS SECTION 1C B161-B198 (38 Nos)
DETAILS OF H BEAMS DETAILS OF H BEAMS IN THE CASE OF PUBLIC FACILITIES / LANDSCAPING WITH NOC FROM DM
B37-B49 (13 Nos) DETAILS OF H BEAMS PLANNING DEPARTMENT.
B1-B36 (36 Nos)
B50-B128 (79 Nos) B129-B160 (32 Nos)
4. ALL EXISTING SERVICES AND ROAD STRUCTURES WILL HAVE TO BE PROTECTED
AT ALL TIMES AND ANY DAMAGES TO THEM WILL BE TREATED AS VIOLATION OF
LAW NO. 2/94 AND LOCAL ORDER NO. 84/94 ON THE PART OF BUILDING
CONTRACTOR, AND WILL BE TREATED AS SUCH.
IN ADDITION THE REIMBURSEMENT OF ALL COSTS OF REPAIRS WILL BE TO THE
OWNER'S ACCOUNT.
INSIDE OUT SIDE ( OPEN AREA ) INSIDE 5. NOC FROM DM-DRAINAGE DEPARTMENT SHOULD BE OBTAINED FOR ANY
CAPPING BEAM PLOT LIMIT EXISTING NEIGHBOUR PLOT PLOT LIMIT OUT SIDE ( ROAD 28.40 ) SHORING ANCHORS PROJECTING OUTSIDE THE PLOT LIMIT PRIOR TO OBTAINING
SHORING NOC FROM SERVICES CO-ORDINATION CENTER
TOP OF CAPPING BEAM H BEAM 203 x 203 x 46 Kg/m TOP OF H BEAM
+2.80 m DMD 2.0 m c/c +2.80 m DMD PLOT LIMIT 6. THIS NOC ISSUED AS A GENERAL TECHNICAL GUIDANCE TO THE OWNER AND
DUBAI MUNICIPALITY BEARS NO RESPONSIBILITY TOWARDS ANY OTHER
2 T 16
CAPPING BEAM INSIDE OUT SIDE ( OPEN AREA ) MISHAPS/DAMAGES OCCURRING TO ANY PARTY WHATSOEVER.
7. DM-SCC SHORING VALID ONLY FOR WORKS IN ROW, PUBLIC FACILITIES AND
ANCHOR LEVEL TOP OF CAPPING BEAM
2800
30°
+0.00 m DMD 10 @ 200 mm 4 T 25
APPROVED
FORCE = 656.3 KN
8.00 m
( 2 LINKS )
600
650 No OF STRANDS = 5
45°
ANCHOR @
4.43 m
00
No OF STRANDS = 5
12.14 m
Dia OF STRANDS = 15.2 mm 2 STEEL GRADE : 460 N/sq.mm (Non Epoxy Quoted)
SPACING = 3.25 m
7.14 m
MAXIMUM EXCAVATION
PROPOSED ANCHOR @ 600 mm Dia @ 650 mm c/c LEVEL
10.00 m
3.25 m c/c CONTIGUOUS PILE
MAXIMUM EXCAVATION -1.635 m DMD
LEVEL
600 mm Dia @ 650 mm c/c -6.34 m DMD
6560
9 T 16 9 T 16
3000
600
SECTION FOR EXISTING CONTIGUOUS PILE SECTION 2'
WALL WITH PROPOSED ANCHOR 600 mm CONTIGUOUS PILE WALL
600 mm CONTIGUOUS PILE WALL P1 - P45 ( 45 Nos )
100 mm THICK
CONCRETE PANEL
(APPROX)
4.435
M/S P N C ARCHITECTS
PLOT LIMIT PHASE 1
EXCAVATION FINISHED UP TO FINAL
9.50 m
SECTION DETAIL
SECTION 4 SECTION 5 DRAWING
OPEN EXCAVATION
TOE LEVEL
-6.70 m DMD
SD - 01 08