Sei sulla pagina 1di 3

1/20/2016 TELECOM 2G,3G,4G,RF,IPv6 Study Materials: RF Survey/IBS Survey

0   More    Next Blog» rajran485@gmail.com   Dashboard   Sign Out

TELECOM 2G,3G,4G,RF,IPv6 Study
Materials
Mobile Communication,Question related to GSM,CDMA,WCDMA & LTE,Short description about RF
Deive Test,RF Planning,RF Optimization,IPv4 & IPv6

Sunday, December 30, 2012 About Me

RF Survey/IBS Survey

RESPONSIBILITIES: 
Suggest and implement Network Parameters changes for reducing call drops and Dharmendra singh 
Follow 364
better coverage and analysis of impact after changing of parameter 
New Site verification & Optimization of the network, Coverage for the integrated
Presently 2G / 3G / WCDMA
indoor sites with the help of TEMS Investigation GSM 8.0.3. ( Walk Test ) 
RF/Telecom Consultant  in United
Conduct RF Technical Site Surveys (TSS) for the In‐Building design.  Telecom Limited  since July 2012
Preparing RF Technical Design Proposal (TP) for In‐Building Solutions to meet to Till Date.Extensive knowledge
customer KPI’s Coverage Design plan.  of TEMS, NEMO, PROBE,
Performing RF surveys and then preparing appropriate design and proposal MAPINFO PROFESSIONAL,
products such as Antenna Location & Cable Routing  MCOM, ACTIX & SCANNER
Calculation of Link Budget (EIRP) and designing of the schematic diagram for IBC (PCTEL, R&S TSMO).
solutions 
View my complete profile
Carrying out Transmission Test according to the design using NET MONITOR Test
Transmitter Manager 
Followers
Checking In building installations and make sure that certain standards and quality
level is maintained  Join this site
with Google Friend Connect
Supervising Sweep Test for feeders and jumpers using Site Master  Members (98)  More »
Once RF equipment is installed, perform RF data collection to ensure that the
quality of service meets RF design specifications such as RxLev, Rx Quality, Handover,
parameter verification. 
Based on data collection activities, adjust any design and proposal products that do
not meet specifications and/or recommend equipment or parameter adjustments. 
Verify macro, micro and In‐building coverage plans to meet quality specifications. 
Checking the post installation coverage, spillage, and Handover tests using TEMS
Investigation /Probe/Agilent/Nemo. 
Already a member? Sign in
Optimization of the design, by implementing necessary changes to meet the KPIs. 
Site Auditing for the indoor sites to verify site database and cell design criteria’s.
Checking coverage for Indoor solution to check the sufficient Rx strength & Rx Google+ POST
Followers
quality. 
►  2015 (3)
Checking all values, handovers relating with neighboring cells. Hands on experience ARTS
of TEMS Investigation/NEMO/PROBE GSM & MapInfo Professional. ►  2014 (8)
Follow
►  2013 (53)
Posted by Dharmendra singh at Sunday, December 30, 2012  ▼  2012 (7)
Recommend this on Google ▼  12/30 ­
01/06 (4)
Telecom
No comments: Basic
Question
s
Post a Comment
STEPS TO
INSTALL
Newer Post Home Older Post TEMS

Subscribe to: Post Comments (Atom) 36 have us View Drive Test


in circles all Engineer
/RF

http://rftelecomm.blogspot.in/2012/12/ibs­engineerrf­engineer.html 1/3
1/20/2016 TELECOM 2G,3G,4G,RF,IPv6 Study Materials: RF Survey/IBS Survey
Engineer
RF
Survey/I
BS
Survey

►  12/23 ­
12/30 (3)

Popular Posts

GSM Interview Question ­Answer
1.                     What is the function of
SDCCH & SACCH ? Ans. (a) SDCCH­­
­­ Slow Dedicated Control Channel.
              ...

Telecom Basic Questions
1.       The OSI model was developed
by ISO in the year___________
a.       1985 b.      1988 c.       1965 d.     
1984 2.     ...

Drive Test Engineer/RF Engineer
§ Means collecting data on vehicle
movement. Its variation has also
intuitive: Walk Test, i.e., collect data
by walking areas of interes...

LTE DRIVE TEST PARAMETERS
RSRP :­ Reference signal receive
power. •      RSRP (dBm) = RSSI
(dBm) ­10*log (12*N) where RSSI =
Received Signal Strength Indicator ...

Resume Format for RF Engineer
                    Dharmendra Kumar Singh
                    Email
id:hidharmendrasingh@gmail.com
                    Mobile No: ***...

Basic Parameter of WCDMA
Basic Parameters of WCDMA
Frequency
Band                                    :           2100
MHz                                    ...

WCDMA/3G Questions & Answers
General 1.              What is the
experience and involvement in your
current and previous UMTS design
projects? Talk about your curr...

RF Optimization and Log File
Analysis in GSM
Optimization and Log File Analysis in
GSM 1. INTRODUCTION Every alive
Network needs to be under continues
control to maintain/improve th...

STEPS TO INSTALL TEMS
STEPS FOR INSTALLING TEMS
SOFTWARE § First install .Net 3 and
.NET 3.5 in your PC. § After installing
TEMS, install the driver...

RF Survey/IBS Survey
RESPONSIBILITIES: § Suggest and
implement Network Parameters
changes for reducing call drops and
better coverage and analysis of
impact a...

Simple template. Template images by luoman. Powered by Blogger.

http://rftelecomm.blogspot.in/2012/12/ibs­engineerrf­engineer.html 2/3
1/20/2016 TELECOM 2G,3G,4G,RF,IPv6 Study Materials: RF Survey/IBS Survey

http://rftelecomm.blogspot.in/2012/12/ibs­engineerrf­engineer.html 3/3

Potrebbero piacerti anche