Abstract Cost Estimate for Construction of View Point and Park at Naya Talab Ring Road
S .No. Particular
1 Pitching
4 Creation of Landscaping
Cost
26.13
26.88
5.05
24.58
82.64
s Private Limited
MADHYA PRADESH URBAN DEVELOPMENT COMPANY, DATIA MINI SMART CITY
Estimate for Development of View Point and Park
Near Naya Talab Ring Road
AS per Urban Development ISSR Inforce of 10th May 2012 & MPPWD SoR Wef Nov 2014
1. Pitching
S. Measurements 10%
No. less on
Description of Item Quantity Unit Rate
No. L B H SOR
1631347
S. Measurements 10%
No. less on
Description of Item Quantity Unit Rate
No. L B H SOR
538499
443394
2613240
26.13
MADHYA PRADESH URBAN DEVELOPMENT COMPANY, DATIA MINI SMART CITY
Estimate for Development of View Point and Park
AS per Urban Development ISSR Inforce of 10th May 2012 & MPPWD SoR Wef Nov 2014
Bottom of Toe (For View Point 200m + 1 700.00 0.90 0.75 472.5
For opposite of View Point 500m near
Sewda Chungi Road)
3
Cement concrete grade M-10
(Nominal Mix) with 20 mm
maximum size of stone
aggregate.
5
Cement concrete grade M-20
(Nominal Mix) with20mm
maximum size of stone
aggregate.
1.a Earth work in excavation in ordinary soils 39 0.90 0.90 1.00 31.59 Cum
(Coloumns)
1.b Below Plinth Beam 1 89.90 0.60 0.30 16.182 Cum
Total 47.772 Cum 129 116.1
2
P.C.C. ln foundation in M - 10 39 0.90 0.90 0.10 3.159 Cum
Below Plinth Beam 1 89.90 0.60 0.10 5.394 Cum
Total 8.553 Cum 3528 3175.2
Form work for coulmn Above Plinth Coloumns 39 0.80 1.50 46.8 Sqm 282 253.8
S. No. Particulars No Lengh Brdth H/D Qty Unit Rate 10% Less
L B H
L B H
Refilling of soil = Total Excavation - P.C.C.- 22.48 Cum 59 53.1
Footing-coulumn
Super Structure
Reinforced cement concret work
inbeams,suspended floors, roofs having slope up to
15'landings, balconies, shelves, chajjas, lintel,bands plain
windo sills,staircases and spiral stair cases up to
floor two level excluding the cost of
centering, shuttering,finishing and reinforcwith Cement
9 concrete grade M-20 (Nominal Mix with 20mm maximum 39 0.20 0.20 1.50 2.34 Cum 5120 4608
size of stone aggregate). UADD Vol II 5.3
1 : 1.5 : 3 Reinforced cement concrete in
Coulmn
11
20 cm thick Brick work in 1:8 cm. 1 117.20 0.2 1.5 35.16 Cum
Wall (Length - coloumn)
Deduct for opening (39 openings) -39 2.60 0.20 1.20 -24.336 Cum
Gate (Large) -1 4.40 0.20 1.50 -1.32 Cum
Gate (Small) -1 2.40 0.20 1.50 -0.72 Cum
Rate by SOR 6.39 minus 6.4 8.78 2955 2659.5
5546
27157
57222
58093
2906
3875
24840
11878
Amount
1194
63391
9619
10783
15795
23361
S. No. Particulars No Lengh Brdth H/D Qty Unit Rate 10% Less
L B H
12 Outer 1 125.00 1.5 187.5 SqM
Inner 1 125.00 1.5 187.5 SqM
Inner Part Jali side (2.8+1.2+1.20) 39 5.2 0.2 40.56 SqM
Top 39 0.2 0.2 1.56 SqM
Total 417.12
Deduction
Gate (Large) -1 4.4 0.2 1.2 -0.88 Cum
Gate (Small) -1 2.4 0.2 1.2 -0.48 Cum
Jali -39 2.60 0.2 1.2 -24.336 Cum
Total (After deductions) 391.42 102 91.8
Painting on steel work item (UADD Vol II 78 2.6 1.2 243.36 SqM
13.62.1) Synthetic Enamal Paint. (39x2)
14
Gate Grill (adding both gates) (1x2) 2 6.8 1.2 16.32 SqM
Total 259.68 65 58.5
Total Cost
35933
22898
15191
115506
505189
5.05
MADHYA PRADESH URBAN DEVELOPMENT COMPANY, DATIA MINI SMART CITY
Estimate for Development of View Point and Park
Near Naya Talab Ring Road
AS per Urban Development ISSR Inforce of 10th May 2012 & MPPWD SoR Wef Nov 2014
4. Landscaping at Park
S. No PARTICULARS OF THE ITEMS N L B H QUANTITY UNIT RATE Revised
(10% Less)
DI. LANDSCAPING
UADD SOR item No. 19.1 Volume- II
Trenching in ordinary soil upto a depth of 60 cm
including removal and stacking of serviceable material
and then disposing of by spreading and neatly leveling
with in a lead of 50 m and then making up the
trenched area to propoer levels by filling with earth or
1 earth mixed with sludge or/ and manure before
and after flooding trech with water (excluding 2200 0.3 660 Cum 129 116.10
cort of imported earth, sludge or manure)
76626
163944
3089
12420
10973
S. No PARTICULARS OF THE ITEMS N L B H QUANTITY UNIT RATE Revised
(10% Less)
UADD SOR Item No. 5.2 Volume- II
Reinforced cement concrete work in wall (any thickness)
including attached plaster , buttresses, plinth and
string courses, fillets, colmns, pillars, piers,
abutments, posts and struts et., up to floor two level
excluding cost of centering shuttering, finishing and rein
for cement.
5.2.1 Cement Concrete grade M-20 (Nominal Mix) with
2 20 mm Maximum size of stone aggregate (Both side 2 320 0.1 0.4 12.8 per cum 5050 4545.00
of paving)
58176
27648
S. No PARTICULARS OF THE ITEMS N L B H QUANTITY UNIT RATE Revised
(10% Less)
Paved Area
UADD Vol II 2.27.3
Supplying and filling in plinth under floors including,
watering, ramming consolidating and dressing
1 complete.
Total
AMOUNT
49766
73872
246240
27130
163584
200000
200000
S. No PARTICULARS OF THE ITEMS N L B H QUANTITY UNIT RATE Revised
(10% Less)
DIV. Lighting and Illumination works
Total Cost
56943
40032
92745
51840
41850
861300
2458178
24.58