Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
COMPUTERORIGINAL
BREAKER POLES FRAME/POLE BEAM,ETC. OPERATING MECHANISM SF6 GAS TOTAL MASS 2. TERMINAL OF ALUMINIUM.
3. TERMINAL LOAD MAX.1500 N STATIC /
300x3 160x2+105 170 7 1502 APPROX.
3000 N DYNAMIC IN ANY DIRECTION.
1
4174 4. HOLES FOR EARTHING CLAMP.
1750 1750 5. DYNAMIC FORCE DURING OPERATION.
80
255
267 6. ARC CHAMBER INSULATOR.
255
180 180 7. SUPPORT INSULATOR.
20
8. OPEN/CLOSE INDICATOR.
9. DENSITY MONITOR.
1164
6 2,3
1324
40 10. OPERATING MECHANISM (FSA1).
40
44.5
22.5
11. FOUNDATION BOLT.
28
190
D=14(15x) 12. FOUNDATION DETAIL.
20
40
7 13. CHARGING POINT
2
40
1220
4 4 14. BREAKER FRAME (SUPPORT STRUCTURE)
44.5
B
5196
13 319 -ALL DIMENSION ARE IN MM.
185
3837
9 563
10 4 )
14 60
4(5x
2205
2507
D=
1
44
40
28
182
158
P.L.
G.L.
300
150
M24
Holes D=32 for bolt M24
161.5
750 130
P.L.
75
101.5
G.L.
420±1
420±1
36
33.5
150
61.5
57
750
400±1 400±1 Detail - B
2520 Pocket-150 sq.x750
Foundation bolt Depth for foundation bolt
Foundation plan
GENERAL ARRANGEMENT FOR REF. DRG.NO.1HYB902860-1