Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1. Your friend lives in a building named "Kam Hing Building". You don't know where it is and
of course you don't know how to reach there. Please find out this building in the online map
and list its address below:
2. If you go there by LRT (Light Rail Transit), which station should you get off the train?
3. Your friend and you want to watch movies after you meet at his home. Please find out the
nearest cinema and its telephone number so you can reserve tickets before. Tel: 2388 0002
ADDRESS: Kwai Ying Building, 1 Shek Man Path, Kwai Chung, Hong Kong
Completion year:
1. Phase 1: 1997
2. Phase 2: 1997
3. Phase 3: 1998
3. You want to buy a flat in the newest phase. Please check and list the details of the latest
secondary property sales records so that you can set your budget accordingly.
4. You have a child who will enter primary
school soon. Please check the number of
the school net that Discovery Park
belongs to, and list all primary schools
that belong to this school net. (Hint: you
should go to zoom level 4 to get your
results)
a) H
o
l
y
Number of Flats: 8
6. You are also concerning about the surrounding environment of your new home. One major
development project nearby is the Tsuen Wan Bay Reclamation. Please go to an appropriate
government website to obtain the background of this project, and also get an image shows the
extent of the reclamation. (Hint: you may find the link by clicking on the project icon on the
appropriate map layer)
Project Profile
A study is carried out by the Hong Kong Government in 1986 to explore the landuse-transport
infrastructure of Tsuen Wan New Town. Following the endorsement of Metroplan by the
Executive Council in September 1991, the Planning Department conducted planning studies in
1992 to formulate a Development Statement for Tsuen Wan New Town with a view to implement
the Metroplan concepts at the district level. The Territory Development Department then
commissioned Maunsell Consultants Asia Lt. (MCAL) on 20 June 1995 to undertake the “Tsuen
Wan Bay Further Reclamation, Area 35 – Planning, Environmental and Engineering
Investigations” study. As a result of the proposed reclamation, existing marine facilities including
the Tsuen Wan Public Cargo Working Area and Tsuen Wan dangerous goods Anchorage
(TWDGA) will have to be relocated to allow Tsuen Wan Bay Further Reclamation (TWBFR) to
proceed. A commission is then done by the Marine Department (MD) separating site search
studies for relocating the TWDGA. In early 1996, the site search study was completed with an
Initial Environmental Impact Assessment (IEIA).
7. Study Brief Issued or DEP's decision on permission to apply directly for permit
SB-007/BC - Tsuen Wan Bay Further Reclamation - Area 35 Engineering, Planning and
Environmental Investigation (Hardcopy available only)
8. EIA Report
AEIAR-004/1998 - Tsuen Wan Bay Further Reclamation, Area 35, Tsuen Wan Engineering,
Planning and Environmental Investigation