Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Tahunan
2011
Annual report 2011
Daftar Isi Contents 2 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 3
Daftar Isi
Contents
01
Potret Kerja
02
Upaya Peningkatan
03
Berbagai Upaya
04
Proyek Utama 2011
05
Pemberdayaan
06 Internal BPMIGAS
BPMIGAS Produksi Penyelesaian Masalah Kapasitas Nasional
Work Performance of BPMIGAS Efforts to Increase Production Troubleshooting Efforts Main Project 2011 Empowerment of National
Capacity
A Wilayah Kerja Hulu Migas 16 A Realisasi Proyek Baru 57 A Pengadaan Lahan 74 A Lapangan Banyu Urip 89 A Pemanfaatan Barang Dan 110 A Rencana Strategis 130
Upstream Oil and Gas New Project Realization Land Provision Banyu Urip Field Jasa Dalam Negeri (RENSTRA) BPMIGAS
Working Area The Utilization of Domestic 2011 - 2015
B Kegiatan Enhanced Oil 58 B Pengamanan Obyek Vital 76 B Indonesia Deepwater 92 Goods and Services Strategic Plan (RENSTRA)
B Kegiatan Eksplorasi 22 Recovery (EOR) Nasional Development (IDD) BPMIGAS 2011 - 2015
Exploration Activity EOR (Enhanced Oil Securing National Vital B Pengelolaan Aset 111
Recovery) Activity Objects C Lapangan Abadi 94 Asset Management B Pengelolaan Dan 134
C Kegiatan Pengembangan 28 Abadi Field Pengembangan SDM
Dan Pemeliharaan Sumur C Reaktivasi Sumur-sumur 60 C Peraturan Perundangan 82 C Peningkatan Peran 112 BPMIGAS
Well Development and Suspended Regulations D Lapangan Jangkrik 96 Perbankan Nasional BPMIGAS Employees
Maintenance Activities Reactivation of Suspended Jangkrik Field The Increase of National Competency Development
Wells Banking Role
D Kegiatan Produksi Minyak 32 E Lapangan Kepodang 98 C Realisasi Anggaran Dan 140
Dan Gas Bumi D Forum Operator KKKS 62 Kepodang Field D Pengelolaan SDM KKS 114 Belanja BPMIGAS
Production Activity of Oil Wilayah Kerja Eksplorasi PSC’s Human BPMIGAS’ Expenditure and
and Gas (FOKWE) F L apangan Terang-Sirasun- 100 Resource Management Budget Realization
PSC Contractors’ Forum for Batur
E Lifting Minyak Dan Gas 42 Exploration Working Area Terang-Sirasun-Batur Field E Pembangunan 120 D Upaya Perbaikan Pelaporan 142
Bumi (FOKWE) Berwawasan Lingkungan Keuangan
Oil and Gas Lifting G Proyek Senoro Donggi 102 Environment Based Effort to Improve Financial
E Kerjasama Dengan 66 Senoro Donggi Project Development Report
F Realisasi Investasi 48 Lembaga Lain
Investment Realization Partnership with Other H L apangan Gajah Baru, 104
Institutions Iguana, dan Naga
G Penerimaan Negara 50 Gajah Baru, Iguana, and
State Revenue F Sharing Knowledge 70 Naga Field
PROFESSIONAL
Bertindak sebagai seorang profesional yang berkomitmen tinggi
Act as a professional with strong commitment
RESPONSIV E
Cepat tanggap terhadap permintaan informasi dan penyelesaian masalah
Promptly responding to inquiries and resolving issues
DECISIV E
Berani mengambil resiko dengan didasari oleh perhitungan dan pertimbangan matang
sesuai kewenang yang dimiliki
Taking calculated risks within the authority
E THICS
Menjalankan bisnis dengan standar etika yang tinggi secara konsisten
Conducting business by following the highest ethical standards consistently
NATION FOCUSED
Memaksimalkan potensi dan kemampuan nasional
Maximizing national capacity and capability
TRUST WORTHY
Menjaga kredibilitas sehingga mendapatkan kepercayaan dari stakeholders
Maintaining credibility to earn the trust of stakeholders
Sambutan Kepala BPMIGAS Foreword from BPMIGAS Chairman 6 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 7
Ir. R. Priyono
Realisasi investasi tahun 2011 adalah The investment realization in
Kepala BPMIGAS 2011 was 116% from the first
BPMIGAS Chairman
116% dari rencana awal, atau 138% dari
stated plan or 138% from the
realisasi investasi tahun 2010. investment realization in 2010.
Dibutuhkan komitmen yang kuat untuk mencapai hasil maksimal. Sepanjang tahun 2011 BPMIGAS Strong commitment is needed to achieve a maximum result. During 2011, BPMIGAS was succeeded in
berhasil menggalang komitmen investasi para Kontraktor KKS untuk meningkatkan investasinya pada kegiatan raising investment commitment from PSC Contractors to increase their investment in upstream oil and gas
pengembangan dan produksi hulu migas. Realisasi investasi tahun 2011 adalah 116% dari rencana awal, atau development and production activity. The investment realization in 2011 was 116% from the first stated plan or
138% dari realisasi investasi tahun 2010. 138% from the investment realization in 2010.
Setidaknya terdapat 7 (tujuh) proyek utama yang dikembangkan untuk mendukung pencapaian target At least, there were 7 (seven) main projects developed to support production achievement target in 2011
produksi pada tahun 2011 dan tahun-tahun berikutnya. Antara lain, proyek pengembangan Lapangan gas Jambi and upcoming years. The development projects were Jambi Merang gas field in Jambi, field development of
Merang di Jambi, pengembangan Lapangan Betara Complex Development dan pengembangan Suban bypass. Betara Complex Development, and Suban Bypass development.
Melalui kegiatan pengawasan dan pengendalian yang efektif dan efisien, investasi yang ditanamkan Through effective and efficient monitoring as well as controlling activities, the investment could be doubled
dapat digandakan sehingga menghasilkan penerimaan Negara 110% dari target yang ditetapkan dalam APBN 2011. so that it delivered state revenue 0f 110% from the target set in The Indonesian Budget (APBN) in 2011.
Manfaat industri hulu migas tidak hanya kami persembahkan dalam bentuk penerimaan Negara semata, The benefit of upstream oil and gas industry fulfils larger needs instead of serving state revenue only. Through
tetapi juga melalui usaha pengembangan kegiatan penunjang hulu migas yang pada akhirnya memunculkan development effort of upstream oil and gas supporting activity, it leads to a larger multiplier effect. It was proven
multiplier effect yang lebih luas. Terbukti, usaha-usaha tersebut berhasil menumbuhkan potensi daerah dan that those efforts had successfully grown local and national potential that generated new working field.
nasional sehingga menciptakan lapangan kerja baru. The improvement of internal performance is continuously done as a way to support monitoring and controlling
Penyempurnaan kinerja internal terus menerus dilakukan agar dapat mendukung kegiatan pengawasan dan activity which becomes our main assignment. As a result, BPMIGAS has successfully received “Unqualified
pengendalian yang menjadi tugas pokok kami. Hasilnya, selama 3 (tiga) tahun berturut-turut BPMIGAS berhasil Opinion” assessment from The Audit Board of the Republic of Indonesia (BPK) for 3 (three) years in the row. This
mendapatkan penilaian Wajar Tanpa Pengecualian dari BPK. Pencapaian ini sangat membanggakan karena achievement was encouraging since it delivered certainty in efforts and works performed by BPMIGAS which
memberikan kepastian bahwa usaha dan karya yang kami lakukan, sesuai dengan nilai-nilai good corporate was in accordance to good corporate governance values in Indonesia.
governance yang dianut bangsa ini. BPMIGAS is continuously working closely with all stakeholders through effective communication and
BPMIGAS tetap berusaha bekerja erat dengan semua stakeholders, melalui komunikasi dan koordinasi yang coordination so that upstream oil and gas industry is able to fulfill the energy needs for nation and to support
efektif agar industri hulu migas dapat memenuhi kebutuhan energi yang dibutuhkan bangsa, untuk mendukung 6% growth annually.
pertumbuhan 6% per tahun. Moreover, upon the celebrated achievement in these years, we humbly wish that we may perform better
Terlebih, dengan pencapaian yang gemilang di tahun-tahun yang lalu, kami berharap untuk dapat bekerja lebih in the future in answering the upcoming challenges in upstream oil and gas industry. To achieve the goals,
baik dalam menghadapi tantangan di industri hulu migas di masa yang akan datang. Untuk itu, BPMIGAS berharap BPMIGAS wishes a good blessing and support from society to conduct this honorable task.
doa dan dukungan masyarakat luas dalam menjalankan tugas ini.
Wassalamuallaikum Wr.Wb
Wassalamualaikum Wr.Wb. R. Priyono
R. Priyono
8 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 9
Ringkasan Laporan Besaran cost recovery pada tahun 2011 adalah The amount of cost recovery
in 2011 was US$15.34 billion,
Tahunan 2011 US$15,34 miliar, lebih tinggi dari realisasi
higher than the realization in
tahun 2010 sebesar US$11,03 miliar. 2012 for US$11.03 billion.
Pencapaian kinerja industri hulu migas merupakan Achievement of performance in upstream oil and 3. Realisasi lifting minyak bumi sebesar 899 ribu 3. Realization of oil lifting for 899 thousand BOPD
bentuk tanggung jawab sektor ini kepada bangsa dan gas industry is a part of the sector’s responsibility BOPD atau 95% dari target APBN-P tahun 2011. or 95% from the target set in The Indonesian
negara. Oleh karena itu, kami selalu berusaha mencapai to people and nation. Therefore, we always strive Lifting gas bumi sebesar 7.345 BBTUD, di mana Revised Budget (APBN-P) in 2011. Gas lifting is
prestasi terbaik. Kendati tantangan yang dihadapi to achieve the best performance. Although the sebesar 43,85% gas yang dilifting, atau sebanyak 7,345 BBTUD, in which 43.85% of lifting gas or
pada tahun 2011 lebih banyak dibanding tahun- challenges faced in 2011 were numerous compare 3.177,17 BBTUD digunakan untuk memenuhi 3,177.17 BBTUD is allocated to serve domestic
tahun sebelumnya, namun sektor hulu migas tetap to the previous years, upstream oil and gas sector kebutuhan domestik. demand.
memberikan kontribusi maksimal, yang diperlihatkan commits to contribute optimally as presented through 4. BPMIGAS bersama pemerintah juga telah berhasil 4. BPMIGAS together with Government succeeded
melalui peningkatan pendapatan negara, peningkatan the increase of state revenue, increase of domestic meningkatkan jumlah wilayah kerja industri hulu in increasing the number of working areas in
alokasi gas domestik, peningkatan investasi serta gas allocation, increase of investment, and increase migas. Sepanjang tahun 2011 terdapat penambahan upstream oil and gas industry. During 2011, there
peningkatan kegiatan untuk menumbuhkan sektor of activity that leads to the growth of other sectors. 45 wilayah kerja baru migas dan CBM. Dengan were 45 new additional working areas and CMB.
lainnya. Secara rinci pencapaian kinerja tahun 2011 Achievement of performance in 2011 is explained in adanya penambahan tersebut, jumlah kegiatan With the addition, the number of exploration activity
adalah sebagai berikut: details as follows: eksplorasi juga meningkat dari 87 kegiatan di tahun was also increased from 87 activities in 2010 to
1. Berhasil menyumbangkan penerimaan negara 1. Successful in contributing state revenue for 2010 menjadi 103 kegiatan (termasuk CBM) di tahun 103 activities (including CBM) in 2011. Overall, in
sebesar US$35,79 miliar atau 110% dari target US35.79 billion or 110% from the target set in 2011. Secara keseluruhan, pada akhir tahun 2011 the end of 2011, the number of working areas were
APBN. Pencapaian ini lebih besar 35% dari tahun The Indonesian Budget (APBN). The achievement jumlah wilayah kerja sebanyak 287 WK, yang terdiri 287 working areas consisted of 73 working areas
2010 sebesar US$26,49 miliar. Selain dipengaruhi is 35% larger from 2012 for US$26.49 billion. dari 73 WK termasuk katagori produksi, 42 WK including production category, 42 CBM working
oleh realisasi harga minyak dunia yang rata-rata Besides being influenced by the realization of CBM, 162 WK eksplorasi serta 10 WK dalam proses areas, 162 exploration working areas, and 10
mencapai US$111 per barel (lebih tinggi dari patokan world oil price that reached US$111 per barrel in terminasi karena tidak dapat memenuhi komitmen working areas are underway a termination process
APBN sebesar US$95 per barel), pencapaian average (higher than fixation of prices set by The yang telah disetujui. due to failure in fulfilling the agreed commitment.
ini juga merupakan hasil maksimalisasi kegiatan Indonesian Budget (APBN) for US$95 per barrel),
hulu gas. the achievement is also the maximum result of
2. Secara kumulatif, realisasi produksi sebesar upstream oil and gas activity. Berhasil menyumbangkan peneri-
2,40 juta barel oil ekuivalen per hari (BOEPD) atau 2. Cumulatively, production realization was 2.40
maan negara sebesar US$35,79
turun 4,82% dibandingkan realisasi produksi tahun million Barrel of Oil Equivalent Per Day (BOEPD)
2010 sebesar 2,52 juta BOEPD. Penurunan produksi or 4.82% decreased compare to production miliar atau 110% dari target APBN.
utamanya disebabkan oleh penurunan produksi realization in 2010 which was 2.52 million BOEPD. Pencapaian ini lebih besar 35% dari
dari 3 Kontraktor KKS besar yakni Total E&P The production decrease was mainly caused
tahun 2010 sebesar US$26,49 miliar.
Indonesie, Chevron Pacific Indonesia dan Pertamina by 3 large PSC Contractors which were Total
EP. Penurunan produksi tersebut lebih besar E&P Indonesie, Chevron Pacific Indonesia dan Successful in contributing state revenue for US35.79
dibanding peningkatan produksi oleh beberapa Pertamina EP. The production decrease of those billion or 110% from the target set in The Indonesian
Kontraktor KKS. 3 PSC Contractors was larger than the production Budget (APBN). The achievement is 35% larger from
increase by several PSC Contractors. 2012 for US$26.49 billion.
10 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 11
5. Realisasi investasi industri hulu migas meningkat 5. Realization of investment in upstream oil and gas 9. BPMIGAS juga meningkatkan usahanya untuk 9. BPMIGAS also increases the effort to support
dari tahun ke tahun. Pada tahun 2011, investasi industry increased every year. In 2011, investment mendorong pengembangan perbankan nasional, national banking development, through the utility of
sektor hulu migas sebesar US$14,02 miliar, lebih in upstream oil and gas sector was US$14.02 melalui pemanfaatan jasa kegiatan transaksi transaction service activity of goods and services
tinggi dari realisasi tahun 2010 sebesar US$11,03 billion, higher than the realization in 2010 which pengadaan barang dan jasa industri hulu migas procurement in upstream oil and gas industry as
miliar. Investasi tersebut digunakan untuk membiayai was US$11.03 billion. The investment was serta penyimpanan dana Abandonment and Site well as fund Abandonment and Site Restoration
kegiatan produksi sebesar US$9,16 miliar, untuk allocated to fund production activity for US$9.16 Restoration (ASR). Nilai transaksi yang dilakukan (ASR). The transaction value done through State-
kegiatan pengembangan sebesar US$3,14 miliar, billion, expansion activity for US$3.14 billion, melalui bank BUMN (Bank Mandiri, BRI dan BNI) Owned Enterprises (BUMN) banks (Mandiri, BRI,
administrasi US$958 juta, dan membiayai kegiatan administration for US$958 million, and exploration periode 2009 sampai akhir tahun 2011 telah and BNI) in period of 2009 to the end of 2011 has
eksplorasi US$718 juta. activity for US$718 million. mencapai US$14 miliar. Sementara besaran dana reached US$14 billion. Meanwhile, the amount of
6. Terdapat 7 (tujuh) proyek yang berhasil onstream 6. There were 7 projects that were successfully ASR yang disimpan di bank nasional hingga akhir ASR fund saved in national bank until the end of
pada tahun 2011, dan menghasilkan tambahan launched on-stream in 2011 and produced an tahun 2011 telah mencapai US$232 juta. 2011 has reached US$232 million.
produksi sekitar 800 MMSCFD gas dan 15.000 additional production for about 800 MMSCFD of 10. BPMIGAS juga memaksimalkan penggunaan produk 10. BPMIGAS also maximizes the utility of local
BOPD minyak. Proyek-proyek tersebut adalah gas and 15.000 BOPD of oil. The projects were barang dan jasa dalam negeri untuk menunjang goods and services to support the development
Jambi Merang (oleh JOB Talisman), Betara Jambi Merang (by JOB Talisman), Betara Complex pengembangan industri penunjang hulu migas. of upstream oil and gas supporting industry. The
Complex Development (BCD)-4 (oleh Petrochina Development (BCD)-4 (by Petrochina Jabung), Tolok ukur keberhasilan usaha tersebut diukur success measurement of the effort is assessed
Jabung), Suban Bypass (oleh COPI), Dayung Early Suban Bypass (by COPI), Dayung Early Compression melalui penggunaan Tingkat Kandungan Dalam through the utility of Local Content (TKDN) based
Compression (oleh COPI), Ujung Pangkah (oleh (by COPI), Ujung Pangkah (by Hess), dan Peciko-7A Negeri (TKDN) berdasarkan standar Departemen on the standard of Industrial Department. In 2011,
Hess), dan Peciko-7A (oleh Total Indonesie). (by Total Indonesia). Perindustrian. Pada tahun 2011, nilai komitmen commitment value of goods and services PSC
7. Untuk efisiensi biaya, BPMIGAS mengkoordinir 7. For cost efficiency, BPMIGAS coordinates PSC pengadaan barang dan jasa Kontraktor KKS adalah Contractors was US$11.81 billion. In details, the
Kontraktor KKS untuk melakukan upaya Contractors to conduct efficiency effort through sebesar US$11,81 miliar. Secara rinci, penggunaan utility of Local Content (TKDN) for service activity
penghematan biaya melalui kegiatan pengadaan joint procurement in PSC Contractors’ environment komponen TKDN pada kegiatan jasa sebesar was US$8.10 billion, while Local Content for goods
bersama di lingkungan Kontraktor KKS dan and optimized inventory as well as assets. US$8,10 miliar sementara TKDN pengadaan barang procurement was US$3.70 billion.
optimalisasi inventori serta aset. Sepanjang tahun During 2011, this activity delivered efficiency for sebesar US$3,70 miliar.
2011, kegiatan ini menghasilkan penghematan US$123.12 million. Efforts to Increase Production
sebesar U$$123,12 juta. 8. For the first time, in 2011, upstream oil and gas Upaya Peningkatan Produksi To increase production, BPMIGAS does several
8. Untuk pertama kalinya, pada tahun 2011, industri industry received “Golden PROPER”, earned Untuk meningkatkan produksi, BPMIGAS innovations to be applied by PSC Contractors,
hulu migas memperoleh “PROPER Emas” yang by MEDCO Indonesia E&P from Ministry of melakukan berbagai terobosan yang dapat dilakukan which are:
didapatkan oleh MEDCO Indonesia E&P dari Environment of Republic Indonesia. The number Kontraktor KKS, antara lain: 1. To require Production PSC Contractors to
kementerian lingkungan hidup. Terjadi peningkatan of compliant rank achievement increased from 59 1. Mewajibkan Kontraktor KKS Produksi melakukan conduct EOR (Enhanced Oil Recovery) program,
jumlah perolehan peringkat taat dari 59 KKKS PSC Contractors in 2010 to 69 PSC Contractors in program EOR (Enhanced Oil Recovery), yaitu a technology for advance extraction by using
di tahun 2010 menjadi 69 KKKS di tahun 2011. 2011. Meanwhile, the incompliant rank decreased penerapan teknologi pengurasan lanjut dengan water injection, steam, chemical, gas, and
Sementara peringkat tidak taat berkurang dari 11 from 11 PSC Contractors in 2010 to 8 PSC menggunakan injeksi air, uap, bahan kimia, gas microbe. In 2011, some PSC Contractors have
KKKS di tahun 2010 menjadi 8 KKKS di tahun 2011. Contractors in 2011.
12 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 13
maupun mikroba. Pada tahun 2011, beberapa performed field test and some others have entered hal yang mencakup material, posisi dan kinerja the changing of equity and cash flow as well as
Kontraktor KKS telah melakukan uji lapangan, dan production phase. To accelerate, BPMIGAS also keuangan BPMGAS, perubahan ekuitas serta arus financial information of cooperation contract.
beberapa lainnya telah masuk pada tahap produksi. designs a proper procurement process to conduct kas dan informasi keuangan kontrak kerjasama. Hence, since 3 years in the row, BPMIGAS has
Agar dapat dilakukan percepatan, BPMIGAS juga the program. Dengan demikian, selama 3 (tiga) tahun berturut- received “Unqualified Opinion”.
mendisain proses pengadaan yang tepat untuk 2. To support the realization of exploration activity turut BPMIGAS telah berhasil mendapatkan 3. To implement KPI (Key Performance Indicator) as a
pelaksanaan program ini. especially in new working area through the penilaian WTP. way to measure field and individual performances.
2. Mendorong realisasi kegiatan eksplorasi terutama establishment of PSC Contractors’ Forum for 3. Menerapkan KPI (Key Performace Indicator) untuk The implementation of KPI is employed to ensure
di wilayah kerja baru, melalui pembentukan FOKWE Exploration Working Area (FOKWE). This forum is mengukur kinerja bidang dan individu. Pemberlakuan the process run based on good corporate
(Forum Operator KKKS Wilayah Kerja Eksplorasi). actively monitoring activity progress and problems KPI ini digunakan untuk memastikan proses telah governance and deliver the targeted result.
Forum ini secara aktif memantau progress kegiatan faced by Exploration PSC Contractors so that it sesuai dengan good corporate governance dan
dan permasalahan yang dihadapi KKKS eksplorasi helps to solve the problems. hasil sesuai dengan target yang ditetapkan.
sehingga dapat membantu pemecahan masalah.
Internal Performance Improvement Program
Program Perbaikan Kinerja Internal BPMIGAS is continuously conduct internal
BPMIGAS terus menerus juga melakukan perbaikan performance improvement. It aims to conduct
kinerja internal, agar dapat melakukan kegiatan effective and efficient monitoring as well as controlling
pengawasan dan pengendalian secara efektif dan efisien so that upstream oil and gas industry is able to
sehingga industri hulu migas dapat memberikan hasil deliver maximum result to people and nation.
maksimal pada bangsa dan Negara. Adapun perbaikan The improvement and results in 2011 are:
dan hasil yang telah dicapai pada tahun 2011 adalah: 1. To arrange Strategic Plan (RENSTRA) for 2011-
1. Menyusun RENSTRA (Rencana Strategis) tahun 2015 periods. The document contains BPMIGAS’
2011 - 2015. Dokumen ini berisi rencana kerja working plan to start the target set previously by
BPMIGAS untuk mengawal target yang telah government, which is to achieve production target
ditetapkan pemerintah, antara lain untuk mencapai of oil and gas. The document delivers programs
target produksi minyak dan gas bumi. Dokumen that must be implemented by BPMIGAS so that
tersebut merinci program-program yang harus the stated target is accomplished in effective and
dilaksanakan BPMIGAS, sehingga tujuan yang telah efficient ways.
ditetapkan dapat dicapai secara efektif dan efisien. 2. To improve reporting and monitoring, so that in
2. Menyempurnakan pelaporan dan pengawasan, 2011, BPMIGAS is able to receive “Unqualified
sehingga pada tahun 2011 BPMIGAS berhasil Opinion” from The Audit Board of the Republic of
mendapatkan kembali penilaian “Wajar Tanpa Indonesia (BPK). This assessment is achieved by
Pengecualian” (WTP) dari BPK-RI. Penilaian ini considering several points that involve material,
diperoleh dengan mempertimbangkan berbagai BPMIGAS’ position and financial performance,
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 14 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 15
01 Potret Kerja
BPMIGAS
Work Performance of BPMIGAS
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 16 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 17
A. Wilayah Kerja Hulu Salah satu usaha yang dilakukan pemerintah Government delivers
expansion efforts as one of the
Migas untuk meningkatkan produksi pada tahun-
ways to increase production.
tahun mendatang adalah melakukan usaha- The expansion is implemented
usaha ekstensifikasi, yaitu menambah jumlah through the addition of new
working areas.
Upstream Oil and Gas Working Area wilayah kerja baru.
Penambahan Wilayah Kerja Baru Addition of New Working Area pemerintah juga menyetujui pengembalian 4 (empat) working area, Yapen working area, Asmat working
Salah satu cara yang dilakukan pemerintah untuk Government delivers expansion efforts as one wilayah kerja oleh investor (total relinquishment) yaitu area, East Bawean I working area. Additionally, 10
meningkatkan produksi adalah melakukan usaha- of the ways to increase production. The expansion wilayah kerja Karana, wilayah kerja Yapen, wilayah working areas are now underway the relinquishment
usaha ekstensifikasi, yaitu menambah jumlah is implemented through the addition of new working kerja Asmat, dan wilayah kerja East Bawean I serta process. Those working areas were retrieved due to
wilayah kerja baru. Sepanjang tahun 2011 dilakukan areas. During 2011, there were three procurement sedang memroses pengembalian 10 (sepuluh) wilayah incompetency in meeting the stated commitment or
3 (tiga) kali pengumuman pemenang tender wilayah announcements regarding the winner of new working kerja lainnya. Wilayah kerja tersebut dikembalikan failure in finding valuable reserves until the end of
kerja baru yang kemudian ditindaklanjuti dengan areas followed by the signing of PSC contract karena tidak dapat memenuhi komitmen pasti yang exploration timeline.
penandatanganan kontrak PSC oleh perusahaan by the winners and BPMIGAS in April, August, telah ditetapkan atau tidak memperoleh temuan Hence, at the end of 2011, there were 287 working
pemenang dan BPMIGAS, masing-masing dilakukan and December. cadangan yang dapat dikembangkan sampai dengan areas explained as follows:
pada bulan April, Agustus dan Desember. Through the expansion, Government has achieved berakhirnya masa eksplorasi.
Dari kegiatan tersebut, pemerintah berhasil 26 working areas of oil and gas, as well as 19 Coal Dari penambahan dan pengembalian wilayah
mendapatkan tambahan 26 wilayah kerja minyak dan Bed Mtethane (CBM) working areas. However, at the kerja tersebut, maka pada akhir tahun 2011 terdapat
gas bumi (MIGAS) serta 19 wilayah kerja Gas Metan same moment, government have agreed to proceed 287 wilayah kerja , dengan rincian sebagai berikut:
Batubara (GMB). Namun pada saat yang sama, total relinquishment by investors which were Karana
production
produksi
34
Produksi
Production
34 24 15 73
28 28
40 0 2 42
GMB
15 17 CBM
13
Exploration
Eksplorasi
5 Eksplorasi Aktif
49 82 31 162
1 Active Exploration
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Terminasi
Termination 1 5 4 10
Wilayah Kerja Eksplorasi
214
Wilayah Kerja Produksi
73
TOTAL 124 111 52 287
Exploration Working Area Production Working Area
Status: 31 Desember 2011
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 18 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 19
Wilayah Kerja Eksplorasi Exploration Working Areas Kendala utama yang dihadapi terkait dengan The prior issues behind the failure of commitment
Pada akhir tahun 2011, wilayah kerja eksplorasi At the end of 2011, exploration working areas masalah-masalah eksternal (42%), yaitu masalah sosial, were externals (42%) as follows, social issues, permit,
terdiri dari 42 wilayah kerja GMB, 162 wilayah kerja consist of 42 Coal Bed Methane (CBM) working areas, perizinan, dan tumpang tindah lahan. Hambatan lainnya and overlapping land. Some other barriers were
migas dan 10 wilayah kerja sedang dalam proses 162 oil and gas working areas. In addition, 10 working terkait dengan permasalahan internal Kontraktor KKS related to internal of PSC Contractors (Operatorship,
terminasi. Sebanyak 112 wilayah kerja di antaranya, areas are now underway a termination process. The (Operatorship, Finansial, Prioritas Holding, dll) (28%), Financial, Priority, Holding, et cetera) (28%), availability of
telah memasuki tahap evaluasi komitmen pasti karena 112 working areas have entered Firm Commitment masalah ketersediaan alat dan jasa penunjang operasi supporting instruments and service for operation (11%),
telah memiliki masa eksplorasi lebih dari 3 (tiga) tahun. evaluation stage since they have passed 3 year (11%), serta masalah kompleksitas subsurface (7%). as well as subsurface complexity issues (7%).
Mereka adalah wilayah-wilayah kerja yang kontraknya exploration phases. Those working areas belong to Untuk mempercepat upaya pemenuhan komitmen BPMIGAS established PSC Contractors’ Forum
ditandatangani antara tahun 2002 - 2008. groups which contracts signed in 2002 until 2008. pasti, pada tahun 2011 BPMIGAS membentuk Forum for Exploration Working Area (FOKWE), a forum for
Hasil evaluasi menunjukkan, pemenuhan The evaluation showed that there were some Operator Kontraktor KKS Wilayah Kerja Eksplorasi PSC Contractors to exchange information and permit
komitmen pasti menemui berbagai gangguan challenges in fulfilling Firm Commitment in the field (FOKWE) yaitu forum bagi Kontraktor KKS Eksplorasi process acceleration in 2011, as a way to accelerate
di lapangan. Dari 112 wilayah kerja Eksplorasi yang every year. From 112 exploration working areas that untuk bertukar informasi dan percepatan proses efforts to conduct Firm Commitment. This forum enables
berada pada tahap pemenuhan pasti 3 tahun pertama, should have been accomplished the first 3-year perizinan. Melalui koordinasi-koordinasi yang dilakukan, Exploration PSC Contractor to exchange information
jumlah wilayah kerja yang dapat memenuhi komitmen commitment, there were only 31% (35 working areas) realisasi komitmen pasti pada tahun 2011 menunjukkan and accelerate the permit process. Due to coordination,
pasti hanya terdapat 35 wilayah kerja (31%), sementara succeeded, while 60% (67 working areas) failed to peningkatan berarti. the realization of Firm Commitment showed significant
67 wilayah kerja (60%) tidak dapat memenuhi komitmen meet the commitment, and 9% (10 working areas) improvement in 2011.
pasti dan 10 wilayah kerja (9%) lainnya diusulkan untuk suggested for termination due to failurte to meet the
diterminasi karena tidak dapat memenuhi komitmen stated working timeline. Perkembangan Pemenuhan Komitmen Pasti I Kontraktor KKS Eksplorasi Wilayah Kerja Memenuhi Komitmen Pasti
pada waktu yang ditetapkan. The Completion of Firm Commitment I Development of Exploration PSC Contractors Working Area That Fulfilled Firm Commitment
Proses Pengadaan 7WK 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Procurement Process (6%)
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 20 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 21
B. Kegiatan Explorasi Besar anggaran eksplorasi yang disetujui The approved exploration
budget was US$169.5 million
adalah US$169,5 juta, di tmana sebesar 91,5%
which 91.5% or about US$155
atau sekitar US$155 juta digunakan untuk million was employed to
mendukung studi G&G, sementara 8,5% support G&G study, while
8.5% (or around US$14.4
Exploration Activity (atau sekitar US$14,4 juta) digunakan untuk
million) was allocated to
mendukung kegiatan TSA. support the TSA program.
Terkait usaha ekstensifikasi untuk peningkatan In relation to expansion efforts to increase Hasil studi G&G dan TSA tahun 2011 menunjukkan The result of G&G study and TSA in 2011 showed
produksi, BPMIGAS juga mendorong Kontraktor production, BPMIGAS encouraged PSC Contractors keberhasilan sebagai berikut: significant achievement as follows:
KKS untuk melakukan kegiatan eksplorasi, baik to perform exploration in both exploration working • Jumlah Prospek naik menjadi 1.285 struktur, • The number of prospect has risen to 1,285 structures
di wilayah kerja eksplorasi maupun wilayah kerja area and production working area. The activity in this baik yang berasal dari Lead maupun struktur baru. from Lead to the new one.
produksi. Kegiatan yang dilakukan pada tahap ini stage involved geophysics (through 2D seismic survey • Faktor resiko eksplorasi menurun dan nilai Geological • Exploration risk factors decreased, while Geological
mencakup kegiatan geofisika (melalui survei seismik and 3D seismic survey), exploration drilling, coring, Chance Factor (GCF) meningkat. Chance Factors (GCF) has risen.
2D dan seismik 3D), pengeboran eksplorasi, coring and production test. Thus, in particular to the CBM
dan test produksi. Khusus untuk wilayah kerja CBM, working area, the seismic activity was combined with Peningkatan jumlah studi Geologi, Geofisika, The increasing number of Geology, Geophysics,
rangkaian kegiatan seismic ditambah dengan kegiatan CBM drilling and dewatering. dan Reservoar (GGR) yang dilakukan antara tahun and Reservoir (GGR) study in 2008 to 2011, showed
pengeboran CBM dan dewatering. Generally, the implementation of exploration 2008 hingga 2011 menunjukkan bahwa masih banyak there was many promising potential in exploring oil and
Secara umum pelaksanaan kegiatan eksplorasi activity has not reached the targeted goal as the potensi pada mengeksploitasi lapangan-lapangan gas fields which was able to be exploited due to the
belum mencapai target yang ditetapkan, seperti previous implementation years ago. The general migas yang dapat dieksploitasi karena dengan adanya application of new methods.
realisasi kegiatan sejenis beberapa tahun belakangan barriers were still related to land provision, inadequate metode-metode baru.
ini. Masalah umum yang dihadapi masih berkutat pada permit, field activity of PSC Contractors, procurement,
pengadaan tanah, belum adanya izin lengkap untuk and internal issues in PSC Contractors.
Kontraktor KKS melakukan kegiatan di lapangan sampai Realisasi Study G&G dan TSA
masalah pengadaan dan internal di Kontraktor KKS. G&G Study dan TSA G&G Study and TSA Realization
The implementation of Geology and Geophysics
Studi G&G dan TSA Study (G&G) and Technical Assistance from Abroad
400 1400
Pelaksanaan Studi Geologi dan Geofisika (G&G) (TSA) is based on the approval in Authorization for
350 1300
dan Technical Assistance from Aboard (TSA) didasarkan Expenditure-AFE. In 2011, 375 AFE have been approved
pada persetujuan terhadap otorisasi expenditure to support G&G Study and 66 AFE to support TSA in 300 1263 1285
1200
Struktur Structure
(Authorization for Expenditure-AFE). Tahun 2011 telah exploration working areas. The approved budget was
Jumlah Amount
2009
86
2010
19
104 Realisasi Survei Seismik Seismik 2D (Km) Seismik 3D (Km2)
2011
9 Seismic Survey Realization 2D Seismic (Km) 3D Seismic (Km2)
115
0 20 40 60 80 100 120 140
17.541
12.245 12.538
Masih banyak potensi pada lapangan 7.326 7.411 8.064
4.328
migas yang dapat dieksploitasi
seiring adanya metode-metode baru.
There was many promising potential in exploring oil
and gas fields which was able to be exploited due to 2007 2008 2009 2010 2011
the application of new methods.
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 26 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 27
Beberapa kegiatan batal dilakukan karena Some activities were cancelled due to social issues Oil (million barrel) 4.039,60 3.962,60 7.732,20
gangguan sosial seperti terjadi di Kontraktor KKS as the one happened in PSC Contractor PT CPI.
PT. CPI yaitu pengeboran sebagian sumur Kotabatak The well drilling in some Kotabatak wells in Rindu Area-6 Gas (TSCF) 104,71 48,18 152,89
serta sebagian pengeboran sumur di Rindu Area-6 faced overlapping land issue with local palm plantation.
yang mengalami kendala tumpang tindih dengan lahan Another PSC Contractor, PT Odira Karang Agung, also Status: 1 Januari 2011
sawit. Gangguan juga dialami Kontraktor KKS PT. Odira had a challenge in drill exploration due to land acquisition
Karang Agung yang sedang membor sumur Odira karena permit with local government.
pengadaan lahannya terkendala perijinan PEMDA. The success ratio of exploration drilling was relatively
Penemuan Cadangan Discovery Of Reserve
Success ratio pengeboran eksplorasi cukup significant that reached 54%. This number was higher
Kegiatan pengeboran sumur-sumur eksplorasi di Exploration drilling wells in exploration working
menggembirakan, yaitu 54% success ratio ini lebih tinggi than the world’s average value that was only 40%. In
wilayah kerja eksplorasi dan produksi telah menemukan area and production have found prospect of natural oil
dari rata-rata dunia yang hanya mencapai 40%. Pada 2011, there were 9 dry hole wells from 103 drilled wells.
prospek cadangan minyak dan gas bumi dari 31 sumur. and gas from 31 wells. The contingent resources found
tahun 2011, hanya terdapat 9 sumur dry hole dari 103 Due to this obstacle, the investor’s financial loss was
Sumber daya (contingent resources) yang ditemukan were 370.44 million barrels of oil and 5,028.26 billion
sumur yang dibor. Kerugian di pihak investor dapat akibat US$443 million.
sebesar 370,44 juta barel minyak dan 5.028,26 miliar cubic feet of gas or equivalent to 1,200.74 million Barrel
dry hole sebesar US$443 juta.
kaki kubik gas, atau setara dengan 1.200,74 juta Barrel of Oil Equivalent (BOE). As a note, in 2011, Indonesia’s
of Oil Equivalent (BOE). Sebagai catatan, pada tahun oil reserve discovery was 140 million barrels of oil and
Kegiatan Eksplorasi Rencana Realisasi 2010, temuan cadangan minyak Indonesia adalah 140 2,095 billion cubic feet per day of gas or equivalent to
Exploration Activity Plan Realization
juta barel minyak dan 2.095 miliar kaki kubik gas bumi 490 million BOE.
200 atau setara dengan 490 juta BOE. The discovery of oil reserve in 2001 was higher
180 190 Temuan cadangan minyak tahun 2011 lebih tinggi than the previous finding in 2010. Hence, the Ratio
160 dari penemuan tahun 2010 sehingga Ratio Recovery Recovery Replacement (RRR) rose from 40% to 60%.
Sumur Well
140
Replacement (RRR) meningkat dari 40% menjadi However, the number was not completely satisfying
120
126
100
121 60%. Namun hasil tersebut belum menggembirakan since 1 barrel of oil production only replaced 0.6 barrel
113 114 103
102
80 91 86 90 karena berarti setiap produksi 1 barel minyak hanya of oil. Ideally, 1 barrel of oil production was replaceable
73 80 80
60 76 82
60
70
61
digantikan oleh 0,6 barel minyak. Idealnya produksi 1 by 1 barrel of oil at the minimum from a reserve
40
barel minyak tergantikan oleh penemuan cadangan discovery derived from exploration activity.
20
0 dari kegiatan eksplorasi minimal 1 barel minyak.
2003 2004 2005 2006 2007 2008 2009 2010 2011
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 28 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 29
C. Kegiatan Pengembangan Dan Untuk mendukung produksi pada To support the upcoming
production on 2011, BPMIGAS
Pemeliharaan Sumur tahun-tahun mendatang, pada tahun 2011
has approved 32 Plans of
BPMIGAS telah menyetujui 32 dokumen Development (POD) from
pengembangan lapangan ( Plan of PSC Contractors.
Well Development and Maintenance Activities Development - POD) dari Kontraktor KKS.
Rencana Pengembangan Lapangan Field Development Plan Pemboran Sumur Produksi & Workover Drilling of Production Wells and Workover
Untuk mendukung produksi pada tahun-tahun In order to support production in the upcoming Untuk menekan laju penurunan produksi alamiah To stall natural decreasing rate in the productive
mendatang, pada tahun 2011 BPMIGAS menerima 41 years, in 2011, BPMIGAS received 41 suggestions for pada lapangan-lapangan yang telah diproduksikan, fields, PSC Contractors performed additional well
usulan pengembangan lapangan (Plan of Development - Plan of Development (POD) from PSC Contractors. Kontraktor KKS melakukan pengeboran sumur drilling (infill well) and well maintenance. In 2011, the
POD) dari Kontraktor KKS. Dari evaluasi yang dilakukan Based on the evaluation performed by BPMIGAS, 32 tambahan (sumur infill/sisipan) serta pemeliharaan number of exploitation well drilling activity was 901
BPMIGAS, sebanyak 32 dokumen telah mendapat documents have been approved in which 4 of them sumur. Pada tahun 2011 jumlah kegiatan pemboran wells or 100.7% of the drill activity as planned in that
persetujuan, 4 (empat) di antaranya merupakan POD-I, were POD-I for development of Jangkrik field by ENI sumur eksploitasi sebanyak 901 sumur atau 100,7% year which was 895 wells. High realization of drilling
yaitu untuk pengembangan Lapangan Jangkrik oleh Muara Bakau, Jambu Aye Utara by ENI (Krueng Mane), dari rencana kegiatan pemboran tahun 2011 sebanyak was achieved since the activity did not require any
ENI Muara Bakau, Lapangan Jambu Aye Utara oleh Ande-Ande Lumut field by Genting Oil (Northwest 895 sumur. Realisasi kegiatan pemboran yang tinggi permit and the supporting field was ready. Besides,
Eni (Krueng Mane), Lapangan Ande-Ande Lumut oleh Natuna), and Ridho field by Odira Energy Karang dapat dicapai karena kegiatan yang dilakukan tidak the activity was zero failure risk.
Genting Oil (Northwest Natuna), dan Lapangan Ridho Agung. Meanwhile, 9 documents are now underway membutuhkan kegiatan perizinan dan telah memiliki
oleh Odira Energy Karang Agung. Sementara itu juga approval process. dukungan lahan yang dibutuhkan. Selain itu, kegiatan
terdapat 9 (sembilan) dokumen yang masih dalam The total approved budget for field development in tersebut tidak memiliki risiko kegagalan.
proses persetujuan. 2011 was approximately US$16.6 billion, in which the
Seluruh biaya yang disetujui untuk pengembangan 54.9% was allocated for investment budget, the 40.4%
lapangan tahun 2011 sekitar US$16,6 miliar, sebesar for operation budget, and 4.7% for Abandonment and
54,9% digunakan untuk biaya investasi, 40,4% untuk Site Restoration (ASR).
biaya operasional, dan 4,7% untuk Abandonment and The approval process of POD Jangkrik field in
Biaya Pengembangan Menurut POD 2011
Site Restoration (ASR). November 29, 2011 was noted as the fastest one. Development Fund Based on POD 2011
Proses persetujuan POD Lapangan Jangkrik yang The approval only required 16 active working days
telah disetujui tanggal 29 November 2011, merupakan and 2 month approval process in Ministry of Energy
POD-I tercepat, diproses di BPMIGAS selama 16 hari and Mineral Resources Republic. The data completion
9.197,31
kerja dan proses persetujuan di Kementrian ESDM kurang during the evaluation was the key reason behind the Investasi
Investment
dari 2 (dua) bulan karena semua data yang dibutuhkan accelerated approval process. The gas field, located
pada proses evaluasi telah tersedia. Direncanakan in Makasar Strait, is expected to spud in 2015 and
lapangan gas yang terletak di Selat Makasar ini dapat to contribute production as much as 740 thousand Abandonment 791,13
diproduksikan pada tahun 2015 dan dapat menambah barrels condensate and 912.73 BFC gas.
produksi sebesar 740 ribu barel kondensat dan 912,73 OPEX 6.779,15
BCF gas.
Realisasi Kegiatan Pemboran Pengembangan Target & Realisasi Workover 2011 Target & Realisasi Well Service 2011
Rencana Realisasi
Development of Drilling Activity Realization Plan Realization 2011 Workover Target & Realisation 2011 Well Service Target & Realisation
933
703 sumur
well 13.927 sumur
well
Jumlah Sumur Number of Well
1000
970
898 895
761
750
602
1172
Untuk meningkatkan produksi, BPMIGAS dan As a way to increase production, BPMIGAS and
599
901
911
846 Kontraktor KKS juga melakukan serangkaian kegiatan PSC Contractors conducted some out of the box
821
500
yang sifatnya out of the box. Dari kegiatan-kegiatan activities. Through the activities, natural decreasing
678
672
568
tersebut, laju penurunan produksi alamiah yang dalam rate in which technically calculated as 12% per annually
442
250 perhitungan teknis seharusnya mencapai 12% per was able to be stalled to 4.8%.
tahun, dapat ditekan menjadi sebesar 4,8%.
Untuk menekan laju penurunan produksi In order to stall natural decreasing rate from Pada tahun 2011 jumlah kegiatan
alamiah dari sumur produksi, juga dilakukan kegiatan production wells, well maintenance was performed
pemboran sumur eksploitasi dari rencana
pemeliharaan sumur melalui kerja ulang (workover) dan through workover and well service. Workover realization
pemeliharaan sumur (well service). Realisasi kegiatan activity in 2011 involved 703 wells or 100.4% from sebanyak 901 sumur atau 100,7%.
workover tahun 2011 adalah 703 sumur atau 100,4% 700 wells as planned, while well maintenance activity
In 2011, the number of exploitation well drilling was
dari rencana 700 sumur, sementara realisasi kegiatan covered 13,297 wells or 75.5% from 17,619 wells as
901 wells or 100.7% as planned.
pemeliharaan sumur mencakup 13.297 sumur atau planned.
75,5% dari rencana 17.619 sumur.
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 32 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 33
D. Kegiatan Produksi Minyak Dan Pencapaian produksi tersebut didukung oleh The accomplishment
targeted production supported
of
Akibat adanya berbagai kendala, sepanjang tahun During the year of 2011, some PSC Contractors Tambahan produksi dari lapangan-lapangan The additional production from new sites
2011 sebagian Kontraktor KKS tidak dapat mencapai are not able to reach the designated oil and gas baru yang dioperasikan tahun 2011, tidak dapat which just operated in 2011 is not able to cover the
target produksi minyak dan gas bumi yang telah production quota due to several causes. The significant mengimbangi penurunan produksi alamiah tersebut. decline of natural decreasing rate. As the result,
ditetapkan. Penurunan produksi cukup signifikan terjadi declining production came from 3 (three) primary PSC Akibatnya secara kumulatif realisasi produksi sebesar accumulatively the product realization is 2.40 millions oil
di wilayah kerja yang dioperasikan oleh 3 (tiga) Kontraktor Contractors, which are Total E&P (10.7%), Chevron 2,40 juta barel oil ekuivalen per hari (BOEPD) atau turun equivalent per day (BOEPD) or declined 4.82% compare
KKS utama, yaitu Total E&P menyumbang 10,7% Pacific Indonesia 3.7%, and Pertamina EP (2.7%) 4,82% dibandingkan realisasi produksi tahun 2010 to product realization in 2010, which is 2.52 millions
penurunan, Chevron Pacific Indonesia menyumbang sebesar 2,52 juta BOEPD. Realisasi produksi tahun BOEPD. The realization of the product in 2011 is similar
3,7% dan Pertamina EP menyumbang 2,7%. 2011 sama dengan realisasi produksi pada tahun 2009. to the performance in 2009.
2.750.000
824.447
1.119.900
2.500.000 1.272.900 1.012.800 794.244
1.208.700 966.769 935.090
2.250.000 883.246 826.457
852.633
836.012
2.000.000
1.750.000
120.451
Juta Million
133.723 107.809
1.500.000 132.205 129.161 127.030 122.328 1.580.400
1.437.300 122.739 124.145
1.422.300 118.385 1.418.100 1.498.700
1.380.700 1.393.300 1.364.300
1.250.000 142.406 1.297.100 1.328.700
132.649
1.157.400 1.120.100
1.000.000
750.000
500.000
250.000
TOTAL 2.572.700 2.461.500 2.632.805 2.583.823 2.518.230 2.455.400 2.370.285 2.251.497 2.305.478 2.366.885 2.525.298 2.400.753
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 34 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 35
1.000.000
Ribu BOPD Thousand BOPD
750.000
500.000
250.000
Target APBN = 945 ribu BOPD Realisasi Produksi = 902 ribu BOPD
Target of Indonesian Budget = 945 thousand BOPD Production Realization = 902 thousand BOPD
Pencapaian produksi tersebut didukung oleh The production achievement has been supported by
kinerja 14 Kontraktor KKS yang dapat melebihi the performance of 14 PSC Contractors which are able to
target produksi APBN-P 2011 sehingga terdapat exceed the production target of The Indonesian Revised
penambahan produksi sebesar 6.562 BOPD. Delapan Budget (APBN-P) in 2011. Therefore, the additional
Kontraktor KKS penyumbang peningkatan produksi production is 6.562 BOPD. 8 (eight) PSC Contractors
terbesar adalah: PHE-ONWJ, HESS Pangkah, Exxon contributed to product exceed achievement are: PHE-
Mobil Oil, Medco Rimau, Medco S&S, JOB PT-Jambi ONWJ, HESS Pangkah, Exxon Mobil Oil, MedcoRimau,
Merang, CICO, dan PetroChina Bermuda. Medco S&S, JOB PT-Jambi Merang, CICO, and
PetroChina Bermuda.
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 36 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 37
11 KKKS Produsen Minyak Penyumbang Tambahan Produksi Terbesar Tahun 2011 10 KKKS Produsen Minyak Penyumbang Penurunan Produksi Terbesar Tahun 2011
11 Oil Producer PSC Contractors who Contribute to the Largest Additional Production in 2011 10 Oil Producer PSC Contractors who Contribute to the Largest Decrease Production in 2011
250,000 10,000
20,000 800
200,000 8,000
15,000 600
150,000 6,000
10,000 400
100,000 4,000
0 0 0 0
PHE-ONWJ
cico
pertamina
phe wmo
santos
medco rimau
medco s&s
petrochina
bermuda
hess
exxon mobil
job pt (jm)
premier oil
petrochina
bangko
job p-costa
Cpi
total ep
copi block b
cnooc
vico
emoi
chevron
makassar
Target Realisasi Selisih Selisih
2010 2011
Target Realization Deviation Deviation
Namun pada saat yang sama juga terdapat 34 However, at the same period, there are 34 PSC Tidak tercapainya target produksi, disebabkan oleh The inability to achieve the target was caused
Kontraktor KKS yang tidak dapat memenuhi target Contractors who were not able to meet the target masalah teknis dan non teknis. Masalah-masalah teknis by technical and non technical issues. The technical
APBN-P sehingga menyebabkan penurunan produksi from Indonesian Revised Budget (APBN-P) resulted antara lain: issues are :
sebesar 48.123 BOPD. Penurunan produksi terbesar in 48,123 BOEPD production decreasing rate. The • Adanya kerusakan pada fasilitas produksi seperti • The malfunction of production facility such as
terdapat pada: Santos Sampang (realisasi produksi highest production decreasing rate occurred in Santos kompresor, jaringan listrik, instrumen, artificial lift dan compressor, electricity, instruments, artificial
-42,0% dari target APBN-P), PHE WMO (-33,5%), Sampang (product realization -42.0% from the target pipa di beberapa Kontraktor KKS, elevator and the pipes in some PSC Contractors.
Chevron Makassar (-21,3%), Exxon Mobil Oil (-17,9%), of Indonesian Revised Budget (APBN-P)), PHE WMO • Kebocoran hose dan sistem mooring di beberapa • The leak of hose and mooring system in some PSC
CNOOC (-14,4%), Vico (-13,7%), TOTAL EP (-12,4%), (-33.5%), Chevron Makassar (-21.3%), Exxon Mobil Oil Kontraktor KKS antara lain: Star Energy, Camar, Contractors such as: Star Energy, Camar, Kangean,
COPI Block B (-10,4%), Pertamina EP (-4,0%) dan (-17.9%), CNOOC (-14.4%), Vico (-13.7%), TOTAL EP Kangean, dan Pertamina EP - TAC PAN dan Pertamina EP - TAC PAN.
PT.CPI (-3,7%). (-12.4%), COPI Block B (-10.4%), Pertamina EP (-4.0%) • Problem subsurface di wilayah kerja Total EP. • The subsurface problem in Total EP working area.
and PT.CPI (-3.7%).
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 38 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 39
Sementara masalah non teknis yang Non-technical issues which caused the decrease
Produksi Nasional Gas 2011
menyebabkan penurunan produksi antara lain: in production are:
2011 National Gas Production
• Mundurnya jadwal keputusan perpanjangan kontrak • The setback of the contract negotiation of
wilayah kerja Kodeco/PHE WMO. Kodeco/PHE WMO.
8.857
• Keterlambatan pengadaan peralatan penunjang • The delay of supporting production machine 10.000 8.415
8.070 7.962
produksi seperti terjadi di Jambi Merang procurement as happened in Jambi Merang 7.986 7.823 7.660
7.752 7.460
dan PT. SPE, dan PT. SPE. 7.500 7.283
MMSCFD
6.289
• Tidak adanya ijin transportasi seperti yang dialami • There was no transportations clearance as
oleh SPE dan Seleraya sehingga kegiatan produksi experienced by SPE and Seleraya, and as the result 5.000
terpaksa dihentikan. the production activities must be put on hold.
• Faktor cuaca (hujan terus menerus) yang • The weather obstacle (constant raining),
2.500
menyebabkan minyak dalam pipa membeku seperti which caused the pipe frozen as happened in CPI
yang terjadi di wilayah kerja CPI. working area.
• Kebakaran FSO Lentera Bangsa di CNOOC. • The fire accident of FSO Lentera Bangsa in CNOOC. 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Produksi dan Penyaluran Gas 2011 10 KKKS Produsen Gas Terbesar Tahun 2010 - 2011
Produksi Penyaluran
2011 Gas Production & Distribution Production Distribution 10 Largest Gas Producer PSC Contractors in 2010 - 2011
3000 300
10.000
2500 250
7.500
2000 200
MMSCFD
MMSCFD
MMSCFD
1500 150
5.000
1000 100
2.500
500 50
0 0
Total ep
copi grissik
phe wmo
star energy
chevron
makassar
emoi
copi block b
vico
pc. jabung
phe onwj
Jan’11 Feb’11 Mar’11 Apr’11 Mei’11 Jun’11 Jul’11 Agt’11 Sep’11 Oct’11 Nov’11 Des’11
Akibat gangguan tersebut, beberapa lapangan Due to the interferences, some working areas
tidak dapat memenuhi target APBN-P. Secara were not able to meet the target of The Indonesian
kumulatif, Terjadi penurunan produksi sebesar 621 Revised Budget (APBN-P). Accumulatively, there was 2010 2011
Selisih
Deviation
MMSCFD dibanding target APBN-P 2011. a decreasing production for 621 MMSCFD compare to
Sepuluh Kontraktor KKS penyumbang penurunan The Indonesian Revised Budget 2011.
produksi terbesar adalah Chevron Makassar (-29,6%), 10 (ten) PSC Contractors which contributed to
Star Energy (-26%), Exxon Mobil Oil (-22,2%), production decline are: Chevron Makassar (-29.6%),
PetroChina Jabung (-10,9%), TOTAL EP (-10,4%), VICO Star Energy (-26%), Exxon Mobil Oil (-22.2%),
(-11,1%), PHE ONWJ (-8,8%), PHE WMO (-7,3%), COPI PetroChina Jabung (-10.9%), TOTAL EP (-10.4%), VICO
Grissik (-6,0%) dan COPI Block B (-5,3%). (-11.1%), PHE ONWJ (-8.8%), PHE WMO (-7.3%), COPI
Grissik (-6.0%) dan COPI Block B (-5.3%).
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 42 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 43
E. Lifting Minyak Dan Volume gas yang digunakan untuk memenuhi Gas volume used to fulfil the
export commitment to several
Gas Bumi komitmen ekspor ke beberapa negara pembeli
buyer countries was 4,060,79
sebanyak 4.060,79 BBTUD atau 56,16% dari BBTUD or 56,16% from the
seluruh lifting gas. whole gas lifting.
Realisasi Produksi, Lifting dan Stok 2011 Produksi Liftting Total Stock
Realization of Production, Lifting and Stock in 2011 Production Lifting Total Stock
1.000.000 13.000.000
750.000 10.000.000
BOPD
BBLS
902.052,92
899.948,52
500.000 7.000.000
888.222
892.000
904.396
954.340
904.852
902.307
948.460
856.420
878.809
968.970
772.270
976.320
904.476
891.099
907.226
834.510
910.995
899.613
858.190
891.678
908.143
877.370
911.628
971.740
250.000 4.000.000
Jan’11 Feb’11 Mar’11 Apr’11 Mei’11 Jun’11 Jul’11 Agt’11 Sep’11 Oct’11 Nov’11 Des’11 Rata-rata
2011
Realisasi lifting minyak mentah periode Januari Lifting realization of crude oil from diekspor serta digunakan untuk mendukung operasi The allocated volume to meet the domestic
sampai Desember 2011 sebesar 899 ribu BOPD atau January - December 2011 was 899 thousands BOPD hulu migas. demand was 3,177.17 BBTUD, or 43.84% from total
95% dari target APBN-P 2011. Realisasi lifting yang lebih or 95% of The Indonesian Revised Budget (APBN-P). Volume yang dialokasikan untuk memenuhi lifting. The amount has been increased 200 % in the
rendah dari realisasi produksi disebabkan oleh cuaca This was caused by unsupportive weather in the end kebutuhan dalam negeri sebesar 3.177,17 BBTUD, atau last five years. At this point, gas was allocated for:
buruk pada akhir tahun sehingga kapal tidak dapat of the year so that the ship was not able to depart and sekitar 43,84% dari lifting. Dibanding volume gas dalam
mengangkut minyak. deliver oil. negeri 5 tahun lalu, besaran tersebut meningkat 200%. • Energy resources for industry is 1,318.67 BBTUD
Mayoritas lifting minyak mentah tahun 2011 The majority of crude oil lifting in 2011 was used to Saat ini gas dialokasikan untuk : (41.5%).
digunakan untuk memenuhi kebutuhan dalam negeri. meet domestic demand. The detail was 66% domestic • Sumber energi bagi industri sebesar 1.318,67 BBTUD • Power plant energy sources is 726.02 BBTUD
Secara rinci volume minyak mentah yang digunakan demand and 34% export demand, where the 28% (41,5%), (22.85%).
untuk memenuhi kebutuhan domestik mencapai 66%, was exported by PSC Contractors and the 6% by • Sumber energi pembangkit listrik sebesar 726,02 • The material for fertilizer and petrochemical is 649.53
sedangkan untuk ekspor sebesar 34% (sebesar 28% the government. sebesar BBTUD (22,85%), BBTUD (20.44%).
diekspor oleh Kontraktor KKS dan 6% diekspor oleh Gas lifting from January - December 2011 was • Bahan baku pabrik pupuk dan Petrokimia sebesar • Conducting oil lifting activities has 366.46 BBTUD
Pemerintah). 7,345 BBTUD, allocated to fulfill the domestic demand 649,53 BBTUD (20,44%), (11.53%)
Lifting gas bumi periode Januari sampai Desember and export, and also used to support upstream oil and • Melakukan lifting minyak sebesar 366,46 BBTUD • LPG conversion is 116.47 BBTUD (3.67%)
2011 sebesar 7.345 BBTUD, dialokasikan untuk gas operation. (11,53%) Conversion Program of LPG, 116.47 BBTUD
memenuhi kebutuhan konsumen dalam negeri dan • Program konversi LPG sebesar 116.47 BBTUD (3,67%). (3.67%).
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 44 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 45
Realisasi Lifting Gas Bumi 2011 Realisasi Lifting Gas (BBTUD) Target Lifting Gas APBN 2011 Harga Gas (Gross Price) Harga Gas APBN 2011
Gas Lifting Realization 2011 Gas Lifting Realization (BBTUD) Target of Gas Lifting in Indonesian Budget 2011 Gas Price (Gross Price) Gas Price in Indonesian Budget 2011
11,1
12.000 11,00
10,07 10,24
9,95 9,88
9,73 9,76 9,71
11.000 9,55 10,00
9,02
8,59
10.000 9,00
US$/mmbtu
BBTUD
8,22
9.000 8,00
8,12
7.000 6,00
6.000 5,00
6.856
8.400
6.624
7.306
7.533
7.305
7.636
7.278
7.231
7.426
7.218
7.419
7.152
5.000 4,00
Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nov Des Rata-rata 2011
Salah satu langkah penting yang dilakukan One of the important steps conducted by BPMIGAS Perjanjian Swap Gas juga dilakukan Kontraktor This swap gas agreement were also conducted
BPMIGAS untuk mendukung program pengurangan to support the subsidy reduction to PLN (state owned KKS Premier Oil Natuna Sea B.V. untuk Lapangan by PSC Contractor Premier Oil Natuna Sea B.V. for
subsidi ke PLN adalah melakukan insiatif Perjanjian company) is to initiate swap gas agreement – between Gajah Baru dengan melibatkan pembeli gas dari Gajah Baru area by involving gas purchasers from
Swap Gas – antara BPMIGAS, ConocoPhillips, JOB BPMIGAS, ConocoPhillips, JOB Pertamina-Talisman Indonesia dan Singapura yaitu ConocoPhillips, Indonesia and Singapore, which are ConocoPhillips,
Pertamina - Talisman Jambi Merang, PT PLN (Persero), Jambi Merang, PT PLN (Persero), PT PGN (Persero) Premier Oil, SembCorp Gas, Gas Supply Pte. Ltd., dan Premier Oil, SembCorp Gas, Gas Supply Pte. Ltd,
PT PGN (Persero) Tbk. dan PT Transportasi Gas Tbk and PT Transportasi Gas Indonesia – to heighten PLN. Dari perjanjian ini PLN memperoleh tambahan and PLN. From this agreement, PLN obtained extra
Indonesia – untuk menambah pasokan gas sebesar the gas supply for 65 BBTUD to Muara Tawar power pasokan gas sebesar 40 BBTUD. gas supply 40 BBTUD.
65 BBTUD bagi pembangkit Muara Tawar di Jawa plant in West Java. The agreement was signed on Sementara itu, volume gas yang digunakan Meanwhile, gas volume used to fulfill
Barat. Perjanjian ditandatangani tanggal 21 Oktober 21st October 2011 and start being delivered on 5th untuk memenuhi komitmen ekspor ke negara-negara export commitment to importer countries
2011 dan gas mulai dialirkan tanggal 5 Desember December 2011. From that scheme, there is a subsidy pembeli sebanyak 4.060,79 BBTUD atau 56,16% dari is 4,060.79 BBTUD or 56.16% from the whole gas
2011. Dari mekanisme tersebut, terdapat tambahan save US$1.3 million per day. seluruh lifting gas. Negara-negara pembeli utama lifting. The main importers are traditional purchasers
penghematan subsidi sebesar US$1,3 juta per hari. adalah pembeli tradisional (Jepang dan Korea), China, (Japan and Korea), China, and USA.
dan Amerika.
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 46 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 47
5000
200% dalam 5 tahun Tangguh 710 BBTUD
200% in 5 years
4500
20 Tangguh 846 BBTUD
4000
3500
15
3000
2500
TCF
10
2000
1500
5
1000
500
0 0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2003 2004 2005 2006 2007 2008 2009 2010 2011
Sejak tahun 2009, terjadi peningkatan alokasi gas Since 2009, there has been an increased gas
untuk ekspor seiring dengan mulai dioperasikannya allocation for export purpose as Kilang Tangguh has
Kilang Tangguh yang seluruh produksinya telah operated and the output is dedicated solely for export
didedikasikan untuk ekspor. Saat ini BPMIGAS purpose. At this period, BPMIGAS arranges for the half
mengatur agar sebagian gas Tangguh juga dapat of Tangguh gas can be employed to fulfill domestic
digunakan untuk memenuhi kebutuhan domestik demand without breaking previous signed contract in
tanpa melanggar kontrak-kontrak penjualan gas yang the beginning of 2000.
telah ditandatangani pada awal tahun 2000-an.
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 48 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 49
F. Realisasi Investasi
Investment Realization
Realisasi investasi industri hulu migas (expenditure) The Investment realization in upstream oil and gas Dari komposisi tersebut, terlihat bahwa 65% The composition showed that 65% of investment
meningkat dari tahun ke tahun. Pada tahun 2011, investasi industry (expenditure) increased every years. In 2011, investasi digunakan untuk membiayai kegiatan was allocated to fund production activity, while
sektor hulu migas sebesar US$14,02 miliar, lebih tinggi dari investment in upstream oil and gas sector was US$14.02 produksi, sementara kegiatan pengembangan development activity spent 22.3% of all the investment.
realisasi tahun 2010 sebesar US$11,03 miliar. Investasi billion, higher than the realization in 2010 which was menghabiskan 22,3% dari seluruh investasi. Dengan Therefore, around 88% from investment or around
tersebut digunakan untuk membiayai kegiatan produksi US$11.3 billion. The investment was allocated to fund demikian, sekitar 88% dari investasi atau sebesar US$12.3 billion were used to fund the production and
sebesar US$9,16 miliar, untuk kegiatan pengembangan production activity for US$9.16 billion, development US$12,3 miliar digunakan untuk membiayai kegiatan development activity. Compare to previous years, the
sebesar US$3,14 miliar, administrasi US$958 juta dan activity for US$3.14 billion, administration for US$958 produksi dan pengembangan. Dibanding tahun- investment portion for production and development
membiayai kegiatan eksplorasi US$718 juta. million, and exploration activity for US$718 million. tahun sebelumnya, porsi investasi untuk kegiatan activity tend to be stable, for example, the procentage
pengembangan dan produksi cenderung konstan, in 2010 was around 88.4% and around 86.5% in 2009.
sebagai contoh, tahun 2010 sebesar 88,4%, Some of the development project provisioned in
Realisasi Investasi Industri Hulu Migas sedangkan tahun 2009 sebesar 86,5%. Sebagian 2011 was mainly in the gas field development. As a
Realization of Investment of Upstream Oil and Gas Industry besar proyek pengembangan yang direalisasi tahun result, there are more gas production supply compare
2011 adalah pengembangan lapangan gas. Lapangan- to oil. Those development field are Jambi Merang
14.022 lapangan yang dikembangkan antara lain Lapangan field, Betara Complex Development Phase 4, Gajah
Jambi Merang, Betara Complex Development Phase Baru, APN E Gas Development PHE ONWJ and Ujung
719 4, Gajah Baru, APN E Gas Development PHE ONWJ, Pangkah Development Phase 2.
12.500 11.031
10.615 958 dan Ujung Pangkah Development Phase 2.
10.425 670
10.000 9.142 532 3.149
US$ Juta US$ Million
633 833
7.581 474 981
730
7.500 869 2.495
431
2.532 2.671
636 2.088
5000 2.088 9.196
5.711
7.033
88% dari investasi atau US$12,3 miliar
2500 4.639 6.579 6.391
digunakan untuk membiayai kegiatan
produksi dan pengembangan.
2006 2007 2008 2009 2010 2011 88% of the investment or US$12.3 billion was used to
fund the production and development activity.
Produksi Pengembangan Administrasi Eksplorasi
Production Development Administration Exploration
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 50 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 51
G. Penerimaan Negara Tahun 2011 industri hulu migas menghasilkan In 2011, upstream oil and
gas industry has achieved
penerimaan negara sebesar US$35,79 miliar
state revenue for US$35.79
atau 110% dari target APBN-P. billion or 110% from the target
of Indonesian Revised
Budget (APBN-P).
State Revenue
Pada tahun 2011, industri hulu migas berhasil In 2011, the state revenue from upstream oil and Peningkatan pendapatan industri hulu migas juga The increase of state revenue also profited PSC
membukukan Penerimaan Negara sebesar US$35,79 gas industry was US$35.79 billion or 110% from the dinikmati oleh Kontraktor KKS, sehingga Return on Contractors. Therefore, Return of Investment (ROI)
miliar, atau 110 % dari target APBN-P. Angka ini berarti target of The Indonesian Revised Budget (APBN-P). Investment Indonesia masih cukup menarik. Dalam 5 of Indonesia is still attractive. In the last 5 years,
35% lebih tinggi dari penerimaan tahun 2010 sebesar It means that it is 35% higher that the revenue in tahun terakhir, rata-rata Net Contractor Take sebesar the average Net Contractor Take is 16%, while the
US$26,49 miliar. Pencapaian ini tidak terlepas dari 2010, which is US$26.49 billion. This achievement is 16%, sementara Government Entitlement dijaga Government Entitlement is watched between 57%
beberapa usaha, antara lain memaksimalkan harga attributed also to some efforts, such as maximize the minimum 57% sampai 58%. until 58% at the minimum.
LNG di pasar spot dan meningkatkan harga gas di price of LNG in spot market and increase domestic Untuk memaksimalkan penerimaan negara, To maximize the state revenue, BPMIGAS also
dalam negeri yang masih terlalu rendah. price that is too low. BPMIGAS juga mendorong penggunaan Tingkat encourages the use of Local Content (TKDN) for at least
Kandungan Dalam Negeri (TKDN) minimal 60%. 60%. The supervision of commitment is conducted
Pengawasan terhadap pelaksanaan komitmen by the approval of AFE mechanism (Authorization for
tersebut dilakukan melalui mekanisme persetujuan Expenditure)
AFE (Authorization For Expenditure).
Penerimaan Negara dari Sektor Hulu Migas
Target APBN Realisasi
State Revenue from Upstream Oil and Gas Industry Target of Indonesian Budget Realization
60.000
30.000 35.798
107%
104% 26.497 35.302
50.000
25.000
32.406
26.060
30.699
19.104
20.000
9.512
10.000 7.608
9.657
5.694
10.000 6.204
9.339 11.763
5.000 8.998
8.710
2007 2008 2009 2010 2011 2007 2008 2009 2010 2011
01. Potret Kerja BPMIGAS 01. Work Performance of BPMIGAS 52 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 53
Penerimaan negara tahun 2011 menyumbangkan The state revenue in 2011 contributed 24% from
24% dari seluruh penerimaan APBN-P 2011. the whole reserve of The Indonesian Revised Budget
Secara prosentase penerimaan negara dari industri hulu (APBN-P). In percentage, the state revenue from
migas menurun dibanding tahun-tahun sebelumnya upstream oil and gas industry has decreased compare
yang berkisar antara 25% sampai 30%. Namun dalam to the previous years (25% - 30%). However, in a
tatanan nasional, hal tersebut menunjukkan kemajuan national order, it suggests a significant improvement
yang berarti, karena penerimaan negara tidak lagi since state revenue is not mainly focused on natural
ditumpukan pada penerimaan sumber daya alam resources but on firm increase of all sectors and taxes.
tetapi pada kuatnya pertumbuhan di semua sektor dan The lower percentage of contribution to The Indonesian
pajak. Semakin menurunnya prosentase kontribusi Budget (APBN) has proven that the upstream oil and
kepada APBN membuktikan bahwa industri hulu migas gas industry have been successfully become the
telah berhasil menjadi lokomotif ekonomi nasional. locomotive of national economy.
02 Upaya Peningkatan
Produksi
Efforts to Increase Production
02. Upaya Peningkatan Produksi 02. Efforts to Increase Production 56 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 57
Selama sepuluh tahun terakhir laju penurunan For the last 10 years, the oil and condensate Sepanjang tahun 2011 terdapat 7 proyek Onstream During 2011, there were 7 (seven) on-stream
cadangan terbukti minyak dan kondensat nasional national reserve decreasing rate is 92.5 million dan menghasilkan tambahan produksi sekitar 800 projects that contribute to additional production
sebesar 92.5 juta barel per tahun. Dengan kata lain, barrels per year. In the other words, the national oil MMSCFD gas dan 15.000 BOPD minyak. Namun in the amount of 800 MMSCFD gas and 15,000
dalam sepuluh tahun terakhir cadangan minyak dan and condensate reserve have lost 1 billion barrel in mengingat sebagian besar proyek onstream pada BOPD oil. However, since most of on-stream projects
kondensat nasional hilang sebesar 1 milyar barel. the last 10 years. The main reason behind this issue kuartal ketiga dan keempat, maka hanya memberikan are conducted in Q3 and Q4, they only contribute
Penyebab utama penurunan cadangan adalah is because most of the production fields have entered efek penambahan produksi rata-rata tahunan sekitar additional production rate of 200 MMSCFD and 5,000
sebagain besar lapangan yang ada sudah memasuki decreasing production phase. The reserve decline 200 MMSCFD dan 5.000 BOPD. BOPD per year.
masa penurunan produksi. Penurunan cadangan leads to decreasing production rate. Therefore, when
menyebabkan penurunan produksi. Apabila tidak there is no significant effort to be conducted, the
Proyek Onstream Tahun 2011
dilakukan usaha apapun, penurunan produksi alamiah natural decreasing rate is approximately 12% per year.
Onstream Project in 2011
berkisar 12% per tahun. To improve the production result, during 2011
Untuk meningkatkan produksi, sepanjang BPMIGAS has conducted several attempts. Some of
Proyek KKKS Onstream Produksi Puncak
tahun 2011 BPMIGAS melakukan berbagai upaya. the efforts delivered satisfying results in 2001. However, No.
Project PSC Contractors Onstream Production Peak
Sebagian hasil usaha yang dilakukan dapat dinikmati some others are underway working processes toward
pada tahun 2011, namun beberapa lainnya masih production improvement in the upcoming years. 125 MMSCFD
1 Jambi Merang JOB Talisman Q4
6000 BOPD
merupakan proses menuju peningkatan produksi pada
tahun-tahun mendatang.
17 MMSCFD
2 BCD 4 PetroChina Intl Jabung Q4
3000 BOPD
45 MMSCFD
3 Suban Bypass COPI Q3
460 BOPD
B. Kegiatan Enhanced Oil Untuk meningkatkan produksi nasional pada To increase national production
in the upcoming years, BPMIGAS
tahun-tahun mendatang, BPMIGAS telah
Recovery (EOR) has requested all Production
meminta semua Kontraktor KKS produksi PSC Contractors to include
memasukkan program implementasi EOR pada EOR program implementation
on work program and budget
EOR (Enhanced Oil Recovery) Activity program kerja dan anggaran (WP&B) 2012.
(WP&B) 2012.
Upaya lain yang sedang dilakukan untuk Another effort to increase the national production
Pelaksanaan Program EOR Tahun 2011
meningkatkan cadangan dan produksi nasional adalah and reserve is to optimize production for short terms EOR Program Implementation 2011
melakukan kegiatan optimasi produksi untuk jangka and to employ the Enhanced Oil Recovery technology
pendek dan penggunaan teknologi Enhanced Oil (EOR), a technology for advance extraction by using No. Methods PSC Field Average 2011
(BOPD)
Recovery (EOR) – suatu teknologi pengurasan lanjut water injection, steam, chemical, gas, and microbe for
yang menggunakan injeksi air, uap, bahan kimia, gas long term use. 1 Water Flood Chevron Bangko, Kota Batak, Bekasap, Telisa, Minas, 102.926
maupun mikroba – untuk jangka panjang. The potential to increase production through EOR Libo, Pungut
Potensi peningkatan produksi dari pelaksanaan activity is relatively significant. Based on the annual
2 Medco Kaji Semoga 2.969
kegiatan EOR cukup besar. Berdasarkan data laporan reserve report (per January 1, 2011), the Original Oil in
cadangan tahunan (per 1 Januari 2011), masih terdapat Place (OOIP) remains 49.5 billion barrel that is able to be 3 Pertamina EP Rantau, TL. Jimar, Tanjung, Benakat Timur, 29.079
sisa Original Oil in Place (OOIP) sebesar 49,5 miliar extracted by conducting EOR activity. In 2011, the EOR Benakat, Nglobo, Kawengan, Lirik, Kenali
barrel yang dapat diambil melalui kegiatan EOR. Pada application in some PSC Contractors contribute 332,944 Asam, Tempino, Talang Akar, Sopa, Sago, TT
tahun 2011, penerapan teknologi EOR pada sejumlah BOPD production or 40% of national production. Barat, Beringin dan Limau
Kontraktor KKS memberikan kontribusi produksi To increase the national production in the upcoming 4 Total E&P Handil 3.644
sebesar 332.944 BOPD atau sekitar 40% terhadap years, BPMIGAS has requested all Production PSC
produksi nasional. Contractors to include EOR implementation program 5 BOB PT BSP Zamrut, Pusaka, Beruk, Peudada dan Sabak 7.855
Untuk meningkatkan produksi nasional pada in working program and budget (WP&B) 2012. The 6 CNOOC Krisna Upper & Lower BRF, Widuri, Intan, Vita 4.995
tahun-tahun mendatang, BPMIGAS telah meminta target is to optimize 49.5 billion barrel resource so that Aryani, East Widuri dan Zelda
semua Kontraktor KKS produksi memasukkan program it is ready for production delivery. If this activity is able
7 Job Talisman NE Air Serdang dan Guruh 4.345
implementasi EOR pada program kerja dan anggaran to convert 5% to 10% of the existing resource, it may
(WP&B) 2012. Tujuannya agar sumber daya yang ada lead to additional reserve for 4 billion barrel. Hence, 8 Steam Fold PT CPI Duri dan NDD 177.180
sebesar 49,5 Miliar Barrel dapat dioptimalkan, sehingga the reserve increases 100% from 4 billion barrel to
TOTAL 332.944
siap untuk diproduksikan. Bila kegiatan ini berhasil 8 million barrel.
merubah 5% sampai 10% sumber daya yang ada, Today, some PSC Contractors are conducting
maka akan terjadi penambahan cadangan sebesar 4 EOR study by employing chemical materials. The
Miliar barrel sehingga cadangan naik 100% dari 4 Miliar PSC Contractors are PT Chevron Pacific Indonesia
BPMIGAS mendukung penuh Kontraktor BPMIGASl strongly supports the PSC Contractors
Barrel menjadi 8 Miliar Barrel. (Minas field), PT Medco E&P (Kaji Semoga field),
KKS dalam penerapan teknologi EOR, termasuk in implementing EOR technology, including chemical
Beberapa Kontraktor KKS saat ini sedang Pertamina EP (Tanjung, Kenali Asam and Limau field),
chemical flood dengan dibantu oleh institusi pemerintah flood, with the support of government institutions
melakukan studi EOR dengan menggunakan bahan and at BOB PT BSP.
seperti Lemigas dan institusi pendidikan seperti ITB, like Lemigas and education institution such as
kimia, misalnya di PT Chevron Pacific Indonesia
UGM dan IPB. Salah satu hasil yang membanggakan, ITB, UGM, and IPB. One of the prominent results is
(lapangan Minas), PT Medco E&P (lapangan Kaji
surfactant untuk chemical flood telah berhasil diproduksi a surfactant for chemical flood that has been
Semoga), Pertamina EP (lapangan Tanjung, Kenali
di dalam negeri. manufactured domestically.
Asam dan Limau), serta di BOB PT BSP.
02. Upaya Peningkatan Produksi 02. Efforts to Increase Production 60 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 61
C. Reaktivasi Sumur- Dari 2.663 sumur lama yang diinventarisasi, From 2,663 inventoried old
Sumur Suspended terdapat sekitar 271 sumur yang secara teknis wells, there are 271 wells that
are technically qualified for
dapat dioperasikan kembali. production.
Dalam rangka meningkatkan produksi, BPMIGAS To increase productivity, BPMIGAS with PSC
Kegiatan Reaktivasi Sumur-sumur Suspended
bersama Kontraktor KKS juga menginventarisasi Contractors work to inventory old wells which still have
Reactivation Activity of Suspended Wells
sumur-sumur lama yang masih berpotensi untuk potential to be reactivated. Those old wells have been
diproduksikan kembali (reaktivasi). Sumur-sumur abandoned due to various reasons. Daerah Evaluasi Sub-surface Usulan Sumur Disetujui
lama tersebut sebelumnya ditinggalkan karena From the data collection, the reactivated wells Engineering Reaktivasi (Teknis) BPMIGAS
berbagai penyebab. are mainly found in Pertamina EP working area. From Area Sub-surface Suggested Well Approved (Technical)
Engineering Evaluation Reactivation BPMIGAS
Dari pendataan yang dilakukan, sumur-sumur 2,663 old well inventories, there are 271 wells that
yang dapat direaktivasi sebagian besar berada di are technically qualified for production with average Reg. Sumatera 665 192 40
wilayah kerja Pertamina EP. Dari 2.663 sumur lama production contribution of 20 - 50 BOPD for each well.
UBEP Adera 159 58 47
yang diinventarisasi, terdapat sekitar 271 sumur yang Those wells are located in Sumatera region (40 wells),
secara teknis dapat diproduksikan kembali dengan Java region (184 wells), and from UBEP Adera in South
UBEB Jambi 325 55 0
perkiraan kontribusi produksi sekitar 20 - 50 BOPD Sumatra (47 wells).
per sumur. Sumur-sumur tersebut terdapat di Region The reactivation activity of suspended wells will UBEB Sanga-Sanga Tarakan 1.129 322 0
Sumatra (40 sumur), di Region Jawa (184 sumur) dan be implemented in 2012 and is expected to contribute
Reg. Jawa 385 211 184
dari UBEP Adera di Sumatra Selatan (47 sumur). some production in the same year.
Kegiatan reaktivasi sumur-sumur suspended
UBEP Limau 0 0 0
akan mulai diimplemantasikan pada tahun 2012, dan
diharapkan dapat menyumbangkan produksi mulai Reg. KTI 0 0 0
tahun yang sama.
UBEP Tanjung 0 0 0
UBEP Lirik 0 0 0
D. Forum Operator KKKS Setiap Kontraktor KKS eksplorasi Each Exploration PSC
Untuk membantu mempercepat realisasi To assist the acceleration of realization of Komite Tender dan Operasional mengusahakan Procurement and Operational Committee
kinerja Kontraktor KKS eksplorasi dalam memenuhi Exploration PSC Contractors’ performance in agar Kontraktor KKS bisa mendapatkan peralatan assists PSC Contractors to obtain supporting
komitmen pasti dan mendorong mereka mencapai fulfilling Firm Commitment and support them to penunjang operasi dengan biaya yang lebih murah, equipment with lower cost through coordination of
tahap produksi, pada tahun 2011 BPMIGAS berinisiatif achieve production phase, BPMIGAS takes initiative antara lain dengan cara mengkoordinasi pengadaan joint procurement with other PSC Contractors that
membentuk Forum Operator KKKS Wilayah Kerja to establish PSC Contractors’ Forum for Exploration secara bersama Kontraktor KKS yang beroperasi operated in one close distant area. Moreover, G&G
Eksplorasi (FOKWE). Forum ini secara langsung Working Area (FOKWE). The forum is directly monitor dalam satu wilayah yang berdekatan. Sementara Technical Committee assists in technical issues.
memantau progress kegiatan dan permasalahan yang activities and problems faced by Exploration PSC Komite Teknik G&G memberikan asistensi terhadap
dihadapi Kontraktor KKS Eksplorasi tersebut, dan Contractors and deliver problem solving ideas. berbagai masalah keteknikan.
mencarikan jalan pemecahannya. The forum, led by the Vice Chairman of BPMIGAS
Forum diketuai oleh Wakil Kepala BPMIGAS, with the assistance of all Deputies and Head of the Progress Kegiatan FOKWE Okt - Des 2011
dibantu oleh semua Deputi dan Kepala Divisi. BPMIGAS Division of BPMIGAS, also provides permanent FOKWE Activity Progress Oct - Dec 2011
juga menyediakan ruang sekretariat permanen yang secretariat office that facilitates PSC Contractors
Rapat Pre-Kick Off Pre-Kick Off Meeting 5 Okt 2011
memudahkan Kontraktor KKS melakukan koordinasi to coordinate with BPMIGAS or to share knowledge Koordinasi dan
Rapat Kick Off Kick Off Meeting
dengan BPMIGAS, atau sharing pengetahuan dengan with other PSC Contractors’ members. 13 Okt 2011 Penyusunan
Kontraktor KKS lain. To facilitate the operational work, this forum
Komite Partnership Partnership Committee 18 Okt 2011 Rakor I Program Kerja
Komite Tender & Operasional Procurement & Operational Committee
dengan KKKS
Untuk memudahkan operasional pekerjaan, forum has 4 (four) committees formed based on the 19 Okt 2011 Coordination
ini memiliki 4 (empat) komite yang dibentuk berdasarkan main obstacles that occur during Exploration PSC Komite Teknis G&G G&G Technical Committee 20 Okt 2011 Meeting I Coordination and
permasalahan utama yang selama ini menghambat Contractors’ work activities, which are: Komite Perizinan & Sosial Permit & Social Committee 24 Okt 2011 Arrangement
kegiatan Kontraktor KKS Eksplorasi, yaitu : 1. Partnership Commitee Koordinator BPMIGAS BPMIGAS Coordinator 26 Okt 2011
of Working
Program with PSC
1. Komite Partnership. 2. Permit and Social Commitee Pindah ke ruang sekretariat baru (LT. 21) Move to new secretariat office (21 floor)
st
1 Nov 2011 Contractors
2. Komite Perijinan & Sosial 3. Procurement and Operational Committee Komite Tender & Operasional Procurement & Operational Committee 3 Nov 2011 Rakor II
3. Komite Tender dan Operasional 4. G&G Technical Commitee Komite Partnership Partnership Committee 4 Nov 2011 Coordination
4. Komite Teknis G&G Komite Teknis G&G G&G Technical Committee 8 Nov 2011 Meeting II
Partnership Committee is formed to solve PSC Komite Perizinan & Sosial Permit & Social Committee 9 Nov 2011
Komite Partnership dibentuk untuk memecahkan Contractors’ issue toward the failure in fulfilling Firm Komite Teknis G&G G&G Technical Committee 23 Nov 2011 Rakor III
masalah Kontraktor KKS yang tidak dapat memenuhi Commitment due to internal problems. Meanwhile,
Komite Tender & Operasional Procurement & Operational Committee 25 Nov 2011 Coordination
komitmen pasti karena masalah internal. Sementara Permit and Social Committee is formed to solve
Komite Partnership Partnership Committee 29 Nov 2011 Meeting III
Komite Perizinan dan Sosial dibentuk untuk overlapping land issues, permit in central to local
Komite Tender & Operasional Procurement & Operational Committee 6 Des 2011
memecahkan permasalahan tumpang tindih lahan, region, public relation, and other problems.
pemenuhan perizinan di tingkat pusat maupun daerah,
Rapat Kemajuan Program Kerja
masalah kehumasan, dan sebagainya. Working Program Development Meeting
Pelaksanaan
Pemecahan Masalah/Evaluasi/Diskusi Implementation
Problem Solving/Evaluation/Discussion
02. Upaya Peningkatan Produksi 02. Efforts to Increase Production 64 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 65
Setiap Kontraktor KKS Eksplorasi dikelompokkan Each Exploration PSC Contractors is grouped in
ke dalam masing-masing Komite berdasarkan each committee based on the obstacles they are
kendala yang dihadapi. Progres kegiatan yang sudah dealing with. The progress of the event is a working
dilakukan antara lain perumusan Program Kerja yang program formula which is arranged based on the analysis
disusun berdasarkan analisa permasalahan dengan of the issues with priority of the indispensable matters.
memprioritaskan hal-hal yang dinilai paling diperlukan. It is delivered through coordination meetings in internal
Hal tersebut dilakukan melalui rapat koordinasi BPMIGAS with the coordinator of PSC Contractors, as
baik di lingkungan internal BPMIGAS, bersama well as all committee members. FOKWE coordination
koordinator Kontraktor KKS, maupun dengan seluruh meetings that had been held since Kick Off Meeting were
anggota komite. Rapat Koordinasi FOKWE yang two Internal Coordination Meeting and 12 Coordination
telah diselenggarakan sejak Kick Off Meeting, yaitu 2 Meetings with PSC Contractors.
(dua) kali Rapat Koordinasi Internal dan 12 kali Rapat
Koordinasi dengan Kontraktor KKS.
Untuk memperlancar kegiatan industri hulu To ensure that the activity of upstream oil and dan akuntabel. Sebagai tindak lanjut dari MoU, management. As the implementation of the MoU,
migas, pada tahun 2011 BPMIGAS juga melaksanakan gas runs smoothly, in 2011 BPMIGAS also established BPMIGAS telah mengirimkan daftar program- BPMIGAS has delivered a list of system programs to
beberapa kerjasama dan komitmen dengan beberapa cooperation and commitments with several government program sistem ke BPK agar dilakukan evaluasi. The Audit Board of the Republic of Indonesia (BPK)
lembaga pemerintahan, universitas nasional dan institutions, national universities, and institutions from for further evaluation.
instansi-instansi di berbagai bidang, antara lain: various disciplines, such as: 4. Universitas Padjajaran
Penandatanganan kesepakatan dilaksanakan pada 4. Padjajaran University
1. Kementerian Pertahanan 1. Ministry of Defense tanggal 6 Juni 2011, utamanya dengan Fakultas The MoU was signed on 6 th June 2011, mainly with
BPMIGAS menandatangani Nota Kesepahaman BPMIGAS signed Memorandum of Understanding Teknik Geologi, Universitas Padjajaran. Kerjasama Geology Faculty. This agreement is conducted in
(MoU) bersama Kementerian Pertahanan pada (MoU) with Ministry of Defense on 6th January 2011. ini dilaksanakan dalam rangka mempercepat terms of accelerating the first Plan of Development
tanggal 6 Januari 2011. Kerjasama ini diharapkan This agreement is expected to increase the security proses persetujuan Plan Of Development (POD) (PoD) agreement process which is Jangkrik field at
dapat meningkatkan keamanan di wilayah kerja migas in oil and gas area in Indonesia, mainly the activity of Pertama Lapangan Jangkrik, di Blok Muara Muara Bakau block suggested by PSC Contractor
di seluruh Indonesia, utamanya kegiatan operasi upstream oil and gas industry located in border area. Bakau yang diajukan oleh Kontraktor KKS ENI. ENI. The cooperation is focused in conducting
hulu migas yang berada di kawasan perbatasan Kerjasama difokuskan dalam melakukan riset yang research covering financial and international law.
antar negara. 2. Ministry of Marine Affairs and Fisheries meliputi aspek finansial dan hukum internasional. The cooperation has resulted with the acceleration
of Republic Indonesia Kerjasama telah membuahkan hasil yakni percepatan agreement process of POD in BPMIGAS which
2. Kementerian Kelautan dan Perikanan (KKP) The agreement was signed on 19 th January 2011, proses persetujuan POD di BPMIGAS hanya 16 hari requires only 16 active working days and the
Penandatanganan nota kesepahaman dilaksanakan designated to optimize the potential of empowerment kerja dan proses persetujuan di Kementrian ESDM agreement evaluation process in Ministry of Energy
pada tanggal 19 Januari 2011, bertujuan untuk toward local people in coastal area and rural kurang dari 2 (dua) bulan. Selanjutnya model ini akan and Mineral Resources Republic Indonesia (ESDM)
mengoptimalkan pemberdayaan masyarakat pesisir islands in the upstream oil and gas working area on dikembangkan untuk membantu proses percepatan that takes less than two months. In the future this
dan pulau-pulau kecil di sekitar wilayah kerja migas Indonesian waters. As a note, currently the 65% of persetujuan POD pertama lapangan lainnya. model will be developed to assist acceleration
di perairan Indonesia. Sebagai catatan, saat ini 65% upstream oil and gas activities are located on the process agreement of the first others POD fields.
kegiatan hulu migas berada di wilayah perairan. waters. This activity and agreement are expected to 5. JBIC (Japan Bank for International Cooperation)
Kegiatan ini diharapkan dapat menekan gangguan stall social issues that challenge product realization. Penandatanganan nota kesepakatan dengan 5. JBIC (Japan Bank for International Cooperation)
sosial yang saat ini menghambat realisasi produksi. JBIC telah dilakukan pada tanggal 28 Juni 2011 The MoU signing with JBIC was done on 28 June
3. The Audit Board of the Republic of sebagai payung kerjasama pengembangan 2011 as a cooperation umbrella for gas business
3. Badan Pemeriksa Keuangan (BPK) Indonesia (BPK) bisnis gas di Indonesia. Sebagai kelanjutannya development in Indonesia. As a further development,
MoU dilakukan pada tanggal 21 Januari 2011, terkait The MoU was signed on 21st January 2011, telah ditandatangani Declaration of Cooperation DoC (Declaration of Cooperation) with two Japanese
pengembangan dan pengelolaan sistem informasi in relation to the development and the operation of (DoC) bersama dua perusahaan Jepang yakni companies: Sumitomo and Misui, had been signed.
serta akses data dalam rangka pemeriksaan, Information System and data accessing in terms of Sumitomo dan Mitsui. Kerjasama dengan Mitsui The cooperation with Mitsui is targeted to be a main
pengelolaan, dan tanggung jawab negara. examination, management, and state responsibility. ditargetkan sebagai dasar pengembangan development of Compressed Natural Gas (CNG)
Tujuannya, untuk mewujudkan tata pemerintahan The goal is to manifest transparent and accountable proyek marine Compressed Natural Gas (CNG) marine project while the DoC with Sumitomo is
dan pengelolaan keuangan negara yang transparan public administration as well as state’s finance sedangkan Declaration of Cooperation dengan focused on gas development project for electricity in
02. Upaya Peningkatan Produksi 02. Efforts to Increase Production 68 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 69
Sumitomo difokuskan kepada pengembangan Indonesia. From the cooperation, it is expected that antara Kepala BPMIGAS dengan Kepala Kepolisian signing ensures coordination especially in guarding
proyek gas untuk kelistrikan di Indonesia. the small gas areas are able to operate and employ RI yang telah ditandatangani pada 11 Juni 2008 and security during upstream oil and gas activity in
Dari kerjasama tersebut diharapkan lapangan- to fulfill the need of energy especially electricity mengenai mekanisme prosedur tetap organisasi East Borneo by using an improved mechanism.
lapangan gas skala kecil di dalam negeri dapat around BPMIGAS’ working area. Therefore, the dan tata kerja pengamanan bersama di seputar
dioperasikan dan dimanfaatkan untuk memenuhi larger reserves are able to be allocated to further kegiatan hulu migas beserta pembiayaannya. 8. The Financial and Development Supervisory
kebutuhan energi (utamanya listrik) di sekitar strategic needs. Penandatanganan kerja sama tersebut Agencies (BPKP)
wilayah kerja, sehingga cadangan-cadangan besar memperlancar koordinasi, utamanya dalam hal In order to increase development and application
dapat didedikasikan untuk kepentingan yang 6. Proklamasi 45 University (UP 45) bantuan pengawalan dan pengamanan dalam of good governance, development and risk
lebih strategis. The agreement was signed on 22nd July 2011, kegiatan industri hulu migas di wilayah Kalimantan management assessment, internal control system,
related to independent research, education, Timur melalui mekanisme yang lebih tertata. and supervision activity, BPMIGAS also cooperates
6. Universitas Proklamasi 45 (UP45) training, and public service. In this case, the with BPKP. The first step is to conduct Diagnostic
Kesepakatan dilaksanakan pada tanggal 22 Juli 2011, Proklamasi 45 University works to conduct planning, 8.
Badan Pengawasan Keuangan dan Assessment to determine potentials to develop
terkait swakelola penelitian, pendidikan, pelatihan implementation, and independent supervision while Pembangunan (BPKP) as a way to maintain “Unqualified Opinion” stated
dan pengabdian kepada masyarakat. Dalam hal BPMIGAS provides data assistance related to the Dalam rangka meningkatkan pengembangan dan by The Audit Board of the Republic of Indonesia
ini UP 45 melakukan perencanaan, pelaksanaan implementation of the projects. penerapan good governance, pengembangan dan (BPK) toward BPMIGAS’ financial report in the past
dan pengawasan pekerjaan secara swakelola, The realization of the activity is consulting activity assessment manajemen risiko dan sistem internal 4 years in the row since 2007.
sedangkan BPMIGAS memberikan bantuan data of POD Budi Field by PSC Contractor Tately NV. control, serta kegiatan pengawasan, BPMIGAS juga
dan informasi terkait kebutuhan pelaksanaan The evaluation focus was done since the beginning merintis kerja sama dengan BPKP. Langkah pertama
pekerjaan. Kegiatan yang sudah dilakukan untuk of September until the end of December 2011. The yang dilakukan adalah melakukan Diagnostic
merealisasi kerja sama tersebut antara lain kegiatan assignment, which was run by consortium team led Assessment yang bertujuan untuk menentukan
konsultasi POD Lapangan Budi oleh Kontraktor by Proklamasi 45 University, completed in the end potensi yang dapat dikembangkan dalam rangka
KKS Tately NV. Fokus evaluasi dilakukan sejak awal of 2011. mempertahankan opini Wajar Tanpa Pengecualian
September sampai akhir Desember 2011. Pekerjaan (WTP) dari BPK terhadap Laporan Keuangan
yang dilakukan tim konsorsium yang diketuai UP 7. POLDA Kalimantan Timur (Indonesia National BPMIGAS selama 4 (empat) tahun berturut-turut
45 tersebut telah dapat diselesaikan pada akhir Police, East Borneo District) sejak tahun 2007.
tahun 2011. The agreement was signed on 28th September 2011
as an adjustment of the agreement on 29 th April
7. Kepolisian Daerah (POLDA) Kalimantan Timur 2009. The MoU was a copy of the MoU between
Amandemen Kerjasama yang telah ditandatangani Chairman of BPMIGAS and Head of Police of
pada tanggal 28 September 2011 merupakan Republic Indonesia on 11 June 2008 toward standard
penyesuaian atas Kesepakatan Bersama tanggal operational procedure in each organization and joint
29 April 2009. Kesepakatan Bersama tersebut security mechanism around upstream oil and gas
merupakan turunan dari Nota Kesepahaman activities and its finance matter. The agreement
02. Upaya Peningkatan Produksi 02. Efforts to Increase Production 70 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 71
F. Sharing Knowledge
Dalam rangka peningkatan produksi minyak In order to increase national oil production,
nasional, BPMIGAS bersama Kontraktor KKS BPMIGAS together with PSC Contractors work to
juga mengadakan forum sharing knowledge yaitu establish a sharing knowledge forum, a forum to share
forum berbagi pengalaman kesuksesan, sekaligus success experience. It aims as a way to build the spirit
membangun semangat kemitraan untuk menjawab of partnership to answer various challenges. Through
berbagai tantangan yang semakin beragam. Dengan this forum, technical challenge occurred in production
adanya forum ini, diharapkan tantangan yang bersifat increase efforts is able to be solved.
teknis dalam hal upaya peningkatan produksi dapat These are some forums and workshop conducted
dicarikan jalan pemecahan. by BPMIGAS in 2011:
Berikut adalah beberapa forum dan workshop 1. Sharing Knowledge (31st March - 1st April 2011)
yang dilaksanakan BPMIGAS pada tahun 2011: Sharing knowledge about best practice in oil
1. Sharing Knowledge (31 Maret - 1 April 2011) and gas production to increase national oil
Sharing knowledge tentang best practice dalam and gas production.
bidang produksi migas untuk Peningkatan Produksi 2. EOR Workshop (23 rd - 24th June 2011)
Migas Nasional. Building equal understanding/perception, potential
2. Workshop EOR (23 - 24 Juni 2011) mapping, experience sharing, EOR technical activity
Penyamaan persepsi, pemetaan potensi, sharing to increase national oil and gas production.
pengalaman dan teknologi kegiatan EOR untuk 3. Product Optimization to Increase National Oil
peningkatan produksi migas nasional. Production Workshop (15th - 16 th Augustus 2011)
3. Workshop Optimisasi Produksi untuk Potential mapping and experience sharing as
Peningkatan Produksi Minyak Nasional well as technology to maximize PSC Contractors’
(15 - 16 Agustus 2011) contribution that have potential in increasing national
Pemetaan potensi dan sharing pengalaman oil production.
serta teknologi untuk memaksimalkan kontribusi
Kontraktor KKS yang memiliki potensi peningkatan
produksi minyak nasional.
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 72 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 73
03 Berbagai Upaya
Penyelesaian Masalah
Troubleshooting Efforts
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 74 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 75
A. Pengadaan Lahan Sebagian kegiatan seismik KKKS terkendala Some seismic activities
by PSC Contractors were
oleh belum selesainya proses pengadaan
troubled by unfinished land
tanah, akan dilakukan oleh CPI, Medco Rimau provision will be done by CPI,
dan Medco Tarakan. Medco Rimau, and Medco
Tarakan.
Land Provision
Kesulitan pengadaan lahan yang akan digunakan The difficulty in land provision which is employed Agar dapat mencapai target produksi yang In order to achieve the national production
untuk menunjang kegiatan hulu migas, masih menjadi to support upstream oil and gas activity still becomes ditetapkan nasional, BPMIGAS berkoordinasi dengan target, BPMIGAS coordinated with The House of
salah satu masalah serius yang menghambat realisasi one of the serious issues which blocked realization DPR RI dalam penyusunan Undang-undang Pertanahan, Representatives (DPR) in drafting Land Constitution
kegiatan tahun 2011. Masalah ini muncul karena lahan activity in 2011. This issue occurred since the required sehingga pengadaan tanah oleh industri hulu migas so that the land provision by upstream oil and gas
yang akan dibutuhkan tumpang tindih dengan kegiatan land is overlapped by other activities or still owned diperlakukan sebagai tanah untuk mendukung industry is treated as a land to support public interest
lain, atau masih dikuasai oleh departemen lain, PEMDA, by other department, municipal party, private party, kepentingan umum dan proses pengadaannya sesuai and the provision process is in accordance with laws
swasta atau perorangan. or individual. dengan peraturan perundangan yang berlaku di industri used in the industry.
Sepanjang tahun 2011 terdapat 18 Kontraktor KKS During 2011, there were 18 PSC Contractors hulu migas.
yang tidak dapat merealisasikan kegiatan di lapangan were not able to implement the field activity due to
karena terkendala masalah ini, sehingga kehilangan this issue. Hence, the potential loss was 4,703 BOPD
potensi produksi minyak sebesar 4.703 BOPD dan gas oil production and 65.7 MMSCFD gas. Some PSC
sebesar 65,7 MMSCFD. Beberapa Kontraktor KKS yang Contractors which were troubled by the issue are
terkendala masalah tersebut antara lain ConocoPhillips ConocoPhillips Grissik who had not obtained permit
Grissik yang belum mendapatkan ijin dari Kementerian from the Ministry of Forestry, Natural Resources
Kehutanan, Balai Konservasi SDA dan Pemerintah Conservation Board (Balai Konservasi SDA) and
Daerah Tingkat I untuk melakukan kegiatan eksplorasi Municipal Government Level I (PEMDA Tingkat I) to
yang berpotensi meningkatkan produksi gas sebesar conduct exploration which had the potential to increase
400 MMSCFD. Hambatan serupa juga dialami oleh gas production in the amount of 400 MMSCFD. The
PetroChina Jabung yang berpotensi meningkatkan similar obstacle also occurred to PetroChina Jabung
produksi gas sebesar 35,8 MMSCFD dan kondensat who has potential to increase the gas production by
sebesar 5,5 barrel per hari serta PetroChina Bermuda 35.8 MMSCFD and condensate by 5,5 barrels per day,
yang berpotensi meningkatkan produksi gas sebesar and also PetroChina Bermuda who has the potential to Beberapa Kontraktor KKS yang
5,8 MMCFD dan produksi minyak sebesar 2.000 BOPD. increase the gas production by 5.8 MMSCFD and oil
Sebagian kegiatan seismik KKKS juga terkendala production by 2,000 BOPD.
terkendala masalah tersebut antara
oleh belum selesainya proses pengadaan tanah yang Some seismic activities by PSC Contractors were lain ConocoPhillips Grissik
dikuasai oleh perorangan, antara lain kegiatan yang also troubled by unfinished land provision which is
akan dilakukan oleh CPI, Medco Rimau dan Medco still owned by individual, such as activities done by Some PSC Contractors which are troubled by the
Tarakan. Kegiatan yang dilakukan setiap KKKS tersebut CPI, Medco Rimau, and Medco Tarakan. The activity issue are ConocoPhillips Grissik
berpotensi menambah produksi minyak antara 1.300 implemented by each PSC Contractors is potential to
BOPD hingga 2.500 BOPD. increase the oil production between 1,300 BOPD to
2,500 BOPD.
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 76 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 77
B. Pengamanan Obyek Gangguan keamanan yang terjadi sepanjang The safety interference
throughout 2011 reached 1,611
Vital Nasional 2011 mencapai 1.611 kejadian, sebagian di
events, some of them troubled
antaranya mengganggu realisasi produksi. the production realization.
Dalam upaya peningkatan produksi minyak dan gas In order to increase oil and gas production in 2011, Gangguan keamanan pada tahun 2011 meningkat Safety barrier on 2011 increased 213% or twice
di tahun 2011, BPMIGAS menghadapi sejumlah kendala BPMIGAS encounters non-technical barrier of security 213% atau dua kali lipat lebih banyak dibandingkan more compare to safety barrier on 2010 around
non teknis berupa gangguan kemananan di wilayah disturbance in working area of PSC Contractors. Some jumlah gangguan keamanan pada tahun 2010 756 cases. There are 493 cases of theft of oil
kerja Kontraktor KKS. Beberapa gangguan serius yang serious disturbances which interrupted realization of yang berjumlah 756 kasus, terdiri dari 493 kasus and gas equipment and 263 cases of oil and gas
mengganggu realisasi kegiatan operasi antara lain: the operational activity are: pencurian peralatan migas dan 263 kasus gangguan operation disturbance.
1. Perusakan fasilitas produksi oleh warga di Lapangan 1. The production facilities were destroyed by Tiaka operasi migas. Based on Presidential Decree No. 63/2004 on
Tiaka, Kabupaten Morowali, Sulawesi Tengah yang field, Morowali County, Center of Sulawesi which Berdasarkan Keputusan Presiden No. 63 Tahun the Security of National Vital Object and Ministry of
dioperasikan oleh JOB Pertamina-Medco Tomori are operated by JOB Pertamina-Medco Tomori in 2004 tentang Pengamanan Obyek Vital Nasional dan Energy and Mineral Resources Decree No. 1762/07/
pada Agustus 2011, yang kemudian berkembang August 2011, which led to a riot. The state police Keputusan Menteri Energi dan Sumber Daya Mineral MEM/2007, the upstream oil and gas projects
menjadi kerusuhan. Aparat keamanan membantu assisted to overcome the riot but two police officers No. 1762/07/MEM/2007, proyek-proyek hulu migas considered as National Vital Object category.
mengatasi kerusuhan yang terjadi, namun dua orang have passed away in the riot. The impact was termasuk dalam katagori obyek vital nasional.
meninggal dunia dalam peristiwa itu. Dampak pada the oil production of 2,000 barrels/day was stopped
kegiatan operasi migas, produksi minyak sebesar for 10 days.
2.000 barel per hari dihentikan selama 10 hari. 2. The production facility was closed by local people
2. Ditutupnya fasilitas produksi oleh masyarakat in Suban field, Jambi, which was operated by Gangguan Keamanan
Pencurian Operasional Total
setempat di Lapangan Suban, Jambi, yang ConocoPhillips in the early February 2011. The Security Interference Theft Operational Total
dioperasikan ConocoPhillips pada awal Februari potential loss in the gas production was 120 million
2011. Kehilangan potensi produksi gas mencapai 120 cubic feet per day. 1.000
1611
juta kaki kubik gas bumi per hari. 3. The theft of crude oil of Pertamina EP
3. Pencurian minyak mentah Pertamina EP yang terjadi which occurred in Tempino pipeline and Plaju in
853
945
750
715
di jalur pipa Tempino dan Plaju di bulan Maret 2011. March 2011. 764
756
641 559
566 471 758
Secara kumulatif jumlah gangguan keamanan yang Cumulatively, the safety interferer throughout 493
500
terjadi sepanjang 2011 mencapai 1.611 kejadian, terdiri 2011 reach 1,611 events. It consists of theft of oil and 355
dari gangguan pencurian peralatan migas sebanyak gas equipment about 853 cases and other operation
853 kasus dan gangguan operasi lainnya mencapai 758 interference reaches 758 cases. Those operation 250
kasus. Beberapa jenis gangguan operasi antara lain interference such as rally, sabotage and threats. 263
unjuk rasa, sabotase, dan ancaman. 204 198 156
116
2006 2007 2008 2009 2010 2011
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 78 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 79
Oleh karena itu untuk menekan gangguan Therefore, to overcome the security disturbance, Dengan menciptakan nilai tambah bagi masyarakat By creating added value for the community
keamanan, BPMIGAS melakukan berbagai upaya, BPMIGAS has conducted various attempts, such as: sekitar, maka masyarakat juga akan semakin terlibat around the working area, the community will also
antara lain: 1. Signing security cooperation agreement aktif dalam menjaga kelangsungan operasi hulu become more involved in maintaining the sustainability
1. Menandatangani perjanjian kerjasama pengamanan in operational area of oil and gas throughout minyak dan gas bumi di wilayah kerja mereka sehingga of upstream oil and gas in their working area so that
di wilayah operasi minyak dan gas bumi di seluruh Indonesia with The Ministry of Defense on 6 th keamanan operasi hulu minyak dan gas bumi akan the upstream oil and gas will become sustainable.
Indonesia dengan Kementerian Pertahanan, pada January 2011. The activity is primarily designated terus terjaga secara berkesinambungan. In 2011, BPMIGAS encouraged the implementation
tanggal 6 Januari 2011. Kegiatan ini diutamakan to secure the working areas of oil and gas, Memasuki tahun 2011, BPMIGAS mendorong of “Bright and Green” program as a contribution effort
untuk membantu keamanan wilayah-wilayah mainly in borderland area. pelaksanaan Program “Bright and Green” sebagai from upstream oil and gas industry to community.
kerja migas, utamanya yang berada di wilayah 2. Signing the cooperation agreement with Indonesian bentuk kepedulian sumbangsih industri hulu minyak “Bright” program is not only comprehended literally
perbatasan. National Police on 28th September 2011, to dan gas bumi bagi masyarakat. Program “Bright” as the commitment from BPMIGAS - PSC Contractors
2. Menandatangani perjanjian kerjasama dengan anticipate security disturbance within Indonesian tidak saja dimaknai secara harfiah sebagai komitmen to be “brighter”, but also to be “enlighten”, including
Kepolisian Republik Indonesia pada tanggal area with complex demographic. This cooperation BPMIGAS - KKKS untuk membuat daerah di seputar supplying infrastructure and access so that community
28 September 2011, untuk mengantisipasi is to be followed by the cooperation signing with operasi migas menjadi lebih “terang”, namun juga becomes brighter and obtain better life.
gangguan keamanan di wilayah Indonesia dengan Indonesian Regional Police (POLDA) which is East bermakna “pencerahan” termasuk di dalamnya
demografi yang kompleks. Selanjutnya kerjasama Borneo Police to increase the security of the area. menyediakan sarana dan akses agar masyarakat lebih
ini ditindaklanjuti dengan penandatanganan 3. Signing the agreement with Hydro-Oceanographic cerdas dan memiliki kehidupan yang lebih cerah.
kerjasama dengan POLDA setempat antara lain Office of The Indonesian Navy to create sea map
Kepolisian Daerah Kalimantan Timur untuk semakin of some Indonesia waters in August 25, 2011. This
meningkatkan pengamanan di wilayah tersebut. agreement was conducted as prevention so that
3. Menandatangani perjanjian kerjasama dengan the collision accident in the 40 th bride in East Java
Dinas Hidro Oseanografi TNI AL untuk pembuatan offshore operated by Kodeco Energy in 2010 would
peta laut di sejumlah wilayah perairan Nusantara not happen in the future.
pada tanggal 25 Agustus 2011. Kerjasama ini
dilakukan sebagai langkah antisipasi agar kejadian To suppress operational disturbance, BPMIGAS
BPMIGAS mendorong pelaksanaan
tertabraknya anjungan KE-40 di lepas pantai Jawa expects that PSC Contractors would increase social “Bright and Green” sebagai bentuk
Timur yang dikelola Kodeco Energy pada tahun responsibility to people in oil and gas working area kepedulian industri hulu migas
2010 tidak terulang lagi. through community development program and to
improve environmental care.
bagi masyarakat.
Untuk menekan gangguan operasi, BPMIGAS
juga berupaya agar Kontraktor KKS meningkatkan BPMIGAS encouraged the implementation of “Bright
kepeduliannya kepada masyarakat di sekitar wilayah and Green” program as a contribution effort from
kerja migas, melalui program community development upstream oil and gas industry to community.
serta meningkatkan perhatian pada lingkungan.
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 80 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 81
Sementara “Green” tidak saja meliputi upaya While “Green” does not only cover the effort to
Komposisi Biaya Program Sosial Penunjang Operasi Tahun 2011
untuk membuat bumi menjadi lebih hijau, tetapi lebih create the greener earth, but more about to “grow and
Cost Composition of 2011 Social Operation Supporting Program
bermakna “menumbuhkan dan menghidupkan”. rejuvenate”. Through “Green” program, it is expected
Melalui Program “Green”, diharapkan industri hulu that upstream oil and gas upstream becomes not only
52% 15%
minyak dan gas bumi tidak saja menjadi industri as an environmentally friendly industry, but also to
yang ramah lingkungan namun juga menumbuhkan increase the society’s living standard – mainly around
kehidupan masyarakat – utamanya di sekitar kegiatan oil and gas working areas to be better.
25% Pemenuhan Peraturan Kompensasi
operasi migas – agar menjadi lebih baik lagi. As implemented in the 2010 program, BPMIGAS 93,5 Miliar 27,8 Miliar
Regulation Fulfillment
Seperti pada pelaksanaan program tahun divides the Community Development Program with the 93.5 Billion
Compensation
27.8 Billion
2010, BPMIGAS membagi pelaksanaan Program focus on “Bright and Program” into two categories, 52%
Pengembangan Masyarakat dengan terfokus kepada
Program “Bright and Green” ke dalam 2 (dua) kategori,
which are Social Supporting Operation Program and
Community Development Program.
15%
25% 8%
yaitu Program Sosial Penunjang Operasi dan Program Social Supporting Operation Program is the 8% Infrastruktur Proses Perijinan
Pengembangan Masyarakat. activities conducted by PSC Contractors to support 44 Miliar 14,6 Miliar
Infrastructure Permit Process
Program Sosial Penunjang Operasi adalah operational activity. If it is not implemented, there is a 44 Billion 14.6 Billion
kegiatan-kegiatan KKKS yang dilakukan untuk risk of field operational disturbance, so that the cost is
menunjang kegiatan operasi. Apabila kegiatan tidak able to be included in operational cost.
Komposisi Biaya Program Pengembangan Masyarakat Tahun 2011
dilakukan maka dikhawatirkan dapat menimbulkan Community Development Program is a social
Cost Composition of 2011 Society Development Program
gangguan kegiatan di lapangan, sehingga biayanya program which has to be implemented by PSC
dapat dimasukan dalam biaya operasi. Contractors by using the budget from head office of
Adapun Program Pengembangan Masyarakat
merupakan program sosial yang harus direalisasikan
PSC Contractors, with the consideration based on
the Government Regulation no. 79 in 2010 regarding 49% 8% 12%
oleh KKKS dengan menggunakan anggaran Recoverable Operational Cost and Income Tax 8%
Lingkungan
Pendidikan Ekonomi
kantor pusat KKKS, dengan pertimbangan bahwa Treatment in Upstream Oil and Gas Field prohibits 42,4 Miliar
6,7 Miliar
10,8 Miliar
Environment
berdasarkan Peraturan Pemerintah Nomor 79 Tahun Community Development Program to be included into 23%
Education 6.7 Billion Economy
42.4 Billion 10.8 Billion
2010 tentang Biaya Operasi yang Dapat Dikembalikan operational cost for Exploitation PSC Contractors.
49%
dan Perlakuan Pajak Penghasilan di Bidang Usaha
Hulu Minyak dan Gas Bumi melarang Program
Pengembangan Masyarakat dimasukKan ke dalam
8% 8% 23%
12% Kesehatan
biaya operasi bagi KKKS eksploitasi. 7 Miliar Fasos & Fasum
Health 19,6 Miliar
7 Billion Social & Public Facilities
19.6 Billion
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 82 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 83
Sepanjang tahun 2011, masih terdapat beberapa During the year of 2011, there are still some proses pengadaan terlalu tinggi, sehingga akan One of the activities of PSC Contractors which is
peraturan yang belum mendukung realisasi kegiatan regulations which have not supported the activity menimbulkan biaya yang jauh lebih tinggi. troubled by this issue is submersible rig procurement
hulu migas, sehingga mengganggu pelaksanaan realization of upstream oil and gas industry, so that Salah satu kegiatan Kontraktor KKS yang by Chevron Indonesia Company (CICO) which will be
kegiatan di lapangan. they interrupt field implementation. terkendala masalah ini adalah pengadaan employed for drilling activity in Indonesia in some fields
submersible rig oleh Chevron Indonesia Company in Makassar deep sea. The areas are Gendalo field,
Undang-Undang No. 17 tahun 2008, Regulation no. 17, year 2008, regarding (CICO) yang akan digunakan untuk kegiatan Gehem field, Rapak field, and Ganal field. As a note,
tentang Pelayaran. Shipment. pengeboran di Indonesia beberapa lapangan di laut Gehem field is scheduled to be produced at the end
Undang-undang Pelayaran dimaksudkan untuk Shipment Regulations are intended to increase the dalam Makassar, yaitu Lapangan Gendalo, Gehem, of 2015.
meningkatkan kapasitas pengusahaan pelayaran capacity from national shipment company, specifically Rapak, dan Ganal. Sebagai informasi, Lapangan
nasional, khususnya kapal-kapal yang digunakan ships employed to support upstream oil and gas Gehem dijadwalkan dapat diproduksikan pada akhir Government Regulation no.79, year 2010
untuk mendukung industri hulu migas. Namun industry. However, since there are some kinds of ships tahun 2015. regarding Recoverable Operation Cost and
mengingat masih terdapat beberapa jenis kapal which have not been provided by national shipment The Tax Income Treatment in Upstream
yang belum dapat disediakan oleh perusahaan company, in 2011, The Ministry of Transportation Peraturan Pemerintah Nomor 79 Tahun Industry (‘PP 79/2010”).
perkapalan nasional, maka pada tahun 2011 released the Ministry Regulation No.48/2011 as a 2010 tentang Biaya Operasi yang Dapat This regulation puts in detail the types of cost
Kementerian Perhubungan memberlakukan permit of The Use of Foreign Ship (IPKA) valid for 3 Dikembalikan dan Perlakuan Pajak Penghasilan which is able and not able to be allocated in cost
Permenhub No. 48/2011 yang memungkinkan (three) months. IPKA is possible to be extended di Bidang Usaha Hulu (“PP 79/2010”). recovery component, which is not regulated previously
pemberian Izin Penggunaan Kapal Asing (IPKA) yang as the need of upstream oil and gas industry. The Peraturan ini merinci jenis-jenis biaya yang dapat in PSC’s contract. The PSC Contractors consider
berlaku selama 3 (tiga) bulan. IPKA dimungkinkan policy is applied until 2015 so that the purpose of the dan yang tidak dapat dimasukkan dalam komponen that PP 79/2010 decreases Indonesian investment
untuk diperpanjang sesuai kebutuhan operasi hulu regulation no.17/2008 can be accomplished. Some cost recovery, yang sebelumnya tidak diatur dalam climate because it is considered to limit the terms of
migas. Kebijakan tersebut akan diterapkan sampai kinds of the designated ship are drilling ship (jack up kontrak PSC. Para Kontraktor KKS menilai bahwa cost recovery without considerations from other party.
tahun 2015, sehingga maksud yang terkandung dari rig, submersible rig, drill ship), survey ship (seismic PP 79/2010 menurunkan iklim investasi Indonesia, Some related clauses are cost realization limiting
UU No.17/2008 tetap dapat dicapai. Beberapa jenis survey, geotechnical, geophysics), and construction karena dianggap membatasi persyaratan cost clauses which are forbidden to exceed 10% from the
kapal dimaksud antara lain untuk kapal pemboran ship (pipe/cable laying ship/surf laying barge and recovery secara sepihak. Beberapa klausal yang approved expenses and tax for transfer of Participating
( jack up rig, submersible rig, drill ship), kapal survei underwater work). terkait dengan hal tersebut antara lain klausal Interest on Exploration PSC Contractors.
(survei seismik, geotenika, geofisika), dan kapal However, in the practice, the policy has not been pembatasan realisasi biaya yang tidak boleh lebih To settle the issue, in the end of 2011,
kontruksi (pipe/cable laying ship/surf laying barge accommodated the industrial interest of upstream 10% dari rencana pengeluaran yang sudah disetujui, Department of Finance has issued several regulations
dan pekerjaan bawah air). oil and gas since the validity of IPKA is shorter than dan pemberlakuan Pajak terhadap Pengalihan which specifically contain detailed orders as the
Namun dalam praktiknya, kebijakan tersebut other works to conduct. Although IPKA is able to Interest pada KKKS Eksplorasi. implementation of Government Regulation No.79/2010
belum cukup mengakomodir kepentingan industri be extended, the ship owner considers the risk in Untuk menyelesaikan masalah, pada akhir (PP No.79/2010) which is about Head Office Over
hulu migas, sebab masa berlakunya IPKA dinilai procurement process is too high, so it will generate tahun 2011 Departemen Keuangan telah membuat Head, implementation of Tax Income (PPh) to Interest
terlalu pendek dibanding pekerjaan yang akan higher cost. beberapa peraturan yang lebih detail sebagai dan Uplift Transfer, and expatriate remuneration.
dilakukan. Kendati IPKA dapat diperpanjang lagi, turunan dari PP No. 79/2010 tersebut, yaitu antara
namu pemilik kapal berpendapat bahwa risiko pada
03. Berbagai Upaya Penyelesaian Masalah 03. Troubleshooting Efforts 84 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 85
lain mengenai Head Office Over Head, pemberlakuan Municipal Regulation Related to oleh Pemda Kutai Kartanegara yang mengacu kepada Mining. As a result, the attempt to increase production
PPh terhadap Pengalihan Interes dan Uplift, serta Location Permit. UU No. 4 Tahun 2009 tentang Pertambangan Mineral was not able to be executed as planned.
Remunerasi Ekspatriat. In some areas, there are Municipal Regulations Batubara. Akibatnya, usaha peningkatan produksi Merangin field II in Musi Rawas, South Sumatra,
(PERDA) areas which are incompatible with higher tidak dapat dilaksanakan sesuai rencana. operated by Sele Raya also has to delay the
Peraturan Daerah Terkait Izin Lokasi. regulations or other regulations applied in upstream oil Lapangan Merangin II di Musi Rawas, Sumatra production activity for the time being due to failure in
Adanya PERDA di beberapa daerah yang tidak and gas industry that may interrupt the implementation Selatan yang dikelola Sele Raya pun harus obtaining trucking permit from Municipal Government
selaras dengan peraturan yang lebih tinggi, atau tidak of oil and gas production. Some of the examples menghentikan kegiatan produksi untuk sementara (PEMDA).
selaras dengan peraturan yang berlaku di industri hulu occurred in Mutiara field, Nilam and Badak in East waktu karena tidak mendapat izin trucking dari The offered compensation from Sele Raya to the
migas, yang menghambat realisasi produksi migas. Borneo operated by VICO Indonesia. PEMDA. Pemberian kompensasi dari Sele Raya Municipal Government only produces limited trucking
Beberapa contohnya terjadi di Lapangan Mutiara, Nilam kepada PEMDA hanya menghasilkan ijin trucking permit which is only 1,500 BOPD. The effort to
increase production to 2,500 BOPD in 2012 has failed
since the trucking permit has been withdrawn by the
Adanya PERDA di beberapa daerah Municipal Government due to road destruction issue.
yang tidak selaras dengan peraturan Hence, until the end of 2011, Merangin II field failed to
produce.
yang berlaku menghambat realisasi
produksi migas.
In some areas, there are Municipal Regulations
(PERDA) areas which are incompatible with other
regulations in the industry that may interrupt the
implementation of oil and gas production.
dan Badak di Kalimantan Timur yang dikelola oleh To increase gas production for 12 - 15 MMSCFD secara terbatas yakni untuk sebesar 1.500 BOPD.
VICO Indonesia. and condensate 200 - 500 barrels per day, VICO is Usaha meningkatkan produksi menjadi 2.500 BOPD
Untuk meningkatkan produksi gas sebesar scheduled to conduct drilling development activity. As pada tahun 2012 gagal karena PEMDA akhirnya
12 - 15 MMSCFD dan kondensat sebesar 200 - 500 a consequence, VICO should prepare a land for drilling mencabut izin trucking dengan alasan bahwa kegiatan
barel per hari, VICO dijadwalkan untuk melakukan purpose by building tracks. However, it was not able to tersebut merusak jalan, sehingga hingga akhir tahun
kegiatan pengeboran pengembangan. Oleh implement since VICO should obtained Mining Activity 2011 Lapangan Merangin II tidak dapat diproduksikan.
karenanya, VICO harus menyiapkan lahan untuk License (IUP), as required by Municipal Government
pengeboran dengan membangun tapak, namun hal ini (PEMDA) of Kutai Kartanegara which refers to
tidak dapat direalisasi karena VICO harus memiliki Izin Regulations No.4 year 2009 regarding Coal Mineral
Usaha Pertambangan (IUP), sebagaimana disyaratkan
04. Proyek Utama 2011 04. Main Projects 2011 86 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 87
BPMIGAS dan Kontraktor KKS berusaha merealisasi BPMIGAS and PSC Contractors attempt to Lapangan Banyu Urip yang memiliki cadangan Banyu Urip field which has the oil reserve of 450
sejumlah proyek utama yang diharapkan dapat implement some major projects which are expected minyak sebesar 450 juta barel, menjadi andalan utama millions of barrels becomes the main resource to
menghasilkan tambahan produksi minyak dan gas. to produce additional production of oil and gas. These peningkatan produksi minyak nasional pada tahun- increase national oil production in years to come. Full
Berikut adalah kegiatan yang dilakukan pada tahun are some activities presented in 2011 as realization of tahun mendatang. Kegiatan pengembangan secara capacity development is expected to be completed
2011 untuk merealisasi sejumlah proyek migas tersebut. oil and gas projects. penuh (full capacity) diharapkan dapat diselesaikan in 2014. In the early stage, the project is expected to
pada tahun 2014. Pada tahap awal, proyek diharapkan contribute additional production about 90 thousand
dapat menyumbang tambahan produksi sekitar 90 BOPD. The production is expected to reach the peak
ribu bopd. Produksi diharapkan mencapai puncak performance in 2015 - 2017 with the average result of
pada tahun 2015 - 2017, dengan rata-rata sebesar 165 thousand BOPD.
165 ribu bopd. To realize the project, the activity of Engineering,
Untuk merealisasi proyek, dilakukan kegiatan Procurement, and Construction (EPC) is conducted
Engineering, Procurement, and Construction (EPC) and divided into 5 divisions which are EPC-1:
yang dibagi dalam lima bagian yaitu EPC-1: fasilitas production facility, EPC-2: onshore pipe of 72 Km
produksi, EPC-2: pipa onshore sepanjang 72 Km, long, EPC-3: offshore pipe of 23 Km and mooring
EPC-3: pipa offshore sepanjang 23 Km beserta tower, EPC-4: Floating Storage Offloading/FSO with
mooring tower, EPC-4: Floating Storage Offloading/ the capacity about 2 millions of barrel and EPC-5:
FSO dengan kapasitas sekitar 2 juta barel dan EPC-5: infrastructure facility including water retention basin
fasilitas infrastruktur termasuk kolam penampung air with the capacity of 2.75 millions of meter cubic.
injeksi (water retention basin) dengan kapasitas 2,75 During 2011, it has been completed the tender
juta meter kubik. EPC winner selection. The details are:
Sepanjang tahun 2011 telah selesai dilakukan • The winner of EPC-1 is the consortium of Tripatra-
penunjukan pemenang pelaksana tender EPC, dengan Samsung, and they have signed the contract on
rincian sebagai berikut : 5th August 2011.
Kegiatan pengembangan secara • Pemenang EPC-1 adalah konsursium Tripatra- • The winner of EPC-2 is the consortium of IKPT-
penuh (full capacity) pada Lapangan Samsung, dan telah menandatangani kontrak pada Kelsri and they have signed the contract on
5 Agustus 2011. 31st October 2011.
Banyu Urip diharapkan dapat • Pemenang EPC-2 adalah konsorsium IKPT-Kelsri dan • The operator of EPC-3 is the consortium of Industrial
diselesaikan pada tahun 2014 telah menandatangani kontrak pada 31 Oktober 2011 Engineering – Likpin and have signed the contract on
• Pelaksana EPC-3 adalah konsorsium Rekayasa 1st November 2011.
Full capacity development in Banyu Urip Field is Industri-Likpin dan telah menandatangani kontrak
expected to be completed in 2014. pada 1 November 2011
04. Proyek Utama 2011 04. Main Projects 2011 90 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 91
• Pemenang EPC-4 adalah konsorsium Scorpa- • The winner of EPC-4 is the consortium of Scorpa- Pengembangan awal Lapangan Banyu Urip telah The early development of Banyu Urip field has
Sembawang dan telah menandatangani kontrak Sembawang and have signed the contract on dilaksanakan sejak 29 September 2009, dengan been conducted since 29 th September 2009 with the
pada 28 Oktober 2011 28th October 2011. tingkat produksi 13 juta barel per hari. Sepanjang production level of 13 million barrels per day. During
• EPC-5 adalah konsorsium Rekayasa Industri- • The winner of EPC-5 is the consortium of Industrial tahun 2011 realisasi produksi dari proyek ini sebesar 2011 the production realization of this project is 21,334
Hutama Karya dan telah menandatangani kontrak Engineering – Hutama Karya and have signed the 21.334 barel minyak per hari. barrels of oil per day.
pada 6 Desember 2011 contract on 6th December 2011
Kiri ke kanan: Kepala BPMIGAS R. Priyono, Direktur Jenderal Minyak dan Gas Bumi Evita Legowo, Menteri Energi dan
Kegiatan di lapangan diawali dengan upacara The field activity was started with the EPC-1 corner
Sumber Daya Mineral Jero Wacik dan Gubernur Jawa Timur Soekarwo meletakkan batu pertama pembangunan fasilitas
peletakan batu pertama proyek EPC-1 oleh Menteri stone ceremony by Minister of Energy and Mineral produksi penuh Lapangan Banyu Urip, Blok Cepu, Jawa Timur.
Energi dan Sumber Daya Mineral Jero Wacik dan Resources, Jero Wacik, and Chairman of BPMIGAS,
Left to right: BPMIGAS chief, R. Priyono, Directorate General of Oil and Gas, Evita Legowo and Governor of East Java,
Kepala BPMIGAS R. Priyono pada tanggal 6 Desember R. Priyono in December 6, 2011. It is expected that the
Soekarwo placed the cornerstone of full production facility in Banyu Urip field, Cepu block, East Java.
2011. Diharapkan mulai awal tahun 2012 kegiatan construction is able to start in early 2012.
pembangunan dapat terlaksana. Based on the plan, the EPC-1 construction would
Berdasarkan rencana, pelaksanaan pembangunan be completed in 36 months, EPC-2 in 22 months, EPC-
EPC-1 akan selesai dalam waktu 36 bulan, EPC- 3 in 28 months, EPC-4 in 27 months, and EPC-5 in
2 selama 22 bulan, EPC-3 selama 28 bulan, EPC-4 28 months. Besides the EPC construction, the drilling
selama 27 bulan, dan EPC-5 selama 28 bulan. Selain of production well is also conducted and estimated to
pembangunan EPC, juga akan dilakukan kegiatan accomplish within 48 months.
pemboran sumur produksi yang rencananya akan To increase the benefit of the project for nation,
dilaksanakan selama 48 bulan. BPMIGAS requires the maximum use of Local Content
Untuk meningkatkan manfaat proyek bagi bangsa, (TKDN). As the result, Consortium Industrial-Hutama
BPMIGAS mensyaratkan penggunaan unsur TKDN Karya as EPC-5 executing party provides the highest
secara maksimal. Hasilnya, konsursium Rekayasa TKDN which is 91.77%. Meanwhile the lowest TKDN is
Industri - Hutama Karya sebagai pelaksana EPC-5, offered by the winner of EPC-4, Scorpa-Sembawang,
memberikan komitmen penggunaan TKDN tertinggi, which is 30.01%. The reason behind the issue
yaitu sebesar 91,77%. Sementara pemenuhan TKDN was disability of local shipyard so that the FSO
terendah ditawarkan oleh pemenang konsorsium was imported.
EPC-4 yaitu Scorpa-Sembawang sebesar 30,01%.
Hal ini disebabkan adanya keterbatasan kemampuan
galangan kapal dalam negeri, sehingga FSO yang
dibutuhkan terpaksa dibeli dari luar Indonesia.
04. Proyek Utama 2011 04. Main Projects 2011 92 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 93
Indonesia Deepwater Development (IDD) merupakan Indonesia Deepwater Development (IDD) is a deep terlaksana pada 2013, sedangkan FID untuk Hub year later. The early production plan of Bangka field
proyek laut dalam yang dikembangkan oleh Chevron sea project developed by Chevron Indonesia Company Gendalo dan Gehem setahun kemudian. is targeted in Q1 in 2015 in the amount of 115 million
Indonesia Company (Cico) melalui 4 (empat) production (CiCo) through 4 (four) production sharing contracts, Rencana produki awal dari Lapangan Bangka di cubic feet per day (MMSCFD) and condensate of
sharing contract yaitu: KKS Ganal, Rapak, Makassar which are: PSC Ganal, Rapak, Makassar Strait, and targetkan pada kuartal Pertama tahun 2015 sebesar 6,000 barrels condensate per day (BCPD). Next, gas
Strait dan Muara Bakau. Proyek ini menyangkut Muara Bakau. This Project covers the development 115 juta kaki kubik per hari (MMSCFD) dan kondensat production will reach the peak production in 2017 with
pengembangan 5 (lima) lapangan yaitu Lapangan of 5 (five) fields which are Gendalo field, Maha field, sebesar 6.000 barel per hari (barrel condensate per production level of 924 MMSCFD and condensate of
Gendalo, Maha, Gandang, Gehem dan Bangka dengan Gandang field, Gehem field, and Bangka field with day/BCPD). Selanjutnya produksi gas akan mencapai 23,000 BCPD.
perkiraan cadangan 2.323 miliar kaki kubik (BSCF) gas reserve estimation of 2,323 billion cubic feet (BSCF) puncak pada tahun 2017 dengan tingkat produksi
dan 44,5 juta barel (MMSTB) kondensat. Kedalaman gas and 44.5 million barrels (MMSTB) condensate. sebesar 924 MMSCFD dan kondensat sebesar 23.000
lapangan tersebut berkisar 975m - 1785m di bawah The depth of the field is approximately 975m - 1785m barel per hari (BCPD).
permukaan laut. below the sea level.
Kelima lapangan akan dikembangkan secara All fields will be developed and integrated to fulfill
terintegrasi untuk memenuhi kebutuhan gas domestik the domestic gas demand and LNG Bontang field. In Fasilitas Produksi West Seno
dan Kilang LNG Bontang. Pada 5 (lima) lapangan those 5 (five) fields, CiCo will develop 28 wells, which West Seno Production Facility
tersebut, CiCo akan mengembangkan 28 sumur, yang will be integrated through 2 (two) floating production
kemudian diintegrasikan melalui dua floating production unit (FPU) hub and subsea tie back. The 2 (two) FPU
unit (FPU) hub dan satu subsea tie-back. Dua FPU hub hubs are Gendalo hub which will facilitate Gendalo
tersebut adalah Hub Gendalo yang merupakan fasilitas field, Maha, and Gandang in 2,200 - 5,600 feet depth
yang akan mengintegrasikan Lapangan Gendalo, Maha, and Gehem hub which is production facility of Gehem
dan Gandang di kedalaman 2.200 sampai 5.600 kaki dan field in 6,000 feet depth. Bangka field in 3,200 feet
Hub Gehem yaitu fasilitas produksi Lapangan Gehem depth will be the subsea tie back to the existing FPU
di kedalaman 6.000 kaki. Lapangan Bangka pada West Seno and operated by Chevron. To build and
kedalaman 3.200 kaki akan menjadi subsea tie-back ke develop the field, it is estimated to spend the budget
FPU West Seno yang sudah ada dan dioperasikan oleh between US$4 billion until US$7 billion.
Chevron. Untuk membangun dan mengembangkan In December 2011, CiCo has completed Front-
lapangan tersebut, diperkirakan akan menghabiskan End Engineering Design (FEED) of Bangka field, while
anggaran sebesar US$4 miliar hingga US$7 miliar. FEED for Gendalo-Gehem is expected to be completed
Pada Desember tahun 2011, CiCo telah in April 2012. The Final Investment Decision (FID) of
menyelesaikan Front-End Engineering Design (FEED) Bangka field is expected to be executed in 2013,
Lapangan Bangka, sedangkan FEED untuk Gendalo- while FID of Gendalo hub and Gehem is expected a
Gehem diharapkan dapat diselesaikan pada April tahun
2012. Keputusan final investasi atau Final Investment
Decision (FID) Lapangan Bangka diharapkan dapat
04. Proyek Utama 2011 04. Main Projects 2011 94 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 95
C. Lapangan Abadi Inpex Masela sebagai operator blok tersebut Inpex Masala as the block
operator plans to produce gas
berencana memproduksikan gas sebanyak
in the amount of 3.64 Trillion
3,64 triliun kaki kubik ( Trillion Cubic Feet/ Cubic Feet (TFC) and 91.02
TCF) dan 91,02 juta barel (MMSTB) kondensat million barrels condensate
(MMSTB) for 30 years through
Abadi Field selama 30 tahun melalui enam sumur produksi.
6 production wells.
Lapangan Abadi di Blok Masela terletak di lepas Abadi field in Masela block which located on offshore
Lapangan Abadi
pantai Laut Arafura memiliki cadangan gas yang Arafuru Sea has significant amount of gas reserve. Inpex
Abadi Field
cukup besar. Inpex Masela sebagai operator blok Masala as the block operator plans to produce gas in
tersebut berencana memproduksikan gas sebanyak the amount of 3.64 Trillion Cubic Feet (TFC) and 91.02
3,64 triliun kaki kubik (Trillion Cubic Feet/TCF) dan million barrels condensate (MMSTB) for 30 years through
91,02 juta barel (MMSTB) kondensat selama 30 tahun 6 production wells.
melalui enam sumur produksi. The first POD of Abadi field has been approved by
Rencana pengembangan (POD Pertama) the Ministry of Energy and Mineral Resources in the end
Lapangan Abadi telah disetujui Menteri Energi dan of 2011, which is through floating LNG facilities with the
Sumber Daya Mineral (ESDM) pada akhir tahun 2011, capacity of 2.5 millions of tons per year (MTPA). This
yaitu melalui pembangunan fasilitas kilang LNG facility will be the first in the world.
terapung (floating LNG facilities) berkapasitas 2,5 juta The project development is estimated to cost
ton per tahun (MTPA). Fasilitas ini merupakan yang US$4.99 billion. The production is expected to start in
pertama di dunia. 2016 with the average production of 335 MMSCFD. In
Pengembangan proyek diperkirakan akan the early stage of production, it is estimated that the
menghabiskan dana sebesar US$4,99 miliar. average produced condensate is 7,106 barrels per day
Ditargetkan, kegiatan produksi dapat dimulai pada (BCPD). However, this will be increased gradually to
tahun 2016 dengan rata-rata produksi sebesar 335 8,194 BCPD between the year of 2020 - 2041.
MMSCFD. Pada awal masa produksi, diperkirakan Until the end of 2011 BPMIGAS and Inpex are still
kondensat yang diproduksikan rata-rata sebesar 7.106 conducting evaluation tender technique of EPC and
barel kondensat per hari (Barrel Condensate Per Day/ Subsea construction, Umbilicals, Risers and Flow-lines
BCPD), namun akan ditingkatkan secara bertahap (SURF).
menjadi 8.194 BCPD pada periode 2020 hingga 2041.
Sampai akhir tahun 2011 BPMIGAS dan Inpex
masih melakukan evaluasi teknis tender EPC
dan Subsea construction, Umbilicals, Risers and
Flow-lines (SURF).
04. Proyek Utama 2011 04. Main Projects 2011 96 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 97
Pengembangan Lapangan Kepodang di Jawa The Kepodang field development in Central Java Sampai akhir tahun 2011, BPMIGAS sedang Until the end of 2011, BPMIGAS was conducting
Tengah, oleh Petronas Carigali Muriah bertujuan untuk by Petronas Carigah Muriah is designated to produce melakukan pembahasan perjanjian jual beli gas (Gas the negotiation of Gas Sales Agreement (GSA) and
memproduksikan gas sebesar 354 miliar kaki kubik gas of 354 Billion Cubic Feet (BFC) from 10 wells. Sales Agreement/GSA) dan perjanjian pengangkutan Gas Transportation Agreement (GTA) in terms of gas
(BCF) dari 10 sumur. Gas akan didedikasikan untuk The gas will be dedicated to support Tambak Lorok gas (Gas Transportation Agreement/GTA) dalam rangka pricing agreement, toll fee, and each party’s liability.
menunjang kebutuhan pembangkit listrik tenaga gas Steam Gas Electricity Power Plant (PLTGU) owned by menyepakati harga gas, biaya pengangkutan (toll fee)
uap (PLTGU) Tambak Lorok milik PT Perusahaan PT PLN. The allocation of gas for power plant is the dan tanggung jawab masing-masing pihak (liability).
Listrik Negara. Pengutamaan gas untuk pembangkit implementation of government’s commitment in fulfilling
listrik merupakan wujud komitmen pemerintah dalam domestic gas demand and also to suppress subsidy for
pemenuhan kebutuhan gas domestik sekaligus electricity sector.
Lapangan Kepodang
menekan besaran subsidi untuk sektor kelistrikan. The Plan of Development I (POD I) Kepodang Kepodang Field
Rencana pengembangan (POD I) Lapangan field has been approved by the Minister of Energy
Kepodang telah disetujui Menteri ESDM pada tahun and Mineral Resources (ESDM). However, during
2005. Namun dalam perkembangannya, dilakukan the development, there have been alteration of plan
perubahan rencana dari sebelumnya menggunakan from the previous plan which used upstream scheme
skema hulu menjadi skema hilir. Revisi POD baru to downstream scheme. The new revision of POD
disetujui Menteri ESDM pada tahun 2010. Kepodang field has been approved by the Minister of
Perhitungan keekonomian proyek diperoleh Energy in 2010.
dengan memperhitungkan laju alir gas sebesar 130 The project economic calculation is obtained by
MMSCFD selama 5 (lima) tahun dari masa produksi 10 calculating gas acceleration delivery in the amount of
tahun. Untuk mempertahankan keekonomian proyek, 130 MMSCFD for 5 (five) years from 10 year production
pada tahun 2011 Menteri ESDM menyetujui masa schedule. To maintain the economy of the project, in
produksi tetap diberikan selama 10 tahun sehingga 2011 the Minister of Energy and Mineral Resources
Petronas mendapat perpanjangan masa operasi approved production schedule of 10 years so that
selama 3 (tiga) tahun untuk menggantikan waktu Petronas obtains the operation extension schedule
yang hilang pada masa pembahasan. Keputusan for 3 (three) years to replace the lost time during the
ini memberikan kepastian bagi investor terhadap consideration period. This decision will assure the
pengembalian investasinya sekaligus menguntungkan investor about the ROI (Return of Investment) and at
Pemerintah karena mendapatkan pasokan gas untuk the same time provide benefit for government because
pembangkit listrik yang dapat mengurangi subsidi it obtains gas supply for power plant which can
Pemerintah untuk listrik. decrease government subsidy for electricity.
04. Proyek Utama 2011 04. Main Projects 2011 100 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 101
F. Lapangan Terang- Lapangan Terang Sirasun Batur (TSB) tersebut Terang-Sirasun-Batur (TSB)
field is estimated to produce
diperkirakan akan memproduksikan gas
Sirasun-Batur gas in the amount of 315
sebesar 315 MMSCFD mulai Juni 2012, dari MMSCFD starting from
Terang-Sirasun-Batur Field 9 (sembilan) sumur. June 2012 derived from
9 (nine) wells.
Lapangan Terang Sirasun Batur (TSB) terletak di Terang Sirasun Batur Field (TSB) located in
perairan Timur Madura, Jatim, merupakan bagian dari East Madura sea, Eastern Java, is part of Kangean
Blok Kangean yang dikelola oleh Energi Mega Persada Block operated by Energi Mega Persada (EMP). The
(EMP). Rencana pengembangan Lapangan TSB telah development plan of TSB has been approved by the
disetujui Menteri ESDM pada tahun 2005. Minister of Energy and Mineral Resources in 2005.
Lapangan tersebut diperkirakan akan The field is estimated to produce gas in the amount
memproduksikan gas sebesar 315 MMSCFD mulai of 315 MMSCFD starting from June 2012 derived from
Juni 2012, dari 9 (sembilan) sumur, sehingga volume 9 (nine) wells, so that the amount of produced gas is
gas yang diproduksikan sekitar 839 miliar kaki kubik 839 Billion Cubic Feet (BSCF). All gas will be allocated
(BSCF). Semua gas akan digunakan untuk memenuhi to fulfill progressive gas demand in East Java.
kebutuhan gas daerah Jawa Timur yang semakin To support production activity, EMP will operate
meningkat. Floating Production Unit (FP) BW Joko Tole ship.
Untuk mendukung kegiatan produksi, EMP akan The ship has gas compressive capacity of 340 million
mengoperasikan kapal Floating Production Unit (FPU) cubic feet per day and oil reserve capacity of 200,000
BW Joko Tole. Kapal yang memiliki kapasitas kompresi barrels. The construction of production equipment in
gas sebesar 340 juta standar kaki kubik per hari dan the ship is conducted in Batam.
fasilitas penampung minyak sebesar 200.000 barel.
Pekerjaan pembangunan peralatan produksi yang
berada di kapal tersebut dikerjakan di Batam.
04. Proyek Utama 2011 04. Main Projects 2011 102 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 103
G. Proyek Senoro Donggi Pengembangan Proyek Senoro Donggi The development of Senoro
Donggi project is expected
dimaksudkan untuk mengembangkan
to develop Senoro gas
Lapangan Gas Senoro dan lapangan-lapangan field and other fields in
Senoro Donggi Project lain di area Matindok. Mantindok area.
Pengembangan Proyek Senoro Donggi The development of Senoro Donggi project is sudah selesai dilaksanakan dengan perkiraan biaya development that is increased to 20% from the
dimaksudkan untuk mengembangkan Lapangan Gas expected to develop Senoro gas field and other fields pengembangan meningkat 20% terhadap POD approved POD. BPMIGAS is still evaluating the cost
Senoro dan lapangan-lapangan lain di area Matindok the Mantindok area (Mantindok, Maleoraja, Minahaki, disetujui. BPMIGAS masih melakukan evaluasi increase. It is planned that the project will be started
(Matindok, Maleoraja, Minahaki dan Donggi). Gas yang and Donggi). The produced gas will be used to fulfill terhadap kenaikan biaya tersebut. Direncanakan at the beginning of March 2012 so that the early
akan diproduksikan, akan digunakan untuk memenuhi the needs of LNG Donngi Senoro (DS) refinery with proyek dapat mulai dilaksanakan pada awal Maret production of gas can be started in 2014.
kebutuhan Kilang LNG Donggi Senoro (DS) dengan the capacity of 2.5 million tons per year or equivalent 2012 sehingga produksi awal gas dapat dimulai pada
kapasitas 2,5 juta ton per tahun atau setara 300 juta to 300 million British Thermal Unit Per Day (BBTUD) tahun 2014. B. The Fields Development in Matindok Area
British Thermal Unit per hari (BBTUD), untuk memasok to supply gas demand of PT PLN of 60 BBTUD and The fields of gas in Matindok Areas consist of Dongi
kebutuhan gas pembangkit PT Perusahaan Listrik fertilizer factory PT Panca Amara Utama, the subsidiary B. Pengembangan lapangan-lapangan field, Matindok, Maleo Raja, Minahaki, Sukamaju, and
Negara sebesar 60 BBTUD dan untuk pabrik pupuk company of PT Surya Eka Perkasa, Ltd in the amount di Area Matindok. Mentawai. The fields are under the working area of
milik PT Panca Amara Utama, anak usaha PT Surya of 55 BBTUD Lapangan-Lapangan gas di Area Matindok PT. Pertamina EP which is operated by PT. Pertamina
Eka Perkasa Tbk sebesar 55 BBTUD. terdiri dari Lapangan Dongi, Matindok, Maleo Raja, itself. It is estimated the fields contain the reserve of
A. Senoro Field Development. Minahaki, Sukamaju dan Mentawa. Seluruh lapangan 638 BSCF. The gas production is estimated to be 459
A. Pengembangan Lapangan Senoro. Senoro field, which is located in Senoro Toili berada di wilayah kerja PT Pertamina EP yang dikelola BSCF, while condensate production is estimated to
Lapangan Senoro berada di Wilayah Kerja Senoro working area, is operated by JOB Pertamina Medco oleh PT Pertamina EP sendiri. Diperkirakan lapangan- be 2.47 millions of barrels (MMSTB). To support the
Toili, dioperasikan oleh JOB Pertamina Medco Tomori Tomori Sulawesi (PMTS). The gas reserve in the field lapangan tersebut menyimpan cadangan sebesar field development, it is planned to conduct drilling and
Sulawesi (PMTS). Cadangan gas pada lapangan is estimated around 1.6 Trillion Cubic Feet (TSCF). 638 BSCF. Produksi gas diperkirakan sebesar 459 completion 19 development wells.
ini diperkirakan sekitar 1,6 triliun kaki kubik (TSCF). Meanwhile, the gas volume which is able to produce BSCF, sementara produksi kondensat diperkirakan In the end of 2011, the development plan of CPP
Sementara volume gas yang dapat diproduksikan until the end of PSC in 2027 is estimated about 1.3 sebesar 2,47 juta barel (MMSTB). Untuk mendukung Dongi was still in the EPC procurement process.
sampai akhir PSC pada tahun 2027 diperkirakan billion cubic feet (BSCF) or equal to 1.43 Trillion British pengembangan lapangan, rencananya akan dilakukan However, the project development is estimated to
sebesar 1,3 miliar kaki kubik (BSCF), atau setara 1,43 Thermal Unit (TBTU). The field will also produce pemboran dan komplesi 19 sumur pengembangan. start in July 2012. Meanwhile, development process of
Triliun British Thermal Unit (TBTU). Lapangan tersebut condensate for approximately 19.4 millions of barrels Pada akhir tahun 2011, rencana pembangunan CPP Matindok is still in pre-qualification process and
juga akan memproduksikan kondensat sekitar 19,4 (MMSTB). CPP Donggi masih dalam tahapan lelang EPC. Namun planned to be completed in January 2013. Pertamina
juta barel (MMSTB). To support the production activity, the drilling pembangunan proyek diperkirakan dapat dimulai also plans that the first production is able to be
Untuk mendukung kegiatan produksi, akan process will be conducted to 16 new wells and pada Juli 2012. Sementara proses pembangunan implemented in the 4th quarter of 2014.
dilakukan pemboran 16 sumur baru dan pengembangan development of 5 (five) existing work over wells. CPP Matindok, masih pada tahap prakualifikasi, dan
5 (lima) sumur existing yang di-workover. Selain itu Besides, a few production facilities that will be built are direncanakan dapat diselesaikan pada bulan Januari
juga akan dibangun beberapa fasilitas produksi yang Central Processing Facility (CPF), 30 inch-diameter- 2013. Pertamina juga merencanakan, produksi
terdiri dari: Central Processing Facility (CPF), Pipa pipe for 27 Km, Condensate Jetty Terminal and perdana dapat direalisasi pada pada kuartal keempat
berdiameter 30 inci sepanjang 27 Km, Condensate supporting facility. tahun 2014.
Jetty Terminal dan Fasilitas penunjang. Until the end of 2011, the execution of FEED for
Sampai akhir tahun 2011 pelaksanaan FEED untuk Central Processing Platform (CPP) 2 x 155 MMSCD
Central Procesing Platform (CPP) 2 x 155 MMSCFD has been completed with the cost estimation of
04. Proyek Utama 2011 04. Main Projects 2011 104 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 105
H. Lapangan Gajah Baru, Rencana pengembangan Lapangan Gajah The development plan of Gajah
Baru field, Iguana, and Naga in
Baru, Iguana dan Naga di West Natuna oleh
Iguana dan Naga West Natuna by Premier West
Premier West Natuna telah disetujui Menteri Natuna has been approved
Gajah Baru, Iguana and ESDM pada April 2008. by the Minister of Energy and
Mineral Resources in April
Naga Field
2008.
Rencana pengembangan Lapangan Gajah Baru, The development plan of Gajah Baru field, Iguana,
Rencana Pengembangan Lapangan Gajah Baru, Iguana, dan Naga
Iguana dan Naga di West Natuna oleh Premier West and Naga in West Natuna by Premier West Natuna has
Development Plan of Gajah Baru, Iguana and Naga Field
Natuna telah disetujui Menteri ESDM pada April been approved by the Minister of Energy and Mineral
2008. Pengembangan lapangan-lapangan tersebut Resources in April 2008. The fields development is
diperkirakan dapat memproduksikan 351 Triliun estimated to produce 351 Trillion British Thermal Unit
British Thermal Unit (TBTU) gas melalui 5 (lima) sumur (TBTU) gas through 5 (five) production wells and CPP.
produksi dan CPP. The peak production is estimated to reach
Puncak produksi diperkirakan sebesar 125 125 BBTUD for 4 (four) years with the production
BBTUD selama 4 (empat) tahun dengan lama produksi schedule of 11 years. To support the field economy,
sekitar 11 tahun. Untuk mendukung keekonomian the produced gas will be used to fulfill domestic and
lapangan, gas yang diproduksikan akan digunakan export demand. In details, the gas volume which will
untuk memenuhi kebutuhan dalam dan luar negeri. be exported is approximately 90 BBTUD, while the
Secara rinci, volume gas yang akan diekspor sekitar 90 amount delivered to support the operation of PLN
BBTUD, sedang yang dimanfaatkan untuk mendukung Muara Tawar is 40 BBTUD through swap mechanism
operasi PLN Muara Tawar sebesar 40 BBTUD melalui signed by the Minister of Energy and Mineral Resources
mekanisme swap yang ditandatangani Menteri ESDM on 26th October 2011. In October 2011, this field has
pada 26 Oktober 2011. Pada Oktober 2011, lapangan started to produce with the initial production level of
ini telah mulai diproduksikan dengan tingkat produksi 50 MMSCFFD and will be ramped-up until plateau rate
awal sekitar 50 MMSCFD dan akan ramp-up hingga of 125 BBTUD.
plateau rate 125 BBTUD.
I. Suban Bypass, Wilayah Suban Bypass merupakan proyek Suban Bypass is a production
facility development project
pengembangan fasilitas produksi yang telah
Kerja: Corridor, KKKS: which has been existed
ada di Lapangan Suban (Corridor Block) yang
ConocoPhillips Grissik dioperasikan oleh ConocoPhillips Grissik.
in Suban field (Corridor
Block) that is operated by
ConocoPhillips Grissik. The
Suban Bypass, Working Area: Corridor, PSC Tujuannya, untuk mengatasi bottlenecking.
goal is to overcome the
Contractor: ConocoPhillips Grissik bottlenecking situation.
Suban Bypass merupakan proyek pengembangan Suban Bypass is a production facility development
fasilitas produksi yang telah ada di Lapangan project which has been existed in Suban field (Corridor
Suban (Corridor Block) yang dioperasikan oleh Block) that is operated by ConocoPhillips Grissik.
ConocoPhillips Grissik. Tujuannya, untuk mengatasi The goal is to overcome the bottlenecking situation
bottlenecking pada fasilitas yang telah ada, agar existed in previous facility so that the production
produksi dari lapangan tersebut dapat ditingkatkan from that field is able to increase from 700 MMSCFD
dari 700 MMSCFD menjadi 780 MMSCFD. to be 780 MMSCFD.
Kegiatan ini didorong oleh adanya tambahan This activity is encouraged with the additional
produksi dari Lapangan Suban untuk menggantikan production from Suban field to replace gas supply
pasokan gas yang harus dipasok ke GSPL (Gas which has to be delivered to GPSL (Gas Singapore Pipe
Singapore Pipe Line). Pada Desember 2011, Proyek Line). In December 2011, Suban By Pass Plant project
Suban By Pass Plant di Sumatera Selatan ini telah in South Sumatra has produced gas of 45 MMSCFD
memproduksikan gas sebesar 45 MMSCFD dan and condensate of 600 barrels per day.
kondensat sebesar 600 barrel per hari.
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 108 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 109
05 Pemberdayaan
kapasitas Nasional
Empowerment of National Capacity
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 110 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 111
Upaya memaksimalkan penggunaan komponen The effort to maximize the utilization local content
Penghematan Pengadaan Bersama (US$ Juta) Optimalisasi Pemanfaatan Asset KKKS (US$ Juta)
dalam negeri merupakan komitmen untuk mendorong is a commitment to support the growth of national
Efficiency of Joint Procurement (US$ Million) Optimization of PSC Contractors’ Asset Use (US$ Million)
pertumbuhan industri barang dan jasa nasional. domestic good and service. From total value of
Dari total nilai pengadaan barang dan jasa sebesar goods and services procurement of US$11.81 billion
Target Realisasi Target Realisasi
US$11,81 miliar sepanjang 2011, penggunaan during 2011, the local content obtained the biggest Target Realization Target Realization
komponen dalam negeri mendapat porsi terbesar yaitu portion, which was 60.63%. The utilization of Local
60,63%. Penggunaan komponen dalam negeri (TKDN) Content (TKDN) for services area reached US$81.09
untuk pengadaan jasa mencapai US$81,09 miliar billion while the usage of local content for goods 100 50
70,9 34,8
Pemanfaatan Barang dan Jasa Dalam Negeri 60 30
Barang Jasa %TKDN 30,3
Utilization of Domestic Goods and Services Goods Service %Local Content 27,5
50 25 25
40 20
5.408
8.000 40%
6.568
5.862
6.000 4.737 30%
Untuk menjaga efisiensi belanja hulu migas To maintain the budget efficiency for upstream
lebih, BPMIGAS mengkoordinir Kontraktor KKS oil and gas industry, BPMIGAS coordinates with
4.000 20%
3811 3706
agar melakukan penghematan melalui mekanisme PSC Contractors to conduct efficiency through joint
3577
pengadaan bersama dan optimalisasi pemanfaatan procurement mechanism and asset utility optimization.
2.000 10%
1846 aset. Pada tahun 2011, BPMIGAS berhasil In 2011, BPMIGAS was able to save US$123.12 million
995 1400
melakukan penghematan hingga US$123,12 juta dari from the mechanism.
0 0
mekanisme tersebut.
2006 2007 2008 2009 2010 2011
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 112 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 113
pengadaan barang dan jasa transaction in upstream oil and 41% Mandiri US$77.1 million
di industri hulu minyak dan gas industry and to reserve
Tahun 2011 dana BNI US$44.2 million
gas bumi serta penyimpanan long term Abandonment and
dana Abandonment and Site
ASR yang tersimpan di Site Restoration (ASR) fund. 6% BNI + Mandiri US$16.1 million
Restoration (ASR) dalam bank nasional mencapai Since 2009 to 2011, the value of 19%
jangka panjang. Sejak 2009 US$232 juta. transaction conducted through
hingga 2011, nilai transaksi State-Owned Enterprises
yang dilakukan melalui Bank (BUMN) banks (Mandiri,
ASR fund that kept in national commercial
BUMN (Bank mandiri, BNI dan bank until third quarter on 2011 have reached BNI, and BRI) has reached
BRI) telah mencapai US$14 US$232 million US$14 billion.
Alokasi Dana ASR (per 31 Desember 2011)
miliar. Meanwhile, the ASR fund
ASR Funding Allocation (per 31 December 2011)
Sementara dana ASR yang reserved in BUMN banks in
disimpan di bank BUMN tahun 2011 telah mencapai 2011 has reached US$232 million. BPMIGAS expects
US$232 juta. Harapan BPMIGAS, aktivitas industri that the activity of upstream oil and gas industry is fully US$ Juta US$ Million
hulu migas dapat sepenuhnya ditunjang oleh Bank supported by BUMN banks so that the opportunity for
BUMN, sehingga kesempatan bagi pengusaha national business executives in upstream oil and gas 2009 132
nasional untuk turut berkiprah di industri hulu migas industry may also increase.
juga meningkat.
2010 167
2011 - Q3 232
0 250
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 114 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 115
D. Pengelolaan SDM KKS Tahun 2011 jumlah tenaga kerja di Kontraktor In 2011, the number of
employee in Production
KKS Produksi mencapai 24.730 orang, naik 9%
PSC Contractors have
dari tahun sebelumnya. reached 24.730 people,
increased 9% from the
previous year.
PSC’s Human Resource Management
Tenaga Kerja Employee Sementara pada Kontraktor KKS eksplorasi, While in Exploration PSC Contractors, the number
Secara kumulatif, pada tahun 2011 jumlah Cumulatively, in 2011, the number of employee jumlah tenaga kerja turun 18% dibanding tahun of employee decreased 18% compare to 2010. In
tenaga kerja di Kontraktor KKS Produksi mencapai in Production PSC Contractors have reached 24,730 2010. Rinciannya jumlah TKI turun dari 1.601 orang details, the number of Indonesian workers decreased
24.730 orang, naik 9% dibanding tahun 2010. Jumlah people, increased 9% compare to 2010. The number menjadi 1.305 orang, dan jumlah TKA naik dari 152 from 1,601 employees to 1,305 employees. Moreover,
Tenaga Kerja Indonesia (TKI) pada tahun 2011 of Indonesian worker (TKI) in 2011 was recorded as orang menjadi 183 orang. Penurunan jumlah TKI the number of foreign employees increased from 152
tercatat sebanyak 23.938 orang atau 96% dari total many as 23,938 people or 96% of the total employees dikarenakan perubahan status KKKS yang sebelumnya employees to 183 employees. The decrease number
jumlah tenaga kerja di Kontraktor KKS Eksplorasi dan in Exploration and Production PSC Contractors. status masih dalam tahap Eksplorasi menjadi tahap of Indonesian workers is caused by status alteration
Produksi. Sementara jumlah tenaga kerja asing pada Meanwhile, the number of foreign employee in 2011 is pengembangan/Development. of PSC Contractors from exploration phase to
tahun 2011 sebanyak 792 orang atau 4% saja. 792 people or 4% only. Hasil pembahasan anggaran ketenagakerjaan development phase.
2012 yang merupakan bagian dari WP&B menunjukkan The result of budget meeting of employment 2012
peningkatan jumlah TKI dan TKA yang signifikan, as part of WP&B indicates the significant increase
dimana jumlah TKI akan meningkat sekitar 11% from Indonesian Workers (TKI) and Foreign Workers
(rekrutmen 2.813 pekerja) dan TKA akan meningkat (TKA), which the number of Indonesian workers will
Jumlah TKI & TKA Tahun 2011 KKKS Produksi Jumlah TKI & TKA Tahun 2011 KKKS Eksplorasi 20% (rekrutmen 195 pekerja). Rekrutmen relatif besar increase 11% (recruitment of 2,813 employees) and
Number of Domestic & Overseas Workers Number of Domestic & Overseas Workers umumnya dilakukan oleh Kontraktor KKS yang akan foreign workers will increase 20% (recruitment of
in 2011, Production PSC Contractors in 2011, Exploration PSC Contractors
melaksanakan proyek-proyek besar merupakan 195 workers). Relatively, the significant number of
20.491 1.344 kelanjutan tahun 2011 (Mobil Cepu Ltd., BP Indonesia, recruitment generally is conducted by PSC contractors
2006 2006
792 277 dan Inpex Masela). who will conduct major projects which are the
21.277 1.637
continuity from 2011 (Mobil Cepu Ltd, BP Indonesia,
2007 2007
783 249 and Inpex Masela).
21.492 2.176
2008 2008
714 246
21.520 2.233
2009 2009
649 252
21.727 1.601
2010 2010
776 152
23.938 1.305
2011 2011
792 183
26.602 1.454
2012 2012
978 192
Grafik Nilai Akhir Evaluasi Kinerja Pengelolaan SDM KKKS 2011 di 26 KKKS Produksi
Final Mark Graphic of Human Resource Evaluation in PSC Contractors 2011 in 26 Production PSC Contractors
Skala Produksi < 50.000 BOEPD Production Scale < 50,000 BOEPD
0,26
Santos 7,15
6,89
0,20
Hess 6,96
6,76
0,15
Energi Mega Persada 6,90
6,75
0,00
Star Energy 6,86
6,86
0,00
PHE-WMO 6,44
6,44
0,00
Lapindo Brantas 6,28
6,28
Evaluasi Kinerja Pengelolaan SDM KKKS Performance Management Evaluation in PSC 0,00
Premier Oil 6,04
Penilaian Kinerja Pengelolaan SDM KKKS Contractors’ Human Resource 6,04
0,00
tahun 2011 dilakukan pada 26 KKKS berstatus The evaluation of PSC Contractors’ Human Kangen Energy Indonesia 6,03
6,03
produksi. Parameter yang digunakan sama dengan Resources Management in 2011 done to 26 PSC BOB-BSP Pertamina Hulu
0,00
5,76
5,76
pada tahun 2010, di mana seluruh parameter Contractors with production status. The parameter
0,00
CITIC Seram
merupakan bagian terintegrasi dari Human Resources used is the same as the one in 2010, which the whole 5,75
5,75
Framework yang lebih lengkap, parameter tersebut parameter is an integrated part of an advance Human JOB Talisman (OK)
0,00
5,37
5,37
dimulai dari Manpower Planning & Staffing sampai Resources Framework, started from Manpower 0,00
Kalrez Petroleum 3,95
dengan Termination (disebut parameter Kelompok Planning & Staffing until Termination (referred as Career 3,95
0,00
Career Development Monitoring), termasuk Development Monitoring group), including considering Energy Equity EPIC 2,60
2,60
mempertimbangkan aspek Hubungan Industrial dan Industrial Relations aspect and compliance from Petroselat
0,00
1,31
1,31
compliance dari sisi RPTK dan Pengelolaan TKA RPTK side and TKA management (referred as Human
(disebut parameter Kelompok Human Resources Resources Group Compliance parameter), adjusted
Compliance), yang disesuaikan dengan konteks with the activity of upstream oil and gas industry in Skala Produksi > 50.000 BOEPD Production Scale > 50,000 BOEPD
kegiatan industri hulu Migas di Indonesia. Indonesia. -0,05
Medco E&P Indonesia 8,27
Untuk Kelompok Career Development Monitoring, For Career Development Monitoring Group, 8,32
-0,46
development opportunities berurut dari Key Player development opportunities are consecutive from Total E&P Indonesie 7,69
8,15
Management (46%), Competency Management (39%), Key Player Management (46%), Competency ConocoPhillips Indonesia
-0,55
7,50
8,05
Performance Management (37%), Compensation & Management (39%), Performance Management (37%), -0,46
Vico Indonesia
Benefit Management (36%) dan Manpower Planning Compensation and Benefit Management (36%) and
7,72
8,18
& Staffing (36%). Sedangkan pada Kelompok Human Manpower Planning & Staffing (36%). Meanwhile, in Chevron Indonesia Co.
-0,35
7,53
7,88
Resources Compliance, berurut adalah Expatriate Human Resource Compliance group are Expatriate -0,76
Chevron Pacific Indonesia 7,52
Management (54%), RPTK Compliance (36%) dan Management (54%), RPTK Compliance (36%) and 8,28
-0,36
Industrial Relation (30%). Hasil evaluasi keseluruhan Industrial Relation (30%). The whole evaluation result of BP Berau 7,45
7,81
penilaian kinerja pengelolaan SDM tahun 2011 adalah Human Resources performance in 2011 is as follows: PHE-ONWJ
-0,00
7,24
7,24
sebagai berikut: • Blue Prediction (Exellent): None, similar to 2010 -0,00
Pertamina EP 7,11
• Predikat Biru (sangat baik): Tidak ada, sama seperti • Green Prediction (Good): Only 1 (one) PSC 7,11
-0,00
tahun 2010. Contractor, decreased compare to 2010 which was CNOOC 7,06
7,06
• Predikat Hijau (baik): Hanya 1 (satu) KKKS, berkurang 6 (six) PSC Contractors. -0,00
ExxonMobil Oil Indonesia 6,92
dibanding tahun 2010 sebanyak 6 (enam) KKKS. 6,92
-0,00
Petrochina 4,15
4,15
-1 0 1 2 3 4 5 6 7 8
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 118 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 119
• Predikat Kuning (cukup): 18 (delapan belas) KKKS, • Yellow Prediction (Average): 7 (seven) PSC
Program Pengembangan TKI 2008-2011
bertambah dibanding tahun 2010 sebanyak 11 Contractors, decreased compare to 2010 which TDE Job Assignment Job Swapping Internationalization
Indonesian Worker Program in 2008-2011
(sebelas) KKKS was 11 (eleven) PSC Contractors.
• Predikat Merah (kurang): 7 (tujuh) KKKS, berkurang • Red Prediction (Poor): 7 (seven) PSC Contractors,
dibanding tahun 2010 sebanyak 10 (sepuluh) KKKS. decreased from 2010 which was 10 PSC Contractors. 224
204
Dalam rangka pengembangan TKI, BPMIGAS In terms of Indonesian worker development,
mendorong KKKS agar lebih aktif mengirimkan BPMIGAS encourages PSC Contractors to be more
TKI untuk mengikuti program penugasan proactive in sending Indonesian workers to international
internasional (TDE, Job Assignment, Job Swapping assignment program (TDE, Job Assignment, Job
128
& Internasionalisasi). Berbeda dengan tahun 2010, Swapping, & Internationalization). In contrast with the
pada tahun 2011 terjadi peningkatan jumlah TKI yang 2010, there is an increase of Indonesian workers who
mengikuti progam penugasan internasional. joined international assignment program in 2011. 85
69 72
60
55 55
44 41
36
30
14 18
10
Salah satu upaya dalam mendukung program One of the efforts to support employee
Untuk meningkatkan kualitas pengelo- pengembangan Tenaga kerja serta percepatan development program and competency acceleration
laan SDM di KKKS, BPMIGAS melaku- kompetensi di tahun 2011 adalah program National in 2011 is through an implementation of National
Capacity Building (NCB) adalah program yang bertujuan Capacity Building (NCB) Program, which is a program
kan evaluasi melalui penilaian kinerja. untuk meningkatkan Kapasitas Nasional melalui designated to increase National Capacity through
Program Percepatan Pengembangan Tenaga Kerja Employee Development Acceleration Petrotechnical
To increase the quality of PSC Contractors’ Human
Petrotechnical sebanyak 250 orang sampai dengan for 250 employees until 2014. This program is
Resources Management, BPMIGAS conducted an
tahun 2014. Program ini telah dicanangkan oleh established by BPMIGAS management in BPMIGAS
evaluation through performance assesment.
Manajemen BPMIGAS pada Raker BPMIGAS 2010. Activity Meeting 2010.
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 120 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 121
E. Pembangunan Berwawasan Tahun 2011 merupakan tahun yang cukup The year of 2011 was the
celebrated year in environment
membanggakan dalam pengelolaan
Lingkungan management due to the
lingkungan sebab untuk pertama kalinya obtain of “Golden Proper” in
industri hulu migas memperoleh “Proper Emas” upstream oil and gas industry
by Medco Indonesia E&P.
Environment Based Development yang didapat oleh Medco Indonesia E&P.
Perlindungan LIngkungan Environment Protection Prestasi lain dalam pengelolaan lingkungan adalah Another achievement in environment management
Tahun 2011 merupakan tahun yang cukup The year of 2011 was the celebrated year in meningkatnya jumlah persetujuan Pemerintah atas is the increase of government approval for AMDAL,
membanggakan dalam pengelolaan lingkungan sebab environment management due to the obtain of dokumen AMDAL, RKL dan RPL pada tahun 2011. RKL, and RPL in 2011. EBA document also improved
untuk pertama kalinya industri hulu migas memperoleh “Golden PROPER” in upstream oil and gas industry by Dokumen EBA juga terus bertambah secara signifikan. significantly. It suggested that the oil and gas production
“PROPER Emas” yang didapat oleh Medco Indonesia Medco Indonesia E&P by the Ministry of Environment Hal tersebut menunjukkan berlangsungnya upaya attempt has increased. Aside from that, BPMIGAS has
E&P dari Kementrian Lingkungan Hidup. Selain of Republic Indonesia. Besides, the increase occurred peningkatan produksi migas. Selain itu, BPMIGAS also produced standard regarding the liquid waste
itu terjadi peningkatan jumlah perolehan peringkat in obedient rank (Green and Blue Proper) to 69 PSC juga telah menyusun standar baku mutu limbah cair quality of Coal Bed Methane (CBM) exploration and
taat (Proper Hijau dan Biru) menjadi 69 Kontraktor Contractors in 2011 from 59 PSC Contractors in 2010. kegiatan eksplorasi dan produksi Coal Bed Methane production and started to implement oil spill handling
KKS di tahun 2011 dari sebelumnya 59 Kontraktor Meanwhile, the disobedience rank (Red and Black (CBM) dan mulai menerapkan program penanganan for Tier-2 in Q4 in 2011.
KKS di tahun 2010. Sementara peringkat yang tidak Proper) decreased from 11 PSC Contractors in 2010 tumpahan minyak (oil spill) untuk Tier-2 pada kuartal
taat (PROPER Merah dan Hitam) berkurang dari to 8 PSC Contractors in 2010. 4 tahun 2011.
sebelumnya 11 Kontraktor KKS di tahun 2010 menjadi
8 Kontraktor KKS di tahun 2010.
50 48
49
40 36
30 27
27
20 17
9
14
11 12 11 11
10
10 7 8
5 5 5
4 3 3
1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
100
2,5
80
2,0
1,96
60
1,5
1,51
40
1,0 1,11
1,06
0,99
20
0,5
0
2007 2010 2011 0
2007 2008 2009 2010 2011
05. Pemberdayaan Kapasitas Nasional 05. National Capacity Empowerment 124 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 125
Menteri ESDM tersebut. Tim taskforce tersebut has succeeded in arranging Operational Guidelines
5 KUD Karya Sejahtera Desa Tinawun, Kedunrejo, Sukorejo, Kec. Malo, 31
telah berhasil menyusun Pedoman Tatakerja no. 023/PTK/III/2009 as technical guidelines for old Kab. Bojonegoro, Jawa Timur
No. 023/PTK/III/2009 sebagai pedoman teknis wells operation.
pengusahaan sumur tua. In the meantime, until the end of 2011, it has been Total Sumur Total of Wells 146
Sementara hingga akhir 2011 telah disetujui 5 approved 5 (five) cooperation agreement between PT
perjanjian kerjasama antara PT Pertamina EP dengan Pertamina EP with 5 KUD/BUMD (Municipal/Local
5 KUD/BUMD di wilayah Jawa Tengah dan Jawa Timur Government Owned Enterprises) in Central of Java
meliputi 146 sumur. and East Java which cover 146 wells.
Untuk pengembangan lebih lanjut di luar area jawa For further development in area outside Java,
pada saat ini BPMIGAS dalam proses mengevaluasi 2 BPMIGAS is underway an evaluation process toward Pengembangan Sumur Tua di Wilayah Luar Jawa
Development of Old Wells Outside Java Area
permohonan sumur tua di daerah Kalimantan Timur 2 old well requests in East Borneo and Papua
dan Papua.
No. KUD/BUMD Lokasi Sumur Tua Jumlah Sumur
Old Wells Location Number of Wells
2 KUD Serba Usaha Pribumi Desa Klamogoen, Kab. Sorong, Papua Barat 23
Mandiri Mineral dan Energi
Kab, Sorong
06 INTERNAL
BPMIGAS
06. Internal BPMIGAS 06. Internal BPMIGAS 130 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 131
Setpim VPMR
UPI 3% 1%
3%
Beberapa tahun belakangan ini terjadi perubahan Since several years ago, there has been
paradigma pada industri hulu migas Indonesia. a paradigm shift in upstream oil and gas industry
KEU
Perubahan-perubahan tersebut menyangkut penemuan in Indonesia. The shifts relate to the surplus discovery 13% UMUM
31%
cadangan gas yang lebih banyak dibandingkan of gas reserve than the oil itself. Thus, the exploration
8 15 81
penemuan cadangan minyak bumi, kegiatan eksplorasi which was previously and mainly conducted in West,
EPH
yang sebelumnya lebih banyak dilakukan di Barat kini now is projected to East and deep sea. Furthermore, 15%
Sasaran Inisiatif Rencana
mulai mengarah ke Timur dan laut dalam, serta adanya the increase of domestic gas volume is larger than Target Initiative Kerja
penambahan volume gas untuk dalam negeri yang lebih the export. Another paradigm is the function shift of Working Plan
OPS
REN
17%
17%
besar dibanding ekspor. Paradigma lain yang tidak upstream oil and gas industry from a national exchange
dapat dipungkiri adalah perubahan fungsi industri hulu source to a national economy driver.
migas yang sebelumnya menjadi sumber devisa Negara The changes influence the performance of other Selain memfokuskan diri pada aktivitas eksplorasi Besides to focus in exploration activity, RENSTRA is
kini lebih menjadi faktor penggerak ekonomi nasional. sectors including the government’s efforts in fulfilling dan produksi, RENSTRA juga sejalan dengan strategi also in line with triple track strategy which is pro-job, pro-
Perubahan tersebut sedikit banyak mempengaruhi the target. One the efforts conducted is to increase triple track yang meliputi pro-job, pro-growth, dan pro- growth, and pro-poor to establish equitable distribution
kinerja beberapa sektor lain, termasuk mempengaruhi oil and gas reserves since they tend to decrease while poor untuk mewujudkan pemerataan pembangunan of national development in sustainable way. Pro-job
upaya pemenuhan target pemerintah pada sektor the oil and gas consumption rise. nasional secara berkelanjutan dan berkesinambungan. strategy is implemented through the expansion of local
ini. Salah satu upaya yang harus dilakukan adalah To ensure a measured and directed target Strategi pro-job dapat tercermin dari perluasan industry that supports upstream oil and gas activity so
mengusahakan peningkatan cadangan minyak dan gas achievement, BPMIGAS arranged Strategic Plan industri lokal penunjang kegiatan hulu migas sehingga that it generates employment field. Pro-growth strategy
bumi, mengingat cadangan migas terbukti cenderung (RENSTRA) as a guide for internal BPMIGAS and memperluas lapangan pekerjaan. Strategi pro-growth is reflected through the increase of investment in
semakin rendah, sementara tingkat konsumsi migas stakeholders of upstream oil and gas business in tercermin dari peningkatan investasi terhadap industri local upstream oil and gas industry including banking
semakin meningkat. acquiring the stated target of performance. RENSTRA lokal migas termasuk perbankan sehingga pembangunan so that national development may rise. The last triple
Agar upaya pencapaian target terukur dan terarah, BPMIGAS is the main guide to achieve Government’s nasional dapat terdongkrak. Strategi triple track yang track strategy, pro-poor, is represented through the
pada tahun 2011 BPMIGAS menyusun Rencana 5-year-period stated targets. RENSTRA consists of 8 terakhir yakni pro-poor tercermin dari pemberdayaan empowerment of supporting local industry that back up
Strategis (RENSTRA) sebagai acuan bagi segenap main targets explained into 15 initiatives that lead to 81 industri penunjang lokal yang mendukung upaya the effort of poverty eradication around upstream oil and
jajaran BPMIGAS dan stakeholders usaha hulu migas work plans for period of 2011 to 2015. The work plans pengentasan kemiskinan di sekitar wilayah kerja usaha gas working areas as well as in national level.
dalam mencapai sasaran kinerja yang ditetapkan. are the commitment which must be implemented and hulu migas serta dalam skala nasional. In 2011, RENSTRA has been interpreted to working
RENSTRA BPMIGAS merupakan acuan utama untuk monitored annually. Pada tahun 2011, RENSTRA telah diterjemahkan ke program by every field which is monitored every month.
mencapai target-target yang ditetapkan oleh Pemerintah dalam program kerja oleh setiap bidang, yang dimonitor The designated targets which have been established
dalam periode lima tahunan. RENSTRA terdiri dari 8 setiap bulan. Target-target yang telah ditetapkan dalam in Key Performance Indicator (KPI) program have been
sasaran utama yang dijabarkan dalam 15 inisiatif yang Key Performance Indicator (KPI) bidang diterjemahkan formalized in KPI Division, head section, sub head
berujung pada 81 rencana kerja untuk periode tahun ke dalam KPI divisi, dinas, subdinas hingga staff. Pada section, to staff. In the end of the year, the performance
2011 sampai dengan 2015. Rencana kerja tersebut akhir tahun pencapaian kinerja akan dijadikan dasar achievement will be implemented as the main evaluation
merupakan komitmen yang harus dilaksanakan dan evaluasi RENSTRA, untuk menyusun program kerja of RENSTRA to draft the upcoming work programs.
dimonitor setiap tahun. pada tahun berikutnya.
06. Internal BPMIGAS 06. Internal BPMIGAS 132 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 133
1. Meningkatkan resources dan 1. Mempercepat monetasi/komersialisasi penemuan cadangan baru dari lapangan baru 1. To increase oil and gas 1. To accelerate monetization/comercialism of new reserve discovery from new field
reserves migas dan marginal resources and reserves and marginal
2. Memperkuat strategi yang dapat mendorong KKKS untuk lebih proaktif dalam melakukan 2. To strengthen strategy that may encourage PSC Contractors to be more active in doing
kegiatan eksplorasi exploration activity
2. Optimasi produksi migas 3. Revitalisasi sumur tua/suspended 2. Oil and gas production 3. Revitalization of old/suspended wells
4. Peningkatan kegiatan intensifikasi pada lapangan-lapangan potensial existing seluruh KKKS optimization 4. To increase intensification activity in all existing PSC Contractors’ potential fields
5. Optimasi realisasi proyek terhadap POD 5. To optimize POD realization project
6. Optimasi penerimaan negara dari hasil produksi migas 6. To optimize state revenue from oil and gas production
3. Optimasi biaya operasional 7. Pengadaan bersama 3. Oil and gas industry operational 7. Join procurement
industri migas 8. Pemanfaatan aset bersama cost optimization 8. Utility of joint asset
4. Meningkatkan pemberdayaan 9. Mendorong pendidikan profesional migas 4. To increase national capability 9. To support education of oil and gas professionals
kapabilitas dan kapasitas 10. Mendorong penggunaan industri lokal dalam industri migas untuk komoditas tertentu and capacity empowerment 10. To support the utility of local industry in oil and gas industry for particular commodity
nasional 11. Mendorong strategi kolaborasi dengan lembaga keuangan nasional untuk investasi dan 11. To support colaboration strategy with national finance institution for investment and funding
pendanaan sektor migas in oil and gas sector
5. Regulatory Management 12. Mendorong efektivitas regulatory framework di antara para pemangku kebijakan di 5. Regulatory Management 12. To support regulatory framework effectivity between policy fungsionary in national oil and
kegiatan usaha industri hulu migas nasional gas industry
Enabler (Capability Development) Enabler (Capability Development)
6. People 13. Meningkatkan kapabilitas dan kapasitas SDM Internal BPMIGAS dalam mengikuti tren 6. People 13. To increase capability and capacity of BPMIGAS’ internal human resources in keeping up
perkembangan industri migas with updated trend in oil and gas industry
7. Process 14. Optimasi proses kerja dan sistem manajemen BPMIGAS secara berkesinambungan 7. Process 14. To optimize continuity of BPMIGAS’ work process and management system
8. Tools 15. Mengimplementasikan sistem informasi yang terpadu dan transparan untuk internal dan 8. Tools 15. To implement integrated and transparent information system for BPMIGAS’ internal and
BPMIGAS dan KKKS PSC Contractors
B. Pengelolaan Dan Mutasi dan promosi dilakukan sebagai Mutation and promotion are
ways to develop competency
salah satu langkah dalam pengembangan
Pengembangan SDM BPMIGAS and employees’ career.
kompetensi dan juga untuk pengembangan
BPMIGAS Employees Competency
karir para pekerja.
Development
Demografi Pekerja Employee Demographic Dalam rangka pemenuhan formasi organisasi In terms of the fulfillment of organization formation
Pada akhir tahun 2011, pekerja BPMIGAS In the end of 2011, BPMIGAS’ employees are 865 karena adanya pemekaran di tahun 2010, pada due to the expansion in 2010, in that year, BPMIGAS
berjumlah 865 pekerja yang terdiri dari 761 Pekerja employees; consist of 761 full time employees and 164 tahun 2011 BPMIGAS merekrut 126 pekerja baru dari recruited 126 new employees from various disciplines
Tetap dan 164 Pekerja Tidak Tetap. Komposisi pekerja temporary employees. The composition of BPMIGAS’ berbagai disiplin ilmu dan tahun pengalaman yang and experiences levels in accordance to BPMIGAS’
BPMIGAS per bidang adalah sebagai berikut: employees per field is as follows: berbeda sesuai dengan kebutuhan BPMIGAS. Sekitar requirement. It was about 40% newly recruited
40% pekerja baru yang direkrut memiliki pengalaman employees have the experience from Finance, Oil,
di bidang Keuangan, Perminyakan dan Auditing. and Auditing.
Komposisi Pekerja BPMIGAS Pekerja Tetap Pekerja Tidak Tetap Formasi Organisasi Pekerja dari Berbagai Disiplin Ilmu 0-5 6-10 11-15
Composition of BPMIGAS’ Workers Permanent Worker Temporary Worker Workers Organization Formation from Various Disciplines 16-20 > 20 Akumulasi Accumulation
180 20 140
165 165
159
160 153 120
125 126
119 122
15 115
140 111 100
106
101
96
Orang People
120 90 80
Orang People
84
10 78
100 60
69
76 60
80
50 40
5
60 37
46 20
44
19
40 30 0 0
20 14
Fin&Acc
Petroleum Eng
Auditing
G&G
Humas
SCM
Teknis Lain
IT
Adm
Fasilitas
Hukum
Komersial
Projek
Sekretaris
SDM
Lain-lain
SHE
8
4 2
0
Lingkungan Perencanaan Pengendalian Pengendalian Umum Evaluasi &
Pimpinan Operasi Keuangan Pertimbangan
Hukum
06. Internal BPMIGAS 06. Internal BPMIGAS 136 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 137
Dengan adanya penambahan tersebut, dalam With the additional recruitment, in the last 3 (three) telah membuat Individual Development Plan yang in the early year in which its implementation was
3 (tiga) tahun terakhir, BPMIGAS telah melakukan years, BPMIGA has recruited 505 new employees to pelaksanaannya dimonitor sepanjang tahun. monitored for the entire year.
rekrutmen sebanyak 505 pekerja baru guna strengthen the organizational capability according to 5. Beasiswa 5. Scholarship
memperkuat kapabilitas organisasi, sesuai disain organizational design in 2008. Dalam rangka peningkatan kompetensi melalui In term of competency increase through formal
organisasi tahun 2008. As the steps to develop and founding the jalur pendidikan formal, BPMIGAS memberikan education, BPMIGAS provided domestic and
Sebagai langkah pengembangan dan pembinaan employees to fulfill the organization’s needs and to beasiswa dalam negeri dan luar negeri kepada international scholarship to the highly potential
pekerja agar dapat memenuhi kebutuhan organisasi, shape the characters according to the organization’s pekerja-pekerja yang berpotensi tinggi. Tahun 2011 employees. In 2011, there were 5 employees
serta dalam rangka pembentukan karakter sesuai visi vision and mission, several efforts have been terdapat 5 pekerja yang diterima di perguruan tinggi accepted in foreign university while 4 employees
misi organisasi, dilakukan beberapa upaya, antara lain conducted, such as, through: di luar negeri dan 4 pekerja di dalam negeri. were enrolled in local university.
melalui: 1. Orientation for New Employees
1. Orientasi Pekerja Baru The new employee orientation was conducted
Orientasi pekerja baru dilakukan selama kurang for about 3 months to shape employees’ strong
lebih 3 bulan bertujuan untuk membentuk karakter characters, highly committed, loyal to organization,
pekerja yang tangguh, berkomitmen tinggi, and in accordance to BPMIGAS culture.
loyal kepada organisasi dan sesuai dengan 2. Mutation
Pengembangan Kompetensi Pekerja
budaya BPMIGAS. Mutation and promotion were conducted as one Dalam Negeri Luar Negeri
Development of Workers’ Competency Domestic Overseas
2. Mutasi of the steps to develop competence and also
Mutasi dan promosi dilakukan sebagai salah satu to develop employees’ career. Aside from
langkah dalam pengembangan kompetensi dan promotion, lateral mutation/task diversion was
800
juga untuk pengembangan karir para pekerja. Selain conducted to employees from staff level to Head
promosi jabatan, mutasi lateral / alih tugas dilakukan of Division. Lateral mutation was meant to cover
pada pekerja dari level staf sampai dengan Kepala Subdivision cross-over until division cross-over in 600
09
08
06-07
03-05
01-02
TA
Stakeholder
karena banyaknya kebutuhan operasional. 4. Public Training
4. Public Training The fulfillment of functional competency was also
Pemenuhan kompetensi fungsional juga diberikan provided with public training, where employees
secara public training, dimana pekerja di awal tahun have worked on the Individual Development Plan
06. Internal BPMIGAS 06. Internal BPMIGAS 138 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 139
C. Realisasi Anggaran Besaran anggaran belanja BPMIGAS tahun The amount of BPMIGAS
budget realization in 2011 that
2011 yang disetujui oleh Menteri Keuangan
dan Belanja BPMIGAS has been approved by Ministry
adalah Rp1.194 miliar dan US$12,34 juta atau of Finance was Rp 1,194 billion
Anggaran dan Belanja dalam Rupiah Anggaran dan Belanja dalam US$
Budget in IDR Budget in US$
1%
4%
16%
Biaya Pekerja & Peningkatan Profesionalisme
54% Labor & Professionalism Improvement Cost 29%
Besaran anggaran belanja BPMIGAS tahun 2011 The amount of BPMIGAS’ budget in 2011 which tersebut masih jauh lebih rendah dari pagu besaran still much lower than the budget approved by Minister
yang disetujui oleh Menteri Keuangan adalah Rp1.194 has been approved by Minister of Finance was Rp1,194 anggaran yang diizinkan Menteri Keuangan, sebesar 1% of Finance in the amount of 1% from the revenue of
miliar dan US$12,34 juta atau total Rp1.305 miliar billion and US$12.32 million with the assumption of dari penerimaan hulu minyak dan gas bumi tahun 2011. upstream oil and gas industry in 2011.
dengan asumsi kurs Rp9.250 per dolar. Angka tersebut currency exchange of Rp9,250 per Dollar. That amount Realisasi anggaran (Rupiah dan Dolar) hingga Budget Realization (Rupiah and Dollar) until
naik dibandingkan anggaran dan belanja BPMIGAS was increased compare to BPMIGAS’ expenditure and Desember 2011 menunjukkan sebanyak 45,89% terserap December 2011 suggested that 45.89% was allocated
tahun 2010 sebesar Rp901,1 miliar dan US$10,06 juta budget in 2010 of Rp901.1 billion and US$10.06 million untuk biaya pekerja dan peningkatan profesionalisme for employee cost and professionalism increase
karena adanya penataan dan sewa kantor baru serta due to the arrangement and new office leasing as well disusul penataan dan sewa ruangan kantor 9,75% dan followed by arrangement and office leasing cost 9.75%
pembangunan jaringan IT untuk meningkatkan sistem as IT network development to increase the monitoring pengelolaan operasional 39,63%. and operational management 39.63%.
monitoring Kontraktor KKS. Namun besaran anggaran system of PSC Contractors. However, the amount was
06. Internal BPMIGAS 06. Internal BPMIGAS 142 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 143
D. Upaya Perbaikan Hasil perbaikan membuahkan hasil. Audit The outcome of improvement
has shown result. The
BPK-RI terhadap laporan keuangan BPMIGAS,
Pelaporan Keuangan audit from BPK-RI (Finance
yaitu “Wajar Tanpa Pengecualian”. Examination Board - Republic
of Indonesia) to BPMIGAS
Financial Report was
Effort to Improve Financial Report “Unqualified”.
Dalam rangka meningkatkan good corporate In a way to increase good corporate governance, b. Menetapkan Neraca Pembuka BPMIGAS per b. To state the Beginning Balance Sheet of BPMIGAS
governance, sejak tahun 2008 BPMIGAS telah since 2008 BPMIGAS has conducted various efforts 16 Juli 2002 setelah mendapatkan penetapan per July 16, 2002 after obtaining the initial equity of
melakukan berbagai usaha untuk memperbaiki to improve the institution’s financial report. This Kekayaan Awal BPMIGAS dari Menteri Keuangan BPMIGAS from Minister of Finance in accordance
pelaporan keuangan lembaga. Usaha ini dilakukan improvement attempt was conducted due to the sesuai Keputusan Menteri Keuangan Nomor: 333/ to Ministerial Act by Minister of Finance no. 333/
terkait dengan temuan audit BPK-RI terhadap pelaporan findings of The Audit Board of Republic Indonesia KMK.06/2008 tanggal 21 November 2008. KMK.06/2008 November 21st 2008.
keuangan BPMIGAS yang dinilai tidak sesuai dengan (BPK-RI) to BPMIGAS’ Financial Report which was c. Menyajikan kembali laporan keuangannya untuk c. Re-submit the Financial Report for year ended
prinsip akuntansi yang berlaku umum di Indonesia. discordance to GAAP (General Accepted Accounting tahun yang berakhir pada 31 Desember 2007, yang in December 31, 2007, which has presented the
Sebelumnya, pada tahun 2003 sampai tahun 2005 Principles) in Indonesia. sudah menggambarkan perbaikan-perbaikan laporan improved financial reports for years ended in
tim BPK-RI “Tidak Memberikan Opini” untuk laporan Previously, in 2003 to 2005, BPK-RI stated keuangan tahun-tahun yang berakhir 31 Desember December 31, 2002, 2003, 2004, 2005, and 2006.
keuangan BPMIGAS. Sementara pada laporan tahun “Disclaimer” to financial report of BPMIGAS. 2002, 2003, 2004, 2005 dan 2006.
2006, BPK-RI tidak memberikan penilaian karena Meanwhile, the 2006 financial report, BPK-RI did not The improvement obtained a good result. The
dinilai “Tidak Menyajikan Secara Wajar” sesuai prinsip release any statement because it was an “Adverse Hasil perbaikan membuahkan hasil. Audit BPK- auditing of BPMIGAS’ financial reports which was
akuntansi yang berlaku umum di Indonesia, posisi Opinion” based on the GAAP (General Accepted RI terhadap laporan keuangan BPMIGAS tahun 2008 performed by BPK received the highest assessment
keuangan BPMIGAS per 31 Desember 2006, dan Accounting Principles) in Indonesia, financial position yang dilaksanakan tahun 2010 dan 2009 dan 2010 yang which was “Unqualified Opinion”. Those were several
aktivitas, serta arus kas untuk tahun yang berakhir pada of BPMIGAS per December 21 2006, activity, and dilaksanakan pada tahun 2011 memberikan penilaian financial reports of 2008 done in 2010, while 2009
tanggal tersebut. cash flow on that date. tertinggi “Wajar Tanpa Pengecualian”. Penilaian and 2010 reports done in 2011. The assessments
Temuan ini terjadi antara lain karena BPMIGAS The finding occurred as a result of non-formalized ini mempertimbangkan semua hal material, posisi considered all materials, position of BPMIGAS’
belum memformalkan Pedoman Akuntansi yang Accounting Standard used by BPMIGAS in arranging keuangan BPMIGAS tanggal 31 Desember 2010 dan financial per December 31, 2010 and 2009, financial
digunakan dalam penyusunan laporan keuangan, its financial report. In addition, BPMIGAS did not have 2009, kinerja keuangan, perubahan ekuitas serta arus performance, change of equity, cash flow, and
serta BPMIGAS belum memiliki neraca pembukaan any first balance sheet because at that time Minister of kas dan informasi keuangan kontrak kerjasama dari information of financial agreement from upstream oil
karena Menteri Keuangan belum menetapkan Kekayaan Finance had not decided the initial equity of BPMIGAS. kegiatan usaha hulu minyak dan gas bumi untuk tahun and gas activity that ended in that date based on the
Awal BPMIGAS. The various improvement attempts were yang berakhir pada tanggal tersebut sesuai dengan GAAP in Indonesia.
Berbagai usaha perbaikan dilakukan, antara lain: conducted, such as: prinsip akuntansi yang berlaku umum di Indonesia.
a. Memformalkan Pedoman Akuntansi Keuangan a. To formalize Accounting Guidelines of BPMIGAS
BPMIGAS pada tanggal 19 Agustus 2008, untuk in August 19, 2008, to be used in Financial Report
digunakan dalam pelaporan keuangan agar sesuai so that the report will be in accordance to the GAAP
dengan prinsip akuntansi yang berlaku umum in Indonesia.
di Indonesia.
Tabel KKKS
Table of PSC Contractors
Tabel Table 146 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 147
Data Kontrak Kerjasama (KKS) dalam Koordinasi BPMIGAS Tahun 2011 - Production Sharing Contract (PSC)
Eksplorasi: Exploration Produksi: Production
PSC Data in Coordinating with BPMIGAS in 2011 - PSC
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
1 PT CAHAYA BATURAJABLOK PT CAHAYA BATURAJABLOK AIR KOMERING, ONS. EKSPLORASI PETROCHINA PETROCHINA BANGKO, ONS. SOUTH PRODUKSI
SOUTHERN SUMATERA INTERNATIONAL INTERNATIONAL SUMATERA
BANGKO LTD. BANGKO LTD.
2 PT INSANI BINA PERKASA PT INSANI BINA PERKASA ALAS JATI BLOCK, EAST JAVA EKSPLORASI
SK ENERGY CO. LTD
3 AMBALAT SHELL BV. AMBALAT BLOCK OFF.
KALIMANTAN TIMUR 13 COPAREX BANYUMAS BV BANYUMAS BLOCK, ONS.
CENTRAL JAVA
LASMO AMBALAT LTD. AMBALAT BLOCK OFF. EKSPLORASI
UNOCAL AMBALAT LTD. ENI AMBALAT LTD. KALIMANTAN TIMUR LUNDIN BANYUMAS BV STAR ENERGY BANYUMAS BLOCK, ONS. EKSPLORASI
(BANYUMAS) LTD. CENTRAL JAVA
4 CONOCOPHILLIPS CONOCOPHILLIPS AMBORIP VI BLOCK, EKSPLORASI CONOCOPHILLIPS
(AMBORIP VI) LTD. (AMBORIP VI) LTD. ARAFURA SEA (BANYUMAS) LTD.
5 SANYEN OIL AND GAS ANAMBAS BLOCK, OFF. 14 ALTAR SOCIEDADE DE ALTAR RESOURCES, SA BARITO BLOCK, ONS. EKSPLORASI
LIMITED NATUNA SEA INVESTIMENTO CENTRAL/SOUTH
IMOBILIARIO, SA KALIMANTAN
SANYEN OIL AND GAS ANAMBAS BLOCK, OFF. EKSPLORASI
LIMITED NATUNA SEA 15 LUNDIN BARONANG BV LUNDIN BARONANG BV BARONANG BLOCK EKSPLORASI
NATUNA SEA
6 TALISMAN ANDAMAN BV TALISMAN ANDAMAN BV ANDAMAN III BLOCK EKSPLORASI
NANGGROE ACEH 16 CNOOC BATANGHARI LTD CNOOC BATANGHARI LTD BATANGHARI BLOCK, JAMBI EKSPLORASI
DARUSSALAM
PT GREGORY GAS PERKASA
7 CONOCOPHILLIPS (ARAFURA CONOCOPHILLIPS (ARAFURA ARAFURA SEA BLOCK, EKSPLORASI
SEA BLOCK INDONESIA) LTD. SEA BLOCK INDONESIA) LTD. MALUKU 17 JAMBI INC. PTE. LTD. RANHILL JAMBI INC. PTE. LTD. BATU GAJAH BLOCK, JAMBI EKSPLORASI
8 ENI ARGUNI I LTD. ENI ARGUNI I LTD. ARGUNI I EKSPLORASI 18 KERR MCGEE OF BAWEAN BLOCK, ONS. OFF.
INDONESIA INC. EAST JAVA SEA
9 INDONESIA PETROLEUM LTD. ATTAKA BLOCK, OFF.
EAST KALIMANTAN QUINTANA INDONESIA LTD.
INDONESIA PETROLEUM LTD. ATTAKA BLOCK, OFF. PRODUKSI WAINOCO INDONESIA INC.
EAST KALIMANTAN
ENTERPRISE OIL BAWEAN BLOCK, ONS. OFF.
10 INPEX BANDA SEA LIMITED INPEX BANDA SEA LIMITED BABAR SELARU EKSPLORASI (BAWEAN) LTD. EAST JAVA SEA
11 ELNUSA BANGKANAI ELNUSA BANGKANAI BANGKANAI BLOCK, PRODUKSI KUFPEC (JAVA) LTD.
ENERGY LTD. ENERGY LTD. CENTRAL/EAST KALIMANTAN
SAMEDAN OIL
12 SANTA FE RESOURCES BANGKO, ONS. SOUTH INDONESIA INC.
(BANGKO) LTD. SUMATERA
Tabel Table 148 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 149
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
indo-pacific resources bawean block, ons. off. bp berau ltd. berau, off. irian jaya
(java) ltd. east java sea
mi merau bv
camar resources camar resources bawean block, ons. off. produksi
canada inc. canada inc. east java sea nippon oil exploration
(berau) ltd.
camar bawean
petroleum ltd. kg berau petroleum ltd.
19 pt geraldo energy pt geraldo energy belayan eksplorasi berau, off. irian jaya
20 pt sele raya pt sele raya belida belida block, ons. eksplorasi bp berau ltd. berau, off. irian jaya produksi
south sumatera
26 pt mitra energy mitra energy biliton pte biliton block, off. eksplorasi
21 pt petroner bengara bengara i block, ons. development ltd. java sea
energi east kalimantan
asia petroleum
pt medco e&p indonesia bengara i block, ons. eksplorasi development (biliton)
east kalimantan limited
22 apex (bengara-ii) ltd. continental-geopetro bengara ii block, ons. eksplorasi 27 pt sele raya energi pt sele raya energi blora block, ons. eksplorasi
(bengara ii) ltd. off. kalimantan timur central & east java
23 endeavor energy ecosse energy bengkulu block, eksplorasi 28 black gold marathon indonesia bone bay block, south eksplorasi
(bengkulu) pty. ltd. (bengkulu) pty. ltd. bengkulu ventures llc. (bone bay) limited east sulawesi
santos (bentu no.2) kalila (bentu) ltd. bentu segat block, ons. produksi 29 mitra energy (indonesia mitra energy (indonesia bone block, south eksplorasi
pty. ltd. riau bone) bone) sulawesi
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
32 Tately budong-budong n.v. tately budong-budong n.v. budong-budong block, eksplorasi 43 niko resources niko resources cendrawasih bay iv block eksplorasi
west sulawesi (overseas xxiv) ltd. (cendrawasih bay iv)
pt gema terra limited
repsol exploracion, s.a.
tgs nopec invest as
44 black gold exxonmobil e&p indonesia cendrawasih block, eksplorasi
33 shell prospecting south bukat block, off. cendrawasih llc. (Cendrawasih) ltd. papua
asia bv. kalimantan timur
exxonmobil E&P indonesia
lasmo bukat ltd. eni bukat ltd. bukat block, off. eksplorasi (cendrawasih) ltd.
kalimantan timur
unocal bukat ltd. 45 pt pertamina ep mobil cepu ltd. cepu block, java produksi
34 kalrez petroleum kalrez petroleum bula, ons. seram produksi mobil cepu ltd.
(seram) limited (seram) limited
ampolex (cepu) pte. ltd.
35 sebana ltd. pearloil (satria) ltd. bulu, off. eksplorasi
north east java 46 pt bumi parahyangan pan orient energy citarum block, west java eksplorasi
ranhill energia citarum (citarum) pte. ltd.
36 eni indonesia ltd. eni bulungan, bv. bulungan, off. block, eksplorasi
east kalimantan 47 perusahaan bob pertamina - bumi siak coastal plains and produksi
pertambangan minyak pusako Pekanbaru (cpp) block,
37 pt bunga mas energi bunga mas international bunga mas block, eksplorasi dan gas bumi negara ons. central sumatera
company south sumatera (pertamina)
38 japex buton ltd. japex buton ltd. buton block, eksplorasi pt bumi siak pusako
south east sulawesi
premier oil bv 48 asamera (overseas) ltd. corridor block, ons.
south sumatera
kufpec indonesia
(buton) ltd. asamera (overseas) ltd. corridor block, ons.
south sumatera
39 pt putindo bintech pt putindo bintech buton I Block, eksplorasi talisman (corridor) ltd.
south east sulawesi
conoco phillips corridor block, ons. produksi
40 lundin cakalang bv. lundin cakalang bv. cakalang block, eksplorasi (grissik) ltd. south sumatera
natuna sea
49 totalfinaelf donggola donggala block, off.
41 Niko resources repsol exploracion cendrawasih bay ii eksplorasi makassar strait, east
(overseas xxii) limited cendrawasih ii b.v. block inpex corporation kalimantan
42 Niko resources
(overseas xxii) limited
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
totalfinaelf donggala santos (donggala) donggala block, off. eksplorasi 59 pt easco east sepanjang pt easco east sepanjang east sepanjang block, eksplorasi
pty. ltd. makassar strait, off. east java
inpex north east kalimantan
makassar ltd. 60 serica east seruway bv. serica energy east east seruway block, eksplorasi
seruway bv northern sumatera
unocal donggala ltd.
61 sonlaw united sonlaw united east simenggaris eksplorasi
50 transworld west natuna exploration duyung block, off. eksplorasi corporation corporation
exploration ltd. limited natuna sea
62 pt sigma energi pt sigma energi enrekang block, south eksplorasi
51 unocal east ambalat, ltd chevron east east ambalat block, off. eksplorasi petrogas petrogas sulawesi
ambalat, ltd. east kalimantan
63 pt nusamba energy ganal block, off.
52 cjsc sintezmorneftegaz east bawean ltd. east bawean i block, eksplorasi pratama kalimantan timur
east java
unocal ganal ltd.
53 black gold east bula llc black gold east bula llc east bula block, maluku eksplorasi
lasmo ganal ltd. chevron ganal ltd. ganal block, off. produksi
niko resources kalimantan timur
(overseas xvii) limited unocal ganal ltd.
54 pan orient energy east pan orient energy east east jabung eksplorasi 64 exxonmobil exploration exxonmobil exploration gunting block, east java eksplorasi
jabung pty ltd. jabung pty ltd. and production and production
indonesia (gunting) ltd. indonesia (gunting) ltd.
55 union oil company of east kalimantan, ons.
indonesia off. 65 lundin gurita bv. lundin gurita bv. gurita, riau eksplorasi
unocal indonesia ltd. east kalimantan, ons. 66 black gold halmahera niko resources halmahera - kofiau eksplorasi
off. kofiau llc (halmahera kofiau) block, north
limited
unocal indonesia ltd. chevron indonesia east kalimantan, ons. produksi niko resources
company off. (overseas xvi) limited.
56 Greenstar assets limited greenstar assets limited east kangean block, eksplorasi 67 halmahera petroleum halmahera petroleum halmahera block, ons. & eksplorasi
east java limited limited off. north maluku
57 pearl oil (east muriah) pearl oil (east muriah) east muriah block, east eksplorasi 68 statoil indonesia halmahera ii eksplorasi
ltd. ltd. java halmahera ii as
58 pt northern yamano pt northern yamano east pamai block, riau 69 trend international petrochina jabung block, ons. produksi
technology oil technology oil (jabung) ltd. international jabung jambi.
resources east pamai resources east pamai ltd.
anadarko indonesia coy.
Tabel Table 154 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 155
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
70 philips petr. coy. ind. kakap block 74 pt odira energy karang pt odira energy karang karang agung block, produksi
agung agung south sumatera
tenneco ind. inc.
75 amstelco karapan pte. amstelco karapan pte. karapan block, off. eksplorasi
kakap block ltd. ltd. north madura
GULF RESOURCES (KAKAP) kakap block 76 genting oil kasuri pte. genting oil kasuri pte. kasuri block, west papua eksplorasi
LTD. ltd. ltd.
PREMIER (KAKAP) PTY. LTD. 77 trend exploration ltd. kepala burung block
NOVUS U.K. (KAKAP 2) LTD. SANTA FE ENERGY petrochina kepala burung block, produksi
RESOURCES (BERMUDA) INC. international (bermuda) except klamono &
NOVUS PETROLEUM CANADA ltd. sorong, ons. irian jaya
(KAKAP) LTD. COPAREX INTERNATIONAL
71 eurorich group ltd. eurorich group ltd kalyani eksplorasi 79 gulf resources pc ketapang ii ltd ketapang block, off. produksi
(ketapang) ltd. east java sea
72 atlantic richfield bali kangean block, ons. off.
north inc. east java sea 80 chevron kisaran limited kisaran block, ons.
central sumatera
bp kangean ltd. kangean block, ons. off. texaco kisaran inc
east java sea
bp exploration (kangean) pacific oil & gas (kisaran) kisaran block, ons. eksplorasi
ltd. ltd. central sumatera
emp kangean ltd kangean block, ons. off. 81 black gold kofiau llc niko resources (kofiau) kofiau block, west papua eksplorasi
east java sea limited
niko resources
kangean energy kangean block, ons. off. produksi (overseas ix) limited
indonesia limited east java sea
82 apache korinci baru ldc. kalila (korinci baru) ltd. korinci baru block, ons.
73 PT PERTAMINA HULU ENERGI statoil indonesia karama block, makassar eksplorasi riau
KARAMA karama as strait
STATOIL INDONESIA
KARAMA AS
Tabel Table 156 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 157
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
SANTOS (KORINCI BARU kalila (korinci baru) ltd. korinci baru block, ons. produksi 91 pt sarana pembangunan pt spr langgak langgak block, riau produksi
NO.2) PTY. LTD. riau riau
88 pt aditya nugraha pt aditya nugraha lampung i block, off. eksplorasi husky oil (madura) ltd.
pratama energy lampung pratama energy lampung java sea, lampung
penzoil asiatic inc.
89 pc lampung ii ltd. pc lampung ii ltd. lampung ii block, off. eksplorasi
java sea, lampung mobil oil madura strait madura strait, ons. off.
inc.
90 pt harpindo mitra pt harpindo mitra lampung iii block, eksplorasi
kharisma kharisma lampung husky oil (madura) ltd.
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
husky oil (madura) ltd. madura strait, ons. off. produksi kondur petroleum s.a. kondur petroleum s.a. malacca strait block, produksi
off.
100 japan petroleum mahakam block, off. oogc malacca ltd.
exploration co. ltd. east kalimantan
pt imbang tata alam
indonesia petroleum ltd. mahakam block, off.
east kalimantan malacca petroleum ltd.
total indonesie s.A.
104 pttep malunda limited pttep malunda limited malunda block eksplorasi
total indonesie mahakam block, off.
east kalimantan 105 pt bumi hasta mukti mandala block eksplorasi
indonesia petroleum ltd.
fortune empire group ltd.
mahakam block, off.
east kalimantan 106 exxonmobil exploration exxonmobil e&p indonesia mandar block, makassar eksplorasi
and production (mandar) ltd. strait
mahakam block, off. indonesia (mandar) ltd.
east kalimantan
107 pt waropen perkasa ecosse energy manokwari block, papua eksplorasi
total e&p indonesie total e&p indonesie mahakam block, off. produksi (manokwari) ltd
east kalimantan
inpex corporation 108 pt schintar marquisa pt schintar marquisa marquisa, north eksplorasi
sumatera & riau
101 spc e&p upstream pte spc mahakam hilir pte mahakam hilir block, eksplorasi
ltd. ltd. east kalimantan 109 indonesia petroleum ltd. masela block, off. laut
timor
102 mobil makassar inc. makassar strait, off.
makassar strait inpex masela ltd. inpex masela ltd. masela block, off. laut produksi
timor
mobil makassar inc. chevron makassar ltd. makassar strait, off. produksi
makassar strait 110 pt exspan merangin pt medco e&p merangin merangin i block, ons. eksplorasi
unocal makassar ltd. jambi
103 kondur petroleum s.a. malacca strait block, 111 pt sele raya pt sele raya merangin merangin ii block, off. produksi
off. dua south sumatera
malacca strait block, 112 lasmo indonesia ltd. eni muara bakau bv muara bakau block, produksi
off. makassar strait, east
unocal muara bakau ltd. kalimantan
malacca strait block,
off. 113 muriah shell bv muriah, off. north east
java sea
malacca strait block,
off. bp muriah ltd. pc muriah limited muriah, off. north east produksi
java sea
Tabel Table 160 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 161
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
114 british gas exploration muturi block, irian jaya 117 pt terra global vestal pt terra global vestal north baturaja eksplorasi
and production ltd. baturaja baturaja
pt sapta patra wisesa 118 anadarko indonesia anadarko indonesia north east madura iii, eksplorasi
company company off. east java
bg exploration and muturi block, irian jaya
production ltd. 119 gfb resources (natuna) north east natuna, off.
ltd.
cairins ltd.
pt binatek reka natuna
indonesia natural gas
resources muturi inc. titan resources natuna titan resources (natuna) north east natuna, off. eksplorasi
indonesia ltd. indonesia ltd.
bg international ltd muturi block, irian jaya
pt binatek reka natuna
cnooc muturi ltd
120 niko resources (north north ganal eksplorasi
indonesia natural gas ganal) limited
resources muturi inc
north ganal energy ltd
bp muturi holdings bv
statoil indonesia north
cnooc muturi, ltd. muturi block, irian jaya ganal as
bp muturi holdings bv mututri block, irian jaya produksi 121 petrojava north petrojaya north north kangean, east eksplorasi
kangean inc kangean inc java
115 sumatera gulf oil ltd. natuna sea block “a”, off.
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
125 asamera oil (indonesia) north sumatera “b” 131 independent indonesian northwest java sea, off. e
ltd. block, ons. north american petroleum co.
sumatera
atlantic richfield northwest java sea, off.
mobil oil indonesia inc north sumatera “b” indonesia inc.
block, ons. north
sumatera northwest java sea, off.
126 asamera oil (ind) ltd. north sumatera area “a”, mc oil & gas java bv
north sumatera
itochu oil exploration co.
north sumatera area “a”,
north sumatera paladin resources
(sunda) ltd.
pt medco e&p malaka north sumatera area “a”,
north sumatera 132 genting oil natuna pte genting oil natuna pte northwest natuna, off. produksi
premier oil sumatera ltd. ltd. natuna sea
(north) bv
133 pt medco e&p nunukan anadarko indonesia nunukan, off. east eksplorasi
japex blok a ltd nunukan company kalimantan
pt medco e&p malaka north sumatera area “a”, produksi 134 niko resources (obi) niko resources (obi) obi eksplorasi
north sumatera limited limited, statoil indonesia
obi as, zimorex nv
127 mobil oil indonesia inc. north sumatera, off. statoil indonesia obi as
130 sarmi papua asia oil ltd. sarmi papua asia oil ltd. northern papua eksplorasi
Tabel Table 164 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 165
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
138 premier oil pangkah ltd. hess (indonesia-pangkah) pangkah block, off. ne produksi 147 prabu energy pty ltd. prabu energy pty ltd. ranau eksplorasi
ltd java sea
seafield resources (ind.) 148 pt pertamina ep pt pertamina hulu energi randugunting, central & eksplorasi
llc randugunting randugunting east java
zudani nv anadarko papalang, ltd. papalang block, off. eksplorasi 150 unocal rapak ltd., rapak, off. kalimantan
makassar strait, east timur
agip papalang ltd. kalimantan nusamba kaltim pratama,
pt
unocal papalang ltd.
lasmo rapak ltd. chevron rapak ltd. rapak, off. kalimantan produksi
140 indoreach exploration indoreach exploration pari block, natuna sea eksplorasi timur
ltd ltd unocal rapak ltd.
151 orna international, ltd. orna international, ltd. rembang, off. north eksplorasi
141 marathon international marathon international pasangkayu block, eksplorasi central java
petroleum indonesia ltd. petroleum indonesia ltd. makassar strait
152 pt stanvac indonesia rimau block, ons. south
talisman (pasangkayu) sumatera
limited.
rimau block, ons. south
142 mobil pase inc. triangle pase inc. pase block, ons. aceh produksi sumatera
143 pt archipelago pasir petroleum pasir block, east eksplorasi ekspan airsenda inc. rimau block, ons. south
resources resources limited kalimantan sumatera
exspan airlimau inc.
144 pt pertamina ep pt pertamina ep pertamina ep produksi
rimau block, ons. south
145 zodan nv popodi block, off. sumatera
makassar strait, east
kalimantan pt medco e&p indonesia rimau block, ons. south produksi
sumatera
zodan nv anadarko popodi ltd. popodi block, off. eksplorasi
makassar strait, east 153 pt caltex pacific rokan block, ons.
agip popodi ltd. kalimantan indonesia central sumatera
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
rokan block, ons. Produksi roy m. huffington inc. virginia indonesia sanga-sanga block, ons. produksi
central sumatera company (vico), llc east kalimantan
virginia international co.
rokan block, ons.
central sumatera virginia indonesia co.
156 talisman (south talisman (sageri) ltd. sageri, makassar strait eksplorasi lundin sareba bv. lundin sareba bv. sareba, ons. off. irian eksplorasi
makassar) ltd. jaya
157 cakra nusa darma cakra nusa darma sakakemang block, eksplorasi 161 star energy sentosa star energy sentosa sebatik, east kalimantan eksplorasi
(skkmg) ltd. (skkmg) ltd. south sumatera (sebatik) ltd. (sebatik) ltd.
158 santos (sampang) pty ltd. santos (sampang) pty ltd. sampang, ons. off. produksi 162 gulf resources (sebuku) sebuku, off. selat
ltd. makassar
coastal indonesia
sampang ltd. sebuku, off. selat
makassar
cue sampang pty ltd.
pearloil (sebuku) ltd. pearloil (sebuku) ltd. sebuku, off. selat produksi
159 virginia international sanga-sanga block, ons. makassar
east kalimantan total e&p sebuku
roy m. huffington inc.
inpex south makassar
sanga-sanga block, ons. ltd.
east kalimantan
163 pt kutai etam petroleum pt kutai etam petroleum seinangka, senipah, ons. eksplorasi
east kalimantan
164 star energy (sekayu) ltd. star energy (sekayu) ltd. sekayu, south sumatera eksplorasi
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
166 murphy semai oil co. ltd. murphy semai oil co. ltd. semai ii, west papua eksplorasi chevron asiatic ltd. siak block, ons.
171 indonesia gulf oil co. sengkang, ons. south pearloil (sanstone)
sulawesi limited
energy equity (sengkang) sengkang, ons. south 177 black platinum black platinum sokang eksplorasi
pty ltd. sulawesi investment ltd investment ltd
energy equity epic energy equity epic sengkang, ons. south produksi south and central
(sengkang) pty ltd. (sengkang) pty ltd. sulawesi sumatera, ons.
172 kufpec (indonesia) ltd. citic seram energy seram non bula produksi pt exspan nusantara south and central
limited sumatera, ons.
173 black gold indonesia black gold indonesia seram, off. maluku eksplorasi south and central
llc. llc. sumatera, ons.
174 transworld exploration seruway offshore seruway, off. nangroe eksplorasi pt medco e&p indonesia south and central produksi
limited exploration limited aceh darussalam sumatera, ons.
175 california asiatic oil co. siak block, ons. (south sumatera
texaco overseas 179 murphy overseas murphy south barito ltd. south barito eksplorasi
petroleum co. ventures inc.
Tabel Table 170 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 171
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
180 pt anugerah mutiara pt anugerah mutiara south baturaja eksplorasi 192 pt eksindo south madura aed south madura bv south madura, east java eksplorasi
sentosa sentosa
193 pttep south mandar ltd. pttep south mandar ltd. south mandar block, eksplorasi
181 acg (south bengara ii) acg (south bengara ii) south bengara ii, east eksplorasi makassar strait
pte ltd. pte ltd. kalimantan talisman south mandar
bv. io.
182 techwin energy south techwin energy south south betung, jambi & eksplorasi
betung ltd. betung ltd. south sumatera 194 kaizan south matindok black gold south south matindo, central eksplorasi
llc matindok llc sulawesi
183 pt realto energi renco elang energy pte south block “a”, eksplorasi
nusantara corelasi ltd northern sumatera niko resources
(overseas iv) limited
pt prosys oil & gas
international 195 continental oil company south natuna sea block
of indonesia “b”, off.
184 ranhill pamai taluk ranhill pamai taluk south cpp, riau eksplorasi
energy pte ltd. energy pte ltd CONTINENTAL OIL COMPANY south natuna sea block
OF INDONESIA “b”, off.
185 kaizan south east niko resources (south south east ganal i eksplorasi
ganal i llc east ganal i) limited GETTY OIL INTERNATIONAL
(INDONESIA) INC
186 pt energi mineral pt energi mineral south east madura, east eksplorasi
langgeng langgeng java JAVA GULF LTD.
187 total E&p south east total e&p south east south east mahakam, eksplorasi INPEX NATUNA LTD
mahakam mahakam makassar strait
conoco indonesia inc. south natuna sea block
inpex corporation “b”, off.
texaco block b south
188 cnooc palung aru ltd. cnooc palung aru ltd. south east palung aru, eksplorasi natuna sea inc.
maluku
petronas carigali chevron international
bahrain ltd. ltd.
189 pt kutai timur resources salamander energy (se south east sangatta, eksplorasi inpex natuna ltd.
sangatta) ltd east kalimantan
salamander energy (se south natuna sea block
sangatta) ltd “b”, off.
190 niko resources (south niko resources (south south east seram eksplorasi conoco indonesia inc. south natuna sea block
east seram) ltd. east seram) ltd. “b”, off.
texaco block b south
191 gujarat state petroleum gujarat state petroleum south east tungkal, eksplorasi natuna sea inc.
corporation ltd. corp. ltd. jambi
inpex natuna ltd.
essar exploration &
production ltd.
Tabel Table 172 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 173
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
196 talisman south sageri talisman south sageri south sageri block, eksplorasi 205 exxonmobil exploration exxonmobil e&p surumana, makassar eksplorasi
bv. io. bv. makassar strait and production surumana ltd. strait
surumana ltd.
pttep south sageri
limited 206 krisenergy (tanjung aru) tanjung aru eksplorasi
bv.
197 hess (indonesia south hess (indonesia south south sesulu, east eksplorasi
sesulu) ltd. sesulu) ltd. kalimantan neon energy indonesia
pty ltd.
198 lundin south sokang bv. south sokang block, eksplorasi
riau islands natuna ventures pte ltd.
salamander energy
(south sokang) limited 207 tesoro tarakan tarakan island, ons.
petroleum co. east kalimantan
199 pt radiant bukit barisan pt radiant bukit barisan south west bukit eksplorasi
ep E&p barisan, weset sumatera pt exspan tarakan tarakan island, ons.
& riau east kalimantan
pc (skr) international
ltd. tarakan island, ons.
east kalimantan
200 independent indonesian south sumatera, off.
american petroleum coy. pt medco e&p indonesia tarakan island, ons. produksi
east kalimantan
maxus southeast
sumatera inc. 208 provident indonesia manhattan kalimantan tarakan, off. east produksi
energy, llc investment pte ltd. kalimantan
maxus southeast south sumatera, off.
sumatera inc. 209 awe (terumbu) nz ltd. awe (terumbu) nz ltd. terumbu block, east java eksplorasi
cnooc ses ltd. south sumatera, off. produksi 210 awe (titan) nz ltd. baruna oil and gas ltd. titan block, east java eksplorasi
sea
201 total e&p indonesia west total e&p indonesia west southwest bird’s head, eksplorasi baruna oil and gas ltd.
papua papua west papua
pt sillo maritime perdana
202 pt brilliance energy pt brilliance energy sula i, north maluku eksplorasi
211 pt mosesa petroleum pt mosesa petroleum tonga block, north eksplorasi
203 cooper energy cooper energy sumbagsel, south eksplorasi sumatera
sumbagsel ltd. sumbagsel ltd. sumatera pt kencana surya
perkasa
204 niko resources niko resources (sunda sunda strait i block eksplorasi
(overseas xxvi) ltd. strait i) ltd. pt petross exploration
production
niko resources
(overseas xi) ltd. 212 premier oil h bv. premier oil tuna bv. tuna block, natuna sea eksplorasi
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
213 asamera (tungkal) ltd. montd’or oil tungkal tungkal, ons. jambi produksi 225 chevron west papua iii chevron west papua i ltd west papua iii block, eksplorasi
limited ltd. west papua
214 m3nergy gamma sdn bhd m3nergy gamma sdn bhd ujung kulon, banten, eksplorasi 226 black gold west niko resources (west west papua iv, maluku & eksplorasi
west java papua iv llc papua iv) limited west papua
215 pt pandawa prima lestari pt pandawa prima lestari wain, east kalimantan eksplorasi 227 kaizan west sageri llc. niko resources (west west sageri, makassar eksplorasi
sageri) limited strait
216 conoco warim, ltd warim, ons. irian jaya niko resources
(overseas ii) ltd
warim, ons. irian jaya
228 pearl oil (salawati) montd’or (salawati) west salawati, papua eksplorasi
conoco phillips warim warim, ons. irian jaya eksplorasi limited limited
ltd.
229 pt kalimantan kutai pt kalimantan kutai west sangata, east eksplorasi
217 pt tiarabumi petroleum pt tiarabumi petroleum west air komering, south eksplorasi energi energi kalimantan
sumatera
230 pt mri energy pt mri energy west tanjung eksplorasi
218 bp west aru i ltd bp west aru i ltd west aru i eksplorasi
231 eni indonesia ltd eni west timor limited west timor, east nusa eksplorasi
219 bp west aru ii ltd bp west aru ii ltd west aru ii eksplorasi tenggara
220 orchard energy (west orchard energy (west west belida, jambi - eksplorasi 232 pt three golden energy pt three golden energy west tungkal eksplorasi
belida) ltd. belida) ltd. south sumatera west tungkal west tungkal
222 pt sumatera persada pt sumatera persada west kampar, central produksi cnooc wiriagar
energi energi sumatera overseas ltd.
223 kodeco energy co. west madura, off. east wiriagar block, ons.
java. irian jaya
pt pertamina hulu energi pt phe wmo west madura, off. east produksi wiriagar block, ons. produksi
west madura offshore java irian jaya
kodeco energy co. ltd. 234 murphy wokam oil murphy wokam oil wokam ii block, west eksplorasi
company ltd. company ltd. papua
224 chevron west papua i ltd chevron west papua i ltd west papua i block, eksplorasi
west papua
Tabel Table 176 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 177
Data Kontrak Kerjasama (KKS) dalam Koordinasi BPMIGAS Tahun 2011 - PSC JOB/JOA
Eksplorasi: Exploration Produksi: Production
PSC Data in Coordinating with BPMIGAS in 2011 - PSC JOB/JOA
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
1 JAPAN PETROLEUM GEBANG BLOCK, ONS. OFF. PT PERTAMINA (PERSERO) JOB PERTAMINA SALAWATI, ONS. OFF. produksi
EXPLORATION CO. LTD. NORTH SUMATERA PETROCHINA SALAWATI IRIAN JAYA
PT PERTAMINA HULU ENERGI
JAPEX NORTH JOB PERTAMINA COSTA GEBANG BLOCK, ONS. OFF. produksi SALAWATI
SUMATERA LTD. INTERNATIONAL GROUP LTD. NORTH SUMATERA
PETROCHINA
2 ELF AQUITAINE JAMBI MERANG BLOCK, INTERNATIONAL KEPALA
INDONESIE JAMBI ONS. JAMBI BURUNG LTD
PT PERTAMINA (PERSERO) JOB PERTAMINA TALISMAN JAMBI MERANG BLOCK, produksi LUNDIN INDONESIA BV
JAMBI MERANG ONS. JAMBI
PT PERTAMINA HULU ENERGI PEARL OIL (ISLAND) LTD.
JAMBI MERANG
6 UNION TEXAS TOMORI INC. SENOR - TOILI, ONS. OFF.
TALISMAN (JAMBI CENTRAL SULAWESI
MERANG) LTD
PT PERTAMINA (PERSERO) JOB PERTAMINA – MEDCO SENORO - TOILI, ONS. OFF. produksi
PACIFIC OIL & GAS (JAMBI TOMORI SULAWESI CENTRAL SULAWESI
MERANG) LTD. PT PERTAMINA HULU ENERGI
TOMORI SULAWESI
3 CANADA NORTHWEST OGAN KOMERING, ONS.
ENERGY (SOUTH SUMATERA SELATAN PT MEDCO E&P TOMORI
SUMATERA) LTD. SULAWESI
PT PERTAMINA (PERSERO) JOB PERTAMINA TALISMAN OGAN KOMERING, ONS. produksi 7 GENINDO WESTERN JOB PERTAMINA - MEDCO SIMENGGARIS, ONS. OFF. produksi
(OGAN KOMERING) LTD. SUMATERA SELATAN PETROLEUM PTY. LTD. SIMENGGARIS KALTIM
PT PERTAMINA HULU ENERGI
OGAN KOMERING 8 GULFCAN SUMATERA CONOCOPHILLIPS (SOUTH SOUTH JAMBI ‘B’ BLOCK, produksi
LIMITED JAMBI) LTD. ONS. JAMBI
TALISMAN (OGAN
KOMERING) LTD. 9 TOTAL TENGAH TOTAL E&P INDONESIE TENGAH BLOCK, OFF. EAST produksi
KALIMANTAN
4 GOLDEN SPIKE JOB PERTAMINA GOLDEN RAJA DAN PENDOPO BLOCK, produksi INDONESIA PETROLEUM LTD.
INDONESIA LTD. SPIKE ENERGY IND ONS. SOUTH SUMATERA
10 TREND EAST JAVA LTD. TUBAN BLOCK, ONS.
PT KODEL JAWA TIMUR
ENRON OIL SUMATRA LTD. PT PERTAMINA (PERSERO) JOB PERTAMINA TUBAN BLOCK, ONS. produksi
PETROCHINA EAST JAVA JAWA TIMUR
INTERNATIONAL PT PERTAMINA HULU ENERGI
FINANCE CORP. TUBAN EAST JAVA
PT PERTAMINA HULU
ENERGI TUBAN
Tabel Table 178 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 179
Data Kontrak Kerjasama (KKS) dalam Koordinasi BPMIGAS Tahun 2011 - Kontrak Jasa
Eksplorasi: Exploration Produksi: Production
PSC Data in Coordinating with BPMIGAS in 2011 - Service Contract
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
1 wailawi - east kalimantan 10 pt samantaka mineral pt samantaka mineral gmb indragiri hulu eksplorasi
prima prima block, riau
perusda “benuo taka” persuda “benuo taka” wailawi - east kalimantan produksi
11 pt transasia cbm gmb kapaus i, central eksplorasi
kalimantan
bp kapuas i ltd.
1 pt bangkanai energi pt bangkanai energi gmb bangkanai iii eksplorasi 14 pt satui basin gas pt satui basin gas gmb kotabu block, south eksplorasi
resources resources kalimantan
2 pt bangkanai jaya pt bangkanai jaya gmb bangkanai iv eksplorasi 15 kutai west cbm inc. gmb kutai block, east eksplorasi
perkasa perkasa kalimantan
newton energy capital
3 pt indobarambai pt indobarambai gas gmb barito banjar i eksplorasi limited
gas methan methan block, south kalimantan
16 pt gas methan abadi pt gas methan abadi gmb kutai barat, east eksplorasi
4 pt barito basin gas pt barito basin gas gmb barito banjar ii eksplorasi kalimantan
block, south kalimantan
17 ephindo kutai north inc. gmb kutai ii, east eksplorasi
5 PT TRANSASIA RESOURCES PT TRANSASIA ENERGY GMB BARITO BLOCK, SOUTH eksplorasi kalimantan
RESOURCES KALIMANTAN pt resources alarm
PT JINDAL STAINLESS energi
INDONESIA
18 senyiur cbm inc. senyiur cbm inc. gmb kutai timur, east eksplorasi
6 pt trisakti gas methan pt trisakti gas methan gmb barito tapin block, eksplorasi kalimantan
south kalimantan total E&p kutai timur
7 bumi perdana energi ltd. gmb batangasin block, eksplorasi 19 PT. MEDCO CBM LEMATANG gmb lematang eksplorasi
south sumatera
PT. METHANINDO ENERGI
8 PT. SELE RAYA RESOURCE gmb belida eksplorasi RESOURCES
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
21 deep industries limited gmb melak mendung iii eksplorasi 31 VIRGINIA INDONESIA CO LLC virginia indonesia co. gmb sanga-sanga block, eksplorasi
cbm. ltd. east kalimantan
monnet ispat & energy BP EAST KALIMANTAN LTD
limited
LASMO SANGA-SANGA LTD
22 pt pertamina hulu energi pt trisula cbm energi gmb muara enim block, eksplorasi
metana sumatera 2 south sumatera OPIC OIL HOUSTON INC
23 pt pertamina hulu energi gmb muara enim i, south eksplorasi UNIVERSE GAS AND OIL CO
metana sumatera 1 sumatera INC
28 pt east ogan methane pt east ogan methane gmb ogan komering ii eksplorasi 36 pt pertamina hulu energi gmb suban i eksplorasi
block, south sumatera metana suban i
29 pt sigma energy bumi pt uangel sigma energy gmb pulang pisau block, eksplorasi pt suban energi
central kalimantan
blue tiger co. ltd. 37 pt pertamina hulu energi gmb suban ii eksplorasi
suban ii
30 indon cbm ltd. indon cb; gmb rengat block, eksplorasi
central sumatera (riau) pt suban methan gas
Tabel Table 182 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 183
Data Kontrak Kerjasama (KKS) dalam Koordinasi BPMIGAS Tahun 2011 - Resume KKS
Eksplorasi: Exploration Produksi: Production
PSC Data in Coordinating with BPMIGAS in 2011 - PSC Resume
No. Kontraktor Asal Operator Wilayah Kerja Status No. Kontraktor Asal Operator Wilayah Kerja Status
Contractor Operator Working Area Status Contractor Operator Working Area Status
38 pt artha widya persada pt artha widya persada gmb tabulako eksplorasi 1 Production sharing contract (psc) 62 172 234
39 pt asam-asan methan gas pt asam-asan methan gas gmb tanah laut eksplorasi 2 psc gas methana batubara (gmb) 0 42 42
40 pt pertamina hulu energi dart energy (tanjung gmb tanjung enim block, eksplorasi 3 psc - joint operator arrangements (joa) 2 0 2
metra enim enim) pte ltd. south sumatera
4 psc - joint operation body (job) 8 0 8
pt bukit asam metana
enim 5 kontrak jasa 1 1 0
Legenda Peta Wilayah I Area I I.22 Gurita, LUNDIN GURITA BV I.44 NE. Natuna, TITAN RES.
PSC, 01-04-2011, Ons, Eks. (B2) PSC, 15-05-1997, Off, Eks. (C1)
Legend of The Map
I.01 Air Komering, CAHAYA BR I.23 Jabung, PETROCHINA I.45 North Sokang, NS ENERGY LTD
Batas laut teritorial, perlu kesepakatan PSC, 12-12-2004, Ons, Eks. (B3) PSC, 12-12-2004, Ons, Eks. (B3) PSC, 00-12-2010, Off, Eks. (C2)
Coastal Line Territory, need agreement
I.02 Anambas, SANYEN OIL I.24 Jambi Merang, JOB HESS I.46 Anambas, SANYEN OIL
Batas klaim maksimum landasan kontinen (yang
PSC, 12-12-2004, Off, Eks. (C1-2) JOB, 10-02-1989, Ons, Ept. (B3) PSC, 16-07-1968, EXT, 01-09-1997, Ons, Ept.-EXT (A2)
memungkinkan)
I.03 Andaman III, TALISMAN I.25 Kakap, STAR ENERGY I.47 NW Natuna, GENTING OIL
Maximum claim limit of continent basis (which PSC, 30-11-2009, Off, Eks. (A1) PSC, 22-03-1975, Off, Ept.-EXT (C1) PSC, 12-12-2004, Off, Eks. (C1)
possible)
I.04 Area A - N. Sumatera, MEDCO I.26 Kalyani, EURORICH I.48 North Sumatera Ofs., EXXON
PSC, 01-09-1961, EXT, 01-09-1991, Ons, Ept.-EXT (A2) PSC, 19-12-2011, Ons, Eks. (B3) PSC,17-09-2005, Ons/Off, Ept.-EXT (A1)
Legenda Wilayah Kerja I.05 Bangko, PETROCHINA I.27 Karang Agung, ODIRA I.49 Ogan Komering, JOB TALISMAN
PSC, 17-02-1995, Ons, Ept. (B3) PSC, 16-01-2007, Ons, Ept. (B3) JOB, 29-02-1988, Ons, Ept. (B3)
Legend of Working Areas
I.06 Baronang, LUNDIN I.28 Kerapu, PEARL OIL I.50 Palmerah, TATELY N.V.
PSC, 30-12-2003, Ons, Eks. (B3) PSC, 13-11-2008, Off, Eks. (C1) PSC, 30-12-2003, Ons, Ept. (B3)
I.01 Air Komering, CAHAYA BR Batanghari, CNOOC Kisaran, PACIFIC O&G Pandan, TROPIK ENERGY
PSC, 12-12-2004, Ons, Eks. (B3) I.07 PSC, 16-01-2007, Ons, Eks. (B3)
I.29 PSC, 17-05-2001, Ons, Eks. (B2)
I.51 PSC, 12-12-2004, Ons, Eks. (B3)
I.08 Batu Gajah, RANHILL I.30 Korinci Baru, KALILA I.52 Pari, INDOREACH
PSC, 16-01-2007, Ons, Eks. (B3) PSC, 15-05-1997, Ons, Ept. (B2) PSC, 16-01-2007, Off, Eks. (C2)
Keterangan cara baca legenda
I.09 Belida, SELE RAYA I.31 Krueng Mane, ENI I.53 Pase, TRIANGLE PASE INC.
Instruction in reading the map PSC, 12-12-2004, Ons, Eks. (B3) PSC, 27-09-1999, Off, Eks. (A1) PSC, 16-10-1968, Ons, Ept. (A2)
ID Wilayah Kerja I.10 Bengkulu, ECOSSE I.32 Lampung III, HARPINDO I.54 Pendopo, JOB GOLDENSPIKE
I.01 ID of Working Area PSC, 22-12-2006, Ons, Eks. (B3) PSC, 05-05-2009, Ons, Eks. (C3-4) JOB, 06-07-1989, Ons, Ept. (B3)
Wilayah Kerja
Air Komering Bentu Segat, KALILA Langgak (MFK), SPR-KINGSWOOD Puri, PURI PETROLEUM
Working Area
I.11 PSC, 20-05-1991, Ons, Ept. (B2)
I.33 PSC, 25-11-1963, Ons, Ept. (B2)
I.55 PSC, 18-05-2010, Ons, Eks. (B3)
Operator
CAHAYA BR Operator
Jenis Kontrak
I.12 Bungamas, BUNGAMAS E. I.34 Lemang, HEXINDO I.56 Ranau, PRABU ENERGY
PSC Type of Contract PSC, 22-12-2005, Ons, Eks. (B3) PSC, 16-01-2007, Ons, Eks. (B3) PSC, 12-11-2011, Ons, Eks. (B3)
Tanggal Efektif Kontrak
12-12-2004 Contract Effective Date
I.13 CPP, BOB BUMI SIAK PUSAKO I.35 Lematang, MEDCO I.57 Rimau, MEDCO
Ons Lokasi Onshore/Offshore PSC, 09-08-1975, Ons, Ept. (B2) PSC, 06-04-1987, Ons, Ept. (B3) PSC, 23-04-1973, Ons, Ept. (B3)
Location Onshore/Offshore
Eks. Status
I.14 Cakalang, LUNDIN I.36 Lhokseumawe, ZARATEX I.58 Rokan, CHEVRON
Status PSC, 13-11-2008, Off, Eks. (C1) PSC, 22-12-2006, Ons/Off, Eks. (A1) PSC, 09-08-1975, EXT, 28-11-1993, Ons, Ept.-EXT (B2)
Lokasi pada peta (Kolom K-Baris 3)
B3 Location on map (Column K-Row 3)
I.15 C&S. Sumatera, MEDCO I.37 Lirik II, KARYA INTI I.59 C&S. Sumatera, MEDCO
PSC, 28-11-1963, Ons, Ept. (B3) PSC, 16-01-2007, Off, Eks. (C2) PSC, 18-05-2010, Off, Eks. (B3)
I.16 Corridor, COPI I.38 Malacca Strait, KONDUR I.60 Sekayu, STAR ENERGY
Keterangan warna legenda WKP PSC, 20-12-1983, Ons, Ept.-EXT (B3) PSC, 05-08-1970, EXT, 05-08-2000, Ons/Off, Ept.-EXT (B2) PSC, 16-01-2007, Ons, Eks. (B3)
Color Legend of WKP I.17 Duyung, W. NATUNA EXPL. I.39 Marquisa, SCHINTAR I.61 Selat Panjang, PETROSELAT
PSC, 16-01-2007, Off, Eks. (C2) PSC, 01-04-2011, Ons, Eks. (AB-2) PSC, 08-09-1991, Ons, Ept. (B2)
Wilayah Kerja
Working Areas
I.66 South Baturaja, ANUGERAH MS I.87 GMB Lematang, MEDCO-SAKA Wilayah II Area II II.22 Long Hubung L. Bagun, KALISAT
PSC, 19-12-2011, Ons, Eks. (B3) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 18-05-2010, Ons, Eks. (C4)
I.67 South Betung, TECHWIN I.88 GMB Muara Enim, TRISULA II.01 Alas Jati, INSANI BINA P II.23 Madura, SPE PETRO.
PSC, 01-04-2011, Ons, Eks. (B3) PSC, 30-11-2009, Ons, Eks. (B3) PSC, 09-08-2007, Ons, Eks. (D4) PSC, 13-11-2008, Off, Eks. (D4)
I.68 South Block A, RENCO ENERGY I.89 GMB Muara Enim I, PHE-INDO GAS II.02 Bangkanai, SALAMANDER II.24 Madura Offshore, SANTOS
PSC, 05-05-2009, Ons, Eks. (A2) PSC, 24-11-2010, Ons, Eks. (B3) PSC, 30-12-2003, Ons, Ept. (E3) PSC, 04-12-1997, Off, Ept. (D4)
I.69 South CPP, RANHILL PAMAI I.90 GMB Muara Enim II, PHE-MTN-INDON II.03 Barito, ALTAR II.25 Mahakam Hilir, SPC
PSC, 13-11- 2008, Off, Eks. (B2) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 12-02-1981, Ons, Eks. (E3) PSC, 13-11-2008, Off, Eks. (E3)
I.70 SE. Tungkal, GUJARAT I.91 GMB Muara Enim III, PHE-BTRAJA MTN II.04 Bawean, CAMAR RESCR. II.26 Mandala, BUMI HASTA-FORTUNE
PSC, 13-11-2008, Off, Eks. (B3) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 12-02-1981, Ons/Off, Ept. (D4 PSC, 18-05-2010, Ons, Eks. (D4)
I.71 South Jambi B, COPI I.92 GMB Muralim, DART II.05 Belayan, GERALDO ENERGY II.27 Muriah, PETRONAS
PSC, 26-01-1990, Ons, Ept. (B3) PSC, 24-11-2010, Ons, Eks. (B3) PSC, 21-11-2011, Ons, Eks. (B2) PSC, 20-05-1991, Off, Ept. (D4)
I.72 South Natuna B, COPI I.93 GMB Ogan Komering, OIG II.06 Bengara I, MEDCO II.28 NE Madura, TECHWIN
PSC, 16-10-1968, EXT 16-10-2016, Off, Ept.-EXT (C2) PSC, 05-05-2009, Ons, Eks. (B3) PSC, 17-09-1999, Ons/Off, Eks. (E2) PSC, 21-11-2011, Off, Eks. (D4)
I.73 S Sokang, LUNDIN-SALAMANDER I.94 GMB Ogan Komering II, EOM II.07 Bengara II, CONTINENTAL II.29 North Kangean, PETROJAYA
PSC, 06-12-2010, Off, Eks. (C2) PSC, 12-12-2004, Ons, Eks. (B3) PSC, 04-12-1997, Ons/Off, Eks. (E2) PSC, 16-01-2007, Off, Eks. (E4)
I.74 SW. Bukit Barisan, RADIANT I.95 GMB Rengat, INDON CBM II.08 Biliton, MITRA ENERGY II.30 North Madura, AWE
PSC, 13-11-2008, Ons, Eks. (B3) PSC, 30-11-2009, Ons, Eks. (B3) PSC, 30-12-2003, Off, Eks. (D3) PSC, 18-05-2010, Ons, Eks. (D4)
I.75 Sumbagsel, COOPER ENERGY I.96 GMB Sekayu, MEDCO SEKAYU II.09 Blora, SELE RAYA ENERGI II.31 North Sumbawa II, HUSKY
PSC, 01-04-2011, Ons, Eks. (B3) PSC, 26-06-2008, Ons, Eks. (B3) PSC, 30-11-2009, Off, Eks. (D3) PSC, 13-11-2008, Off, Eks. (E4)
I.76 Tonga, MOSESA PETROLEUM I.97 GMB Sijunjung, LION-BA II.10 Brantas, LAPINDO II.32 Offshore NW. Java, PHE
PSC, 16-01-2007, Ons, Eks. (A2) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 23-04-1990, Off, Eks. (D3) PSC, 19-01-1967, Off, Ept.-EXT (C3)
I.77 Tuna, PREMIER I.98 GMB Suban I, PHEM-SUBAN II.11 Bulu, PEARL OIL II.33 Off. Lampung I, ANP
PSC, 21-03-2007, Off, Eks. (A2) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 14-10-2003, Off, Eks. (D4) PSC, 21-03-2007, Off, Eks. (C3)
I.78 Tungkal, MONTD’OR OIL I.99 GMB Suban II, PHEM-SUBAN MG II.12 Cepu, MOBIL CEPU II.34 Ons & Off. Kangean, KANGEAN E.
PSC, 26-08-1992, Ons, Ept. (B3) PSC, 01-04-2011, Ons, Eks. (B3) PSC, 22-09-2006, Ons, Ept. (D4) PSC, 14-11-1980, Ons/Off, Ept.-EXT (E4)
I.79 W. Air Komering, TIARA BUMI I.100 GMB Tj. Enim, DART II.13 Citarum, PAN ORIENT II.35 Ons & Off. Madura Strait, HUSKY
PSC, 21-03-2007, Ons, Eks. (B3) PSC, 04-08-2009, Ons, Eks. (B3) PSC, 22-12-2006, Ons, Eks. (C4) PSC, 20-10-1982, Off, Ept. (D4)
I.80 W. Belida, ORCHARD ENERGY II.14 E. Bawean I, EAST BAWEAN LTD. II.36 Pangkah, HESS
PSC, 05-05-2009, Ons, Eks. (B3) PSC, 13-11-2008, Off, Eks. (D4) PSC, 08-05-1996, Off, Ept. (D4)
I.81 W. Glagah K, PETRONAS II.15 East Kangean, GREENSTAR II.37 Pasir, PASIR PETROLEUM
PSC, 30-11-2009, Ons, Eks. (A2) PSC, 22-12-2006, Off, Eks. (E4) PSC, 05-05-2009, Ons, Eks. (E3)
I.82 W. Kampar, SPE II.16 East Muriah, PEARL OIL II.38 Randu Gunting, PHE
PSC, 22-12-2005, Ons, Ept. (B2) PSC, 13-11-2008, Off, Eks. (D4) PSC, 09-08-2007, Ons/Off, Eks. (D4)
I.83 W. Tungkal, THREE GOLDEN II.17 East Sepanjang, EASCO II.37 Rangkas, LUNDIN
PSC, 13-11-2008, Off, Eks. (B3) PSC, 12-12-2004, Off, Eks. (E4) PSC, 27-05-2008, Ons, Eks. (C4)
I.84 GMB Batang Asin, BUMI & GLORY II.19 Karapan, AMSTELCO II.39 Sanga-sanga, VICO
PSC, 30-11-2009, Ons, Eks. (B3) PSC, 18-05-2010, Ons, Eks. (D4) PSC, 08-08-1998, Ons, Ept.-EXT (E3)
I.85 GMB Belida, SELE-ANDALAS II.20 Ketapang, PC KETAPANG II II.40 Seinangka-Senipah, KUTAI ETAM
PSC, 01-04-2011, Ons, Eks. (B3) PSC, 11-06-1998, Off, Ept. (D4) PSC, 12-12-2004, Ons, Eks. (E3)
I.86 GMB Indragiri Hulu, SAMANTAKA II.21 Kuala Pambuang, MENTARI II.41 Sibaru, MITRA ENERGY
PSC, 26-06-2008, Ons, Eks. (B3) PSC, 11-06-1998, Ons, Eks. (C4) PSC, 16-01-2007, Off, Eks. (E4)
Peta Wilayah Kerja Map of Working Areas 192 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 193
Wilayah Kerja
Working Areas
II.42 Simenggaris, JOB MEDCO II.65 GMB Barito Tapin, TGM II.85 Banyumas, LUNDIN Wilayah III Area III
JOB, 24-02-1998, Ons, Ept. (E2) PSC, 04-08-2009, Ons, Eks. (D3) PSC, 17-05-2001, Ons, Eks. (C4)
II.43 South Barito, MURPHY II.66 GMB Bentian Besar, RIDLAUTAMA II.86 Gunting, EXXON III.01 Ambalat, ENI
PSC, 27-05-2008, Ons/Off, Eks. (D3) PSC, 26-06-2008, Ons, Eks. (E5) PSC, 13-11-2008, Off, Eks. (D4) PSC, 27-09-1999, Off, Eks. (E2)
II.44 South Bengara II, ACG II.67 GMB Kapuas I, TRAN ASIA-BP II.87 NE. Madura III, ANADARKO III.02 Arafura Sea, COPI
PSC, 13-11-2008, Ons, Eks. (E2) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 12-12-2004, Off, Eks. (D4) PSC, 13-11-2008, Off, Eks. (HI4)
II.45 SE. Madura, ENERGI MINERAL II.68 GMB Kapuas II, KAPUAS-BP II.88 Off. Lampung II, PETRONAS III.03 Arguni I, ENI
PSC, 05-05-2009, Ons/Off, Eks. (D4) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 22-09-2006, Off, Eks. (C3) PSC, 21-11-2011, Off, Eks. (HI4)
II.46 SE. Sumatera, CNOOC II.69 GMB Kapuas III, GMU-BP II.89 Rembang, ORNA III.04 Attaka Field, INPEX
PSC, 06-09-1968, 06-09-1998, Off, Ept.-EXT (D4) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 14-10-2003, Off, Eks. (D4) PSC, 28-03-1991, Ons, Ept.-EXT (E5)
II.47 South Madura, AED II.70 GMB Kotabu, SATUI BASIN GAS III.05 Babar Selaru, INPEX
PSC, 14-10-2003 PSC, 04-08-2009, Ons, Eks. (E3) PSC, 21-11-2011, Off, Eks. (HI4)
II.48 Sunda Strait I, NIKO XXVI II.71 GMB Kutai I, KUTAI WEST CBM III.06 Berau, BP INDONESIA
PSC, 18-05-2010, Ons, Eks. (C4) PSC, 13-11-2008, Ons, Eks. (E3) PSC, 12-02-1987, Off, Ept.-EXT (H3)
II.49 Terumbu, AWE II.72 GMB Kutai II, EPHINDO-RAE III.07 Bone, MITRA ENERGY
PSC, 05-05-2009, Off, Eks. (C4) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 26-11-2010, Ons, Eks. (F3-4)
II.50 Titan, AWE, BARUNA & SILLO II.73 GMB Kutai Barat, SUGICO III.08 Bone Bay, MARATHON
PSC, 26-11-2011, Off, Eks. (C2) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 13-11-2008, Off, Eks. (F3-4)
II.51 Tuban, JOB PETROCHINA II.74 GMB Kutai Timur, SENYIUR-TTL III.09 Bontang, SALAMANDER
JOB, 29-02-1988, Off, Ept. (D4) PSC, 01-04-2011, Ons, Eks. (E2) PSC, 30-12-2003, Off, Eks. (E2)
II.52 Ujung Kulon, M3NERGY II.75 GMB MelakMendung I, EPHINDO III.10 Budong - Budong, TATELY N.V.
PSC, 21-03-2007, Ons/Off, Eks. (C4) PSC, 01-04-2011, Ons, Eks. (E2) PSC, 16-01-2007, Ons, Eks. (E2)
II.53 Wailawi, PERUSDA BENUO TAKA II.76 GMB MelakMendung II, DEEP & MONNET ISPAT III.11 Bukat, ENI
PSC, 22-12-2005, Ons, Ept. (E3) PSC, 01-04-2011, Ons, Eks. (E2) PSC, 24-02-1998, Off, Eks. (E2)
II.54 Wain, PANDAWA II.77 GMB Pulang Pisau, SIGMA & BLUE III.12 Bula, KALREZ.
PSC, 16-01-2007, Ons, Eks. (E3) PSC, 04-08-2009, Ons, Eks. (D3) PSC, 01-11-1969, EXT, 01-22-1999, Ons, Ept.-EXT (H3)
II.55 West Maduram PHE WMO II.78 GMB Sanga-sanga, VIRGIA-LASMO-BP III.13 Bulungan, ENI
JOA, 07-05-1981, Off, Ept. (D4) PSC, 30-11-2009, Ons, Eks. (D3) PSC, 12-12-2004, Off, Eks. (E2)
II.59 W. Sangata, KAL. KUTAI ENERGY II.79 GMB Sangatta I, PHE & SANGATTA WEST III.14 Buton, JAPEX
PSC, 16-01-2007, Ons, Eks. (E3) PSC, 13-11-2008, Ons, Eks. (E2) PSC, 16-01-2007, Ons, Eks. (F4)
II.59 W. Tanjung, MRI ENERGY II.80 GMB Sangatta II, VISI MULTI III.15 Buton I, PUTINDO BINTECH
PSC, 21-11-2011, Ons, Eks. (D3) PSC, 04-08-2009, Ons, Eks. (E2) PSC, 13-11-2008, Off, Eks. (F4)
II.60 GMB Bangkanai III, BANGKANAI ER II.82 GMB Tanah Laut, ASAM METHAN III.17 Cendrawasih II, REPSOL
PSC, 19-12-2011, Ons, Eks. (C3) PSC, 19-12-2011, Ons/Off, Eks. (E3) PSC, 18-05-2010, Eks. (I3)
II.61 GMB Bangkanai IV, BANGKANAI JP II.83 GMB Tanjung II, PHE III.18 Cendrawasih III, NIKO
PSC, 19-12-2011, Ons, Eks. (B3) PSC, 24-11-2010, Ons, Eks. (D3) PSC, 18-05-2010, Eks. (I3)
II.62 GMB Barito, TRANS ASIA & JINDAL II.84 GMB Tanjung IV, PHE III.19 Cendrawasih IV, NIKO-REPSOL
PSC, 30-11-2009, Ons, Eks. (D3) PSC, 01-04-2011, Ons, Eks. (E3) PSC, 18-05-2010, Eks. (E2)
II.64 GMB B. Banjar II, BARITO BG III.21 E. Kalimantan (W. Pasir), CHEVRON
PSC, 13-11-2008, Ons, Eks. (D3) PSC, 25-10-1968, EXT, 25-10-1998, Ons/Off, Ept.-EXT (E2-3)
Peta Wilayah Kerja Map of Working Areas 194 Laporan Tahunan 2011 BPMIGAS BPMIGAS Annual Report 2011 195
Wilayah Kerja
Working Areas