First Party/Owner Second Party/Owner

1|Page
First Party/Owner Second Party/Owner

2|Page
Area of Building:
Area of Ground Floor – 745Sq.ft
Area of First Floor – 550Sq.ft
Area of Portico and Staircase – 213Sq.ft
TOTAL AREA OF BUILDING - 1508Sq.ft

Cost for Building Material and Construction:


Cost of Ground Floor – 745Sq.ft
Cost of First Floor – 550Sq.ft
Cost of Portico and Staircase – 219Sq.ft
TOTAL COST - 1508Sq.ft

II. Technical specification


Foundation & Basement/Sub-Structure:
JSW Steel
JSW Cement
Concrete:
PCC

RCC
RCC cement mix of 1:2:4 for Column, Plinth beam, Lintel belt beam, Roof slab.

Brick work/Super-Structure:
First quality chamber bricks with Cement mix of 1:6 for 9” and 4.5” Thick wall.

Column

Water Tank:
Capacity of Water Tank is 8000Litres and will be constructed with Solid Block.
Overhead Water Tank:
Capacity OHT is 1000Litres and PVC tank will be placed at Terrace.
Septic Tank:
Capacity of Septic Tank is 8000Litres and will be constructed with Solid Block. 1 no. Outlet and 1 no.
Vent will be provided.

Flooring Finishing:
Built-up Area (Except Toilet & Bath)
Vitrified (Nano Grade), the design shall be select by the Owner with price range of 30Rs to 40Rs.

First Party/Owner Second Party/Owner

3|Page
For Toilet and Bath
Ceramic Tiles, the design shall be select by the Owner with price range of 25Rs to 35Rs.
For Portico
Parking Tile, the design shall be select by the Owner with price range of 25Rs to 35Rs.

Wall Finishing:
Built-up Area (Except Toilet & Bath)
Plastering of 10mm Thickness with P-Sand and 1:5 cement,
For Toilet, Bath, Kitchen
Ceramic Tiles up to 7Ft height, the design shall be select by the Owner with price range of 25Rs to
35Rs.
For Portico
Ceramic Tile, the design shall be select by the Owner with price range of 25Rs to 35Rs.
Painting
Nippon – Standard Grade

Electricity:
Electricity for construction of house should be provide by First Party only if required and will be
informed by second party as much as prior.

Electrical:
UPVC(Finolex) pipes and WIRE(Finolex) will be used for all Electrical lines.
1. Master Bedroom and Bedroom
2 No. Plugin Point, 1 no. Tube Light, 1 no. LED bed lamp, 1 no. ceiling Fan.
2. Living Room
2 No. Plugin Point, 2 no. Tube Light, 1 no. LED bed lamp, 2 no. ceiling Fan.
3. Kitchen
2 No. Plugin Point, 1 no. Heavy Plugin Point, 1 no. Tube Light, 1 no. LED bed lamp, 1 no. ceiling Fan.
4. Portico
1 No. Plugin Point, 1 no. Tube Light, 3 no. LED bed lamp. 1 no. MCB, 1HP Electrical Motor, 2 no. Gate
Lamp, Calling Bell.
5. Bathroom Toilet
1 No. Plugin Point, 1 No. Heavy Plugin Point, 1 no. LED lamp.

Water:
Water for construction of house should be supplied by Second Party.

Plumbing:
UPVC(Finolex) pipes will be used for all plumbing lines.

First Party/Owner Second Party/Owner

4|Page
Bath and Kitchen waste will be connected to drainage.
1. Kitchen
SS Sink, 1 no. Tap point and 1 no. Outlet will be provided.
2. Common Bath and Toilet – Ground Floor, First Floor
Colored Indian closet, 1 no. Shower point, 2 no. Tap point, 1 no. Outlet will be provided.
3. Master Bedroom, Bath and Toilet – Ground Floor
Western closet, 1 no. Shower point, 2 no. Tap point, 1 no. Outlet will be provided.
4. Common Bath and Toilet – First Floor
Colored Indian closet, 1 no. Shower point, 2 no. Tap point, 1 no. Outlet will be provided.
5. Outside
2 no. Tap point & 2 no Outlet in ground floor, 1 no. Tap point & 1 no Outlet in first floor will be
provided.

Curing:
Water curing will be done by Second Party.

Compound Wall and Gate:


Compound Wall of 6Ft Height from Portico level, hollow block will be used. Steel gate of 8Ft width and
6Ft height will be provided.

Extra Work:
No Extra work will be provided.
Other Details:
Roof height – 10’Ft and Basement 2’6” from road level.
Parapet Wall – 2’6”
Provision for Showcase

All the technical specification should be followed as mentioned.

Joinery Detail:

SL NO CODE WIDTH HEIGHT TYPE MATERIAL


DOOR
1 D1 3'6" 7' SINGLE DOOR TEAK DOOR
2 D2 3' 7' SINGLE DOOR SAL+PLYWOOD
3 D3 3' 7' DOUBLE DOOR SAL+PLYWOOD
4 D4 2'6" 7' SINGLE DOOR UPVC
WINDOW
5 W1 4' 4' OPEN TYPE UPVC
6 W2 3' 4' OPEN TYPE UPVC
VENTILATOR
7 V1 2' 1'6" LOUVERS UPVC

First Party/Owner Second Party/Owner

5|Page
III. SCHEDULE OF PAYMENT

Note:
The above agreement is accepted by both the parties.

Witness:
1. Name:
Address:

2. Name:
Address:

First Party/Owner Second Party/Owner