Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the
state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Achieved
Blending Proportion in %
IS Sieve (mm) Gradation Specification Limit
50 50 100
40.00 50.00 50.00 100.00 100 100.0
20.00 45.20 50.00 95.20 95-100 95.0
10.00 0.40 38.30 38.70 25 - 55 25.0
4.75 0.00 0.00 0.00 0 - 10 0.0
COARSE AGGREGATE BLENDING
110
% of Passing
100
90
80
70
60
50
40
30
20
10
0
1.00 10.00 100.00
IS Sieve in mm
Lower Limit. Upper Limits Centre Limit
Remarks :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the
state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Achieved
Blending Proportion in %
IS Sieve (mm) Gradation Specification Limit
60 40 100
40.00 60.00 40.00 100.00 100 100.0
20.00 57.12 40.00 97.12 95-100 95.0
4.75 0.00 38.60 38.60 30-50 30.0
0.600 0.00 13.32 13.32 10-35 10.0
0.150 0.00 0.08 0.08 0-6 0.0
ALL IN AGGREGATE BLENDING
% of Passing
110
100
90
80
70
60
50
40
30
20
10
0
0.10 1.00 10.00 100.00
IS Sieve in mm
Lower Limit. Upper Limits Centre Limit Achieved Limit
Remarks :
M15 PCC
Trial Mix No. : 1R Date :
A. DESIGN STIPULATION:
1. Grade of Concrete : M 15
2. Characteristic Strength @ 28 days : 15 Mpa
3. Target Mean Strength : 25 Mpa (MoRT&H Table:1700-5)
4. Nominal Maximum Size of Agg. : 20 mm
5. Workability in terms of Slump@ Pouring Point : 25 mm (MoRT&H Table:1700-4)
6. Exposure Condition : Moderate
7. Method of Concrete Placing : Direct
8. Degree of Quality Control : Very Good
8. As per MORT&H (Section 1703)
Minimum Cement content : 240 kg/Cum. for PCC (IS:456-2000,Table-5)
Maximum Water Cement Ratio : 0.5 for PCC (MoRT&H Table:1700-2,Note-iii)
B. SOURCE OF MATERIAL:
Cement : ACC OPC 43Grade (Conforming to IS 811
Coarse Aggregates : Goura Crusher -Kopal
Fine aggregate -River sand : Koppal - Nala
Admixture : SikaPlast4261 NS
Water : L&T Camp - Near Batching plant,
C. TEST DATA FOR MATERIAL:
1. Cement type / Brand : OPC 43 Grade/ACC
2. Specific Gravity of materials
a. Cement : 3.15
b. N Sand : 2.670 (Zone-1)
c. Coarse Aggregates- 20.0mm : 2.690
12.5mm : 2.690
d. Admixture : 1.21
3. Water Absorption of materials
a. N Sand : 2.20%
b. Coarse Aggregates- 20mm : 0.20%
12.5mm
: 0.30%
D. MIX DESIGN CALCULATION
i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000 = 627.8 Kg
Initial 80 90 85
30min 65 75 70
60min 55 65 60
90min 35 45 40
120min 25 25 25
Concrete Mix Temperature (0C) = 27.50C
M15 PCC
10.02.2016
(Conforming to IS 8112)
by wt of Cement Content
Weight per
0.03645m3. of
Concrete
(Agg. in Dry
Condition), Kg
9.43
5.46
28.39
21.89
21.87
0.042
Remarks
IE Representative
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state
under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
M20 PCC
Trial Mix No. : 2R Date :
A. DESIGN STIPULATION:
1. Grade of Concrete : M 20
2. Characteristic Strength @ 28 days : 20 Mpa
3. Target Mean Strength : 30 Mpa (MoRT&H Table:1700-5)
i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000 = 594.8 Kg
Initial 90 80 85
30min 70 70 70
60min 60 50 55
90min 40 40 40
120min 30 20 25
Concrete Mix Temperature (0C) = 28.0C
M20 PCC
10.02.2016
(Conforming to IS 8112)
by wt of Cement Content
Weight per
0.03645m3. of
Concrete
(Agg. in Dry
Condition), Kg
11.18
6.30
26.89
20.73
20.71
0.054
Remarks
IE Representative
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state
under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
M25 PCC
Trial Mix No. : 3R Date :
A. DESIGN STIPULATION:
1. Grade of Concrete : M 25
2. Characteristic Strength @ 28 days : 25 Mpa
3. Target Mean Strength : 36 Mpa (MoRT&H Table:1700-5)
i) Mass of 12.5mm Aggregate = f x Proportion of 12.5 mm x Sp. Gr. of 12.5mm x 1000 = 575.4 Kg
Initial 85 95 90
30min 60 70 65
60min 50 50 50
90min 35 45 40
120min 25 25 25
M25 PCC
26.02.2016
(Conforming to IS 8112)
by wt of Cement Content
Weight per
0.03645m3. of
Concrete
(Agg. in Dry
Condition), Kg
12.23
6.80
26.01
20.06
20.04
0.059
Remarks
IE Representative
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways
Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Compressive
Coarse Agg
Achieved Slump (mm) Strength
(kg)
(N/mm2)
Grade of Trial Cement Water Admix Admix W/C
Sl.No Date of Trial
Concrete No (kg) (kg) (Kg) (%) Ratio
28 Days
20.0 mm
12.5 mm
120 Min
N'Sand
30 Min
60 Min
90 Min
7 Days
Initial
1 M15 PCC 1R 10.02.16 270 135 831 628 628 1.22 0.45% 0.50 85 70 60 40 25 Awaiting
2 M20 PCC 2R 10.02.16 320 160 787 595 595 1.54 0.48% 0.50 85 70 55 40 25 Awaiting
3 M25 PCC 3R 10.02.16 350 175 761 575 575 1.68 0.48% 0.50 90 65 50 40 25 Awaiting
1R
ONCRETE MIX DESIGN TRAILS
Remarks
Trial Mix
Trial Mix
Trial Mix
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km
418+750 in the state of Karnataka under National Highways Development Project (NHDP) Phase
III on DBFOT(Toll)basis.
Independent Engineer :
SOURCE OF MATERIALS
Submitted by