Never have the stakes been higher for companies when it comes to making improvements to their
engineering work processes to maximize ROI on Capital Projects. Productivity has not developed in
decades – the average Capital Project schedule lags by 20 months and goes over budget by 80%1.
In many of today’s Capital Projects, there is a disconnect between FEED and Detailed Design.
In response, AVEVA are the first industrial software provider to pioneer a new solution to break
down the silos between these engineering disciplines.
Unified Engineering enables global multi-discipline teams to work concurrently in a common
data-centric environment, controlling and managing change across the entire project. This
breaks down the silos between FEED and detailed design. The simulation data created in FEED
is readily available for use in detailed design and is checked and validated in real-time, increasing
efficiency, minimizing risk, and maximizing return on investment on your Capital Projects.
The real cost of Engineering and Design

While the cost of engineering and design


typically amounts to just 10% of the overall
project cost, the work being carried out
here heavily influences what happens in
procurement and construction.
40% 40%
Procurement Construction
The leading cause of rework in project execution
is design errors and omissions, and according 10% 10%
to research, they contribute to over 5.4% of the Engineering
& Design
Other

total construction cost2. Engineering errors alone


make up 14.2% of the total contract value3.

Reducing engineering and design errors is Engineering & Design


Construction + C&SU Other Procurement
therefore an essential factor in lowering project
cost and minimizing risk of overruns and delays. COST OF REWORK COST OF ENGINEERING

Action must be taken within the engineering


5.4% 14.2%
phase to ensure these figures are minimized, and of total construction cost. * Love et al
The leading cause is errors in design
to lower total installed costs (TIC). * Hwang et al

Engineering & Design Procurement Construction

10% 40% 40%

Change of Pipe stress Pipe has now P&IDs need Different Wrong piping/
Re-ordering
one temperature calcs need to become safety to be updated Instrument equipment /
value be re-asessed cricital and re-issued arrangement specs to suppliers
needed

Equipment
Datasheets need Insulation
to be updated needs to be Spec Insulation Planning is no Wasted Cost Company
and re-issued added Change clashes longer valid materials Rework Delays Overrun reputation

Changes that take place in the engineering phase can heavily impact what happens in procurement and construction.

02 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Start leveraging your EPC 4.0 strategy

Companies’ are beginning to make progress on their Many have already started to leverage the latest
digitalization journey, finding the right applications for data-centric technology and work processes for their
digital transformation and seeing increasingly better workforce to collaborate and take control of their data,
returns on their investment. While the age-old market reducing the risk for errors, delays and increased project
environment challenges (such as supply and demand, cost throughout the asset lifecycle. By doing so they
cost and price) haven’t gone away, competitive are in a stronger position to become more competitive,
pressures are making the digital transformation increase their margins and win new business.
opportunity more pressing than ever.
This phase of the digitalization journey is what we call
EPC 4.0

EPC 1.0 EPC 2.0 EPC 3.0 EPC 4.0


Drafting table CAD Global execution Digital asset

Big gains with EPC 4.0 Missed opportunity connecting FEED and
Detailed Design
Imagine a project where all your engineering
departments are working together in a more seamless Construction Industry Institute™ (CII) reports:
way, where the latest validated information is available
to all project disciplines instantaneously.

Now is the time to discard tools such as MS Excel and “More mature and accurate FEED in the early
move towards a data-centric approach. stages of industrial projects improves cost
and change performance, while helping
This will become reality with Unified Engineering - a
meet financial performance and customer
new way to leverage your EPC 4.0 strategy and support
the project lifecycle every step of the way. Doing so satisfaction expectations.”4
removes the need to re-enter and re-check data and
saves time when producing deliverables; time which To reduce the number of iterations in FEED, process
can then be invested on further innovation within your engineers must work concurrently with other
business. disciplines. All information must be stored and
exchanged as data to ensure there is always clear
visibility of progress across the entire project. Unified
Engineering manages and drives positive change
within your business to ensure risk is minimized during
the early project phase right up to the Digital Twin
deliverable to the Owner.

03 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
The Unified Engineering Model
Unified Engineering consists of two main components, With the Unified Engineering model you can have:
the Unified Lifecycle Simulation Platform (one model),
yy Verification the plant will operate as expected, and
and Integrated Engineering and Design (one database).
that controls are properly configured
The two are combined to form a robust process model
and an engineering database that is able to synchronize yy Verification that equipment and piping are properly
through bi-directional flow of all 1D, 2D and 3D data on sized
one platform. The bi-directional integration of a steady- yy One single version of the truth that remains up-to-
state and dynamic process model with an engineering date
database makes the process seamless and eliminates
Book a demonstration today to see how you can
the need for MS Excel or other intermediate steps to
benefit from Unified Engineering.
transfer information between tools.

Simulation Platform Integrated Engineering & Design


One single platform instead of A single, data-centric platform for
multiple point solutions with discipline engineers to work together
and interactive Process and on, keeping all 1D, 2D and 3D
Control Engineering Unified Digital engineering data in one place
Engineering

Accurate and mature design deliverables


Efficient collaboration and automated updates
Bi-directional data flow
Digital Twin Data Model

The process model and the engineering database syncronizes through bi-directional flow from a single platform

04 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Unified Engineering: From Concept to Digital Twin

Process Cost Estimation

Mechanical Piping

Drafting Structural

Electrical Safety

The Unified Engineering environment allows for multi-discipline teams to collaborate across
Instrumentation 1D, 2D and 3D from one data-centric location Project Management

What Unified Engineering can do for you


Breaks down the silos Seamless transfer of the Process Model into
Detailed Engineering and Design
Unified Engineering breaks down the silos between
process and engineering design and ensures each Unified Engineering is not just about collecting
discipline has ownership of their data and the simulation data into a database. It is about empowering
reassurance that it is always correct. Early FEED is a your people to take full control, to manage the data
highly iterative process but with Unified Engineering effectively. Even when big changes have been made,
data is entered only once. The simulation data created Unified Engineering ensures they can be easily
in FEED is readily available for use in Detailed Design, validated.
increasing efficiency across projects. Procurement
errors and delays are avoided, and rework caused by
poor quality deliverables is eliminated.

05 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
The whole workflow is automated meaning less Unified Engineering is designed to effectively manage
requirement for manual input. Further changes after such changes. This will help you to easily verify that
the initial handover from FEED to detailed design will your business remains compliant with new industry
flag automatically. For example, a process engineer regulations such as new environmental or HSE
may need to change a temperature value which in turn regulations.
changes materials from plastic to metal. This may be
a small change in the process, but it has significant
consequences in engineering and a considerable impact
on cost.

EPC 4.0 Process simulation data, lists and data


sheets are all aligned with 3D models
Avoiding
procurement
Avoiding
rework in
and schematics, ensuring quality and errors and delays construction
validation of deliverables

Using AVEVA’s approach, data entry happens only once, and each discipline has ownership of their data and the reassurance that it is always correct.

Automated process validation of change

If a significant change needs to be made in engineering All these changes are critical to the outcome of the
design, it will automatically flag in process so that the project. Unified Engineering helps you check and validate
process engineer can validate the process or make change in real-time. This increases efficiency and
modifications as appropriate. productivity during the engineering phase of the project
and ultimately lowers the level of risk at start-up.

06 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Digital Twin deliverable to owner Integration with 3D Design

Have your Digital Twin ready to handover to the Owner. Unified Engineering uniquely integrates with 3D design
Unified Engineering ensures your model is accurate to create high quality deliverables. This means that
and up-to-date throughout the project lifecycle. The the full end-to-end suite of capabilities comes under
Digital Twin of your plant ensures scope for high margin one solution. Engineering data is managed together
for EPCs and ease of start-up and operations for the with the 3D and schematics data in the same project
Owner. environment, alongside all object-centric information
important to capital projects.

07 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Collaboration: The True Value of Unified Engineering

Once you have the tools in place, the true value By adopting Unified Engineering, costs are
of Unified Engineering is realized because of how reduced across the project lifecycle, especially from
effectively your teams can now collaborate together. commissioning and start-up and into operations. With
the improved profit margins, you can ensure your
Projects are started faster, process behavior is business is in a stronger position than ever to compete
optimized, and time is saved – time that can be invested for, and win, new projects and new contracts.
in new innovation for your business.

New Digital Streamline Reduce Cost, Maximize


Business Collaboration Risk and Delays Margins
Pursue new digital business Enable engineers to complete Minimize engineering errors and Reduce cost throughout capital
deliverables in the market deliverables faster, and with accelerate project execution: projects while improving the
with a Unified Engineering greater maturity so that you quality and reliability of
platform developed for can deliver your project on • 50%5 faster FEED stage engineering deliverables
this purpose time and on budget
• 30%6 increase in
engineering efficiency

• 5%7 of TIC cost reduction


in design phase alone

08 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Case Study: Vista Projects

16% under budget means going forward with AVEVA

Canada-based Vista Projects were commissioned by Results


a major Canadian oil & gas producer to deliver the yy 10-15% reduction in engineering man-hours during
FEED for a large-scale, greenfield, steam-assisted the FEED stage
gravity drainage (SAGD) facility. With an eye on the
project’s budget and timeline, the client wanted close yy Anticipate 30-40% reductions through detailed
collaboration with Vista to ensure timely project engineering phase
delivery, accuracy, transparency and security.

Vista Projects looked to AVEVA for an Integrated


Engineering & Design solution to consolidate project “The benefits of using an integrated software
data from multiple sources and make it available in a suite are that it really breaks down the silos
common location while also being able to validate and of the individual engineering disciplines and
compare data and check business logic. gives everybody access to everybody else’s
information as they need it.”

09 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
Case Study: Covestro

Next generation process simulation for the process lifecycle

Covestro is among the world’s largest polymer Early Results


companies. Its business activities are focused on the yy Successful implementation replacing previous tools
manufacturing of high-tech polymer materials and the
yy Very positive feedback from users
development of innovative solutions for products used
in many areas of daily life. yy Reduced cost, time, risk and delay
yy Engineers can focus on innovation
Faced with the challenge of using several tools that did
not integrate effectively across the process lifecycle,
Covestro turned to AVEVA to implement SimCentral
Simulation Platform. “Now we have one single platform, and
This implementation enabled Covestro to standardize everyone can use the same tools to work on
process engineering on a single platform across the the problems and focus on that instead of
plant lifecycle, and freed up its engineers to focus on learning a new tool every time.”
innovation and solving complex problems that increase
Covestro’s competitive advantage.

10 Boost Productivity and Profitability for Complex Capital Projects


with Unified Engineering
Final Thoughts

To minimize the risk of cost overruns and delays, you Our Unified Engineering solution enables you to
need an integrated, data-centric solution to manage leverage your EPC 4.0 strategy with data-centric
all engineering information in one place. This enables collaboration on a global scale, digitally through one
engineers from all disciplines to collaborate effectively, platform, so the entire process can be traced, tracked,
detect and identify changes as soon as they occur and and linked – from FEED engineering and detailed
compare and update them efficiently. design, all the way up to day-to-day operations and
maintenance of your asset.
Organizations who rapidly and accurately communicate
change in the FEED and detailed design phase will be
the most effective during procurement and construction LEARN MORE about Unified Engineering
to capitalize on project execution.
Book a demonstration today to learn how
AVEVA is a global provider of Industrial software. We Unified Engineering will maximize your return on
have 50 years of proven experience delivering plant investment
and process modelling technologies. We are trusted by
19 of the top 20 petroleum companies; 22 of the top 40 Click here to book a demonstration
chemical companies; and all 15 of the largest EPCs as
our customers.

11 Unified Engineering: A new proposition to break down the silos between FEED and
Detailed Design to minimize risk and maximize return on Capital Investment.
References
About the Author
Mirielle Taylor is Portfolio Marketing Manager
at AVEVA. She has a BA Honours in Visual
1. Reinventing Construction - a route to higher Communication from the Robert Gordon University
productivity in Aberdeen, UK and has 10+ years of experience in
McKinsey, Rice Global E&C Forum Roundtable, September 8th 2017 marketing and communications within the Oil & Gas
T.G. Jayanth, Expert – Capital Projects & Infrastructure, McKinsey & Co and engineering software technology sectors.
Mirielle is responsible for developing the global
2. Measuring the Impact of Rework on Construction marketing strategy, creating content and executing
Cost Performance campaigns to create awareness and demand
generation to drive growth for AVEVA’s Engineering
Bon-Gang Hwang1 ; Stephen R. Thomas, M.ASCE2 ; Carl T. Haas,
& Design portfolio.
M.ASCE3 ; and Carlos H. Caldas, M.ASCE4

3. Probabilistic Assessment of Design Error Costs


Love et al., 2014

4. Assessing the Maturity and Accuracy of Front End


Engineering Design
Construction Industry Institute™ (CII)

5. 50% Faster FEED Stage


Early savings reported from major Owner Operator, 2019

6. Vista Projects Case Study


https://sw.aveva.com/success-stories/vista-projects

7. The Data-centric approach to Project Execution


Savings reported from Vista Projects, 2017

Copyright © 2019 AVEVA Group plc and its subsidiaries. All rights reserved.