1800 PILING Enterprise House, O'Brien Rd., Carlow, Co. Carlow 1800 PILING FREEFONE 7 4 5 4 6 4 t +353 (0)59 9164419 f +353 (0)59 9164420 e mail@terradrive.ie w www.terradrive.ie FREEFONE 7 4 5 4 6 4 t +353 (0)59 9164419 f +353 (0)59 9164420 e mail@terradrive.ie w www.terradrive.ie Technical information sheet F005
How Many Test Piles And Which Type of
Pile testing is employed for; Test? This guide gives a brief • Design Validation The amount of testing required and type of testing depends on several factors. These introduction to the more • Quality Control Check include the following: common techniques of pile • Possible improvements in • Extent of site investigation information testing. Foundation Design • Information on similar piling techniques in the area or similar ground conditions. • Research & Development • Factor of safety used in pile design. • Experience of the Piling Contractor. • Cost and programming implications. Pile testing is an integral part of Static Load Test A general rule of thumb for testing rates can Static Load Testing (SLT) is the truest test of a any piled foundation construction pile performance available as it involves the be summarised as follows: process. It is important that the direct application of a physical load to the pile • Dynamic Pile tests; 10 - 15% of working piles techniques employed are while recording the corresponding settlement (Case only) at the head of the pile. • 20% CAPWAP or SIMBAT analysis of appropriate to the type of piling Dynamic Tests carried out In a perfect world all piles would be tested by employed, the requirements of the this method. However, as SLT’s are very • 1 Preliminary Static Test pile per 250 piles. • 1 working Static Test pile per 100 piles structure and also to the prevailing expensive and require approximately 5 days to carry out, it is not practical to test all piles in • 100% Integrity testing for CFA Bored piles. site conditions. this manner. General guidelines suggest Dynamic Pile Testing is normally associated testing 1% of piles by SLT. with driven piles - the testing hammer is There are various methods, both already on site! direct and indirect, of pile testing Dynamic Pile Testing Static Pile testing normally applies to bored Dynamic Load Testing (DLT) involves striking available from simple visual the head of the pile with a weight dropped piles, although it can also be applied to driven piles to act as a correlation with the Dynamic inspection to more intricate through a height, thus inducing a quick load results achieved on the site. techniques such as nuclear and response from the pile. Sensors, attached Integrity testing normally applies only to cast to the pile head, measure the acceleration and radiation methods. strain produced from the impact. From these in-situ piles. parameters, and using stress wave theory, Specification Pile testing is necessary because; predictions of the soil resistance are generated Having decided on the type(s) and amounts of that would be mobilised by the pile under testing required for the contract it is • In essence, it is the ground that static load conditions - this is referred to as important that the engineer in charge of the is being tested and not the Case Analysis. This test also proves the piling produces a clear and relevant structural element. As ground integrity of the pile. Further analysis can be specification for the testing. The ICE carried out using models of the pile/soil Specification for Piling and Embedded conditions vary, the performance interaction to provide predictions of Load Vs Retaining Walls sets out in detail the of the pile will consequently vary. Settlement performance of the pile - this is information required to be included in the referred to as CAPWAP or Simbat Analysis. specification. • Pile testing is necessary to Integrity Pile Testing validate design, to confirm Integrity Testing is a simple test to use to ground conditions and as a detect any anomalies in the pile shaft which quality control tool. may have occurred during construction. The How many piles should be tested? test itself involves the measuring of the 100% by Integrity Testing • In large scale projects pile response of a sound wave (produced by a testing can yield project savings hand held hammer) travelling through the 10 - 20% by Dynamic Testing shaft of the pile. This test is commonly used when employed to improve and on cast in-situ piles (CFA and Bored piles). 1 – 2% CAPWAP analysis rationalise pile design. Typically 100% of cast in-place piles are tested 1% by Static Load Test by this method. This test is not relevant to precast concrete or steel piles.
Enterprise House, O'Brien Rd., Carlow, Co. Carlow
1800 PILING FREEFONE 7 4 5 4 6 4 t +353 (0)59 9164419 f +353 (0)59 9164420 e mail@terradrive.ie w www.terradrive.ie Technical information sheet F005
How Many Test Piles And Which Type of
Pile testing is employed for; Test? This guide gives a brief • Design Validation The amount of testing required and type of testing depends on several factors. These introduction to the more • Quality Control Check include the following: common techniques of pile • Possible improvements in • Extent of site investigation information testing. Foundation Design • Information on similar piling techniques in the area or similar ground conditions. • Research & Development • Factor of safety used in pile design. • Experience of the Piling Contractor. • Cost and programming implications. Pile testing is an integral part of Static Load Test A general rule of thumb for testing rates can Static Load Testing (SLT) is the truest test of a any piled foundation construction pile performance available as it involves the be summarised as follows: process. It is important that the direct application of a physical load to the pile • Dynamic Pile tests; 10 - 15% of working piles techniques employed are while recording the corresponding settlement (Case only) at the head of the pile. • 20% CAPWAP or SIMBAT analysis of appropriate to the type of piling Dynamic Tests carried out In a perfect world all piles would be tested by employed, the requirements of the this method. However, as SLT’s are very • 1 Preliminary Static Test pile per 250 piles. • 1 working Static Test pile per 100 piles structure and also to the prevailing expensive and require approximately 5 days to carry out, it is not practical to test all piles in • 100% Integrity testing for CFA Bored piles. site conditions. this manner. General guidelines suggest Dynamic Pile Testing is normally associated testing 1% of piles by SLT. with driven piles - the testing hammer is There are various methods, both already on site! direct and indirect, of pile testing Dynamic Pile Testing Static Pile testing normally applies to bored Dynamic Load Testing (DLT) involves striking available from simple visual the head of the pile with a weight dropped piles, although it can also be applied to driven piles to act as a correlation with the Dynamic inspection to more intricate through a height, thus inducing a quick load results achieved on the site. techniques such as nuclear and response from the pile. Sensors, attached Integrity testing normally applies only to cast to the pile head, measure the acceleration and radiation methods. strain produced from the impact. From these in-situ piles. parameters, and using stress wave theory, Specification Pile testing is necessary because; predictions of the soil resistance are generated Having decided on the type(s) and amounts of that would be mobilised by the pile under testing required for the contract it is • In essence, it is the ground that static load conditions - this is referred to as important that the engineer in charge of the is being tested and not the Case Analysis. This test also proves the piling produces a clear and relevant structural element. As ground integrity of the pile. Further analysis can be specification for the testing. The ICE carried out using models of the pile/soil Specification for Piling and Embedded conditions vary, the performance interaction to provide predictions of Load Vs Retaining Walls sets out in detail the of the pile will consequently vary. Settlement performance of the pile - this is information required to be included in the referred to as CAPWAP or Simbat Analysis. specification. • Pile testing is necessary to Integrity Pile Testing validate design, to confirm Integrity Testing is a simple test to use to ground conditions and as a detect any anomalies in the pile shaft which quality control tool. may have occurred during construction. The How many piles should be tested? test itself involves the measuring of the 100% by Integrity Testing • In large scale projects pile response of a sound wave (produced by a testing can yield project savings hand held hammer) travelling through the 10 - 20% by Dynamic Testing shaft of the pile. This test is commonly used when employed to improve and on cast in-situ piles (CFA and Bored piles). 1 – 2% CAPWAP analysis rationalise pile design. Typically 100% of cast in-place piles are tested 1% by Static Load Test by this method. This test is not relevant to precast concrete or steel piles.
Enterprise House, O'Brien Rd., Carlow, Co. Carlow
1800 PILING FREEFONE 7 4 5 4 6 4 t +353 (0)59 9164419 f +353 (0)59 9164420 e mail@terradrive.ie w www.terradrive.ie Technical information sheet F005.
TERRADRIVE PRODUCT PORTFOLIO
PRECAST HOUSE FOUNDATION
TERRADRIVE PILING AND FOUNDATIONS LTD.
PRECAST CONCRETE PILING
A Brief Guide to Pile Testing LOW VIBRATION PILING