Nawaloka Piling (Pvt)Ltd.

Completed Major Projects


NAWALOKA GROUP
Work in Hand
as at 25.05.2011

Client: Taj Airport Garden Hotel

1. Construction of Pile Foundation for 10 MW Wind power plant at Udappuwa,


Puttlam
Contract value : Rs. 80,985,325.00
(600mm dia – 371 nos)

Client: Powergen Lanka (Pvt) Ltd

2. Piling works for Construction of 216 Housing Units(Phase 1, Stage 1) at Sala-


mulla- Kolonnawa

Contract value : Rs. 60,875,672.25


(750 mm dia – 52 nos & 900 dia mm – 40 nos)

Main Contractor : SLLRDC


Completed Major Projects

Bridges
Project Client Completed
Kospalana Bridge Maga Engineering (Pte) Ltd 2000

Kirullapane Bridge Road Development Authority 2002

Gampola Bridge Road Development Authority 2002

Tsunami Affected Kumagai Gumi Co. Ltd 2006


Bridges
• Magalle Bridge
• Seenigama Bridge

Southern Transport Kumagai Gumi Co. Ltd 2006


Development Project
B – 07 Bridges

Lunawa Environment & Keangnam Lanka 2007


Community Development
Project – Bridges
• Sylvester Road
• Bodhirukkarama Road
• Enarast Place
• Angulana Station Road

Tsunami Affected Areas Maga – CDIG Joint Venture 2010


Rebuilding Project
Potuvil, Akkaraipattu
Bridge No. 357/1

Tsunami Affected Areas Maga – CDIG Joint Venture 2010


Rebuilding Project
Potuvil, Akkaraipattu
Bridge No. 361/2
Kaduwella Bridge Vonlan Construction (Pvt) Ltd 2011
Power Plant Projects
Project Client Completed
AES Kelanithissa Power Larsen & Toubro Ceylinco 2001
Plant Project (Pvt) Ltd
Constriction of Proposed 300 LTL Projects (Pvt) Ltd 2008
MW CCPP Project
at Kerawalapitiya
Kerawalapitiya Kotugoda Bela International (Pvt Ltd) 2008
220 KV Transmission Line

Pumping Stations
Project Client Completed

Madampitiya Sewerage Main Contractor: 2008


Pumping Station, Per Aarsleff A/S.
Madampitiya (Secant Piles)
Wellawatte Pumping Angerlehner International 2009
(Secant Piles) Construction group
Colombo Suwarage Angerlehner Hoch-Und 2010
Rehabilitation Project Tiefbau Gesellsc haft
Southern Catchments
Wellawatta Pumping Station
– Supper Structure & Sheet
Pile Works

Apartments

Project Client Completed

High-rise Apartment CT. Properties Ltd 2004


Complex At 51 Braybrooke
Pace, Colombo 02 For
Ct Properties – Empire City

Proposed Apartment CT. Properties Ltd 2004


Complex Trillium Residencies
* Phase – 1 (Without Materials)
* Phase – Ii (Without Materials)
* Phase – Iii (Without Materials)
Iceland Residencies at ICC 2005
49/4,Glle Face Terrence,
Colombo 03
Ceylinco celestial Ceylinco Homes 2006
residencies Project Secant Main Contractor
Piles Maga Engineering(Pte) Ltd

Fairmount Residencies at Maga Engineering Pte Ltd. 2007


Perera Mawatha, Rajagiriya
Dawson Grand Tower Keangnam Lanka 2007
Project (Pvt) Ltd
Eco Towers a High rise Eco Homes Lanka 2008
Resident ional Cum
Commercial Towers
Apartment Building at Wickramarathne 2008
Castle Street Developers (Pvt) Ltd
Water’s Edge Residencies, Asia Pacific Golf courses 2008
Battaramulla Ltd.
Water’s Edge Residencies, Asia Pacific Golf courses 2008
Battaramulla Ltd.

Building Complex

Project Client Completed

Piling Works for Proposed Exim House (Pvt) Ltd 2010


Warehouse Extension for
M/s Exim House (Pvt) Ltd

Pile Foundation for the Maga Engineering (Pvt) Ltd 2010


Administrative Complex
Hambantota Port
Development Project
Piling Works for Proposed Sri Lanka Army 2010
Six Storied Hospital Building
(Building No. 01) at Military
Hospital Narahenpita
Piling Works for Unilever Unilever Sri Lanka 2010
Sri Lanka Ltd., at Horana
Export Processing Zone,
Bored of Investment of Sri
Lanka (Original qty +
additional piles + short piles
+ sustention)

Piling Works for State Engineering 2010


Refurbishment of Kettarama Corporation of Sri Lanka
R. Premadasa International
Stadium for Sri Lanka
Cricket at Colombo Block–B

Piling works for Proposed Sanken Lanka (Pvt) Ltd 2010


Building for Auditor
General’s Department at
Battaramulla

Other Projects

Project Client Completed

Greater Kandy Water Taisei Corporation 2005


Supply Project
Piling work for the Access Engineering Ltd 2008
Kelaniya Fly over (Railway
Crossing) North & South
Flyovers – Phase I & II

Piling works for New Oil China Harbour Engineering 2010


China Harbour Engineering Company Ltd
Company Ltd 2010
Terminal Hambantota
Port Development Project
(Phase 1)

Reinforced Concrete Lion Brewery (Ceylon) Plc 2010


In-Situ Piling for the
Proposed Extension to the
Fermentation Celler
Consisting for 2 Nos. Tanks
for Lion Brewery Ceylon Plc
Piling Works for Sewer Ranasiha Lanka 2010
Treatment Plant for Wild Construction(Pvt) Ltd
Life Conservation Project,
Battaramulla

Construction of Super Angerleheaner GMBH 2010


Structure for Swerage
Pumping Station at
Wellawatte

Sheet Piling work & Angerleheaner GMBH 2010


Trench Preparation work
For the Inlet Pipe
Connection at Pump Station
Wellawatte

Potrebbero piacerti anche