Sei sulla pagina 1di 1

PART REQUESTION SLIP No :

Tgl terbit : 15 Maret 2015


PT. ANEKA SERVIS
INDONESIA FOR WORK ORDER Revisi : 00

Model : unit ID: SMu/JAM:. projects:

Charge To Activity Equipment Charge To Category Equipment


A B C D
E F G Generator Supporting Marine Main Equipment
H Set

WO # : ____________WO Desc / Keterangan : _______________________ WO Date :___________________

Component Name : front axle Group No : Position :

Failure Outline Requirement Date :


Ringkasan Kerusakan Tanggal dibutuhkan :

Priority :
P3 P2 P1
Failure Cause
Penyebab Kerusakan Duration :

Prepared by/Date Acknowledge By/Date Approved By/Date


dipersiapkan oleh diketahui disetujui

sulistiyo

No Part Number Part Description Qty Uom Remarks


1 stud bolt wheel 30 untuk plant bojong

LEGEND ( keterangan ) :
WO = Work Order (Perintah Kerja). HM/SMU = Hour Meter/Service Meter Unit (Jam Operasi Unit). Generator Set = Genset.
Supporting = Alat Pendukung (Trucks, LV, Water Flow, dll). Marine = Mesin Kapal. Main Equipments = Alat Berat (A2B).
P1 = Proritas 1 (Estimasi Parts 1 Minggu). P2 = Prioritas 2 (Estimasi Parts Sebulan). P3 = Prioritas 3 (Estimasi Parts Dua Bulan).
A = Un-sign ( Kerusakan karena faktor lain). B = PM ( Preventive Maintenance ). C = Top Overhaul ( TOH )
D = General Overhaul (GOH). E = Abuse ( Kerusakan belum pada waktunya ). F = PCR ( Program Component Replacement ).
G = Technical Analysis ( TA ). H = Accident.

Potrebbero piacerti anche