Sei sulla pagina 1di 1

Mateial Schedule

PROCUREMENT DATE
TYPE OF
UNIT PRICE (Php) January May
MATERIALS
QUANTITY AMOUNT QUANTITY AMOUNT
Cement bag 230.00 506 116,380.00 506 116,380.00
Sand m^3 150.00 29 4,350.00 29 4,350.00
Gravel m^3 100.00 57 5,700.00 57 5,700.00
Steel (10mm) kg 155.00 918 142,290.00 512 79,360.00
Steel (16mm) kg 230.00 121 27,830.00 104 23,920.00
Steel (20mm) kg 265.00 300 79,500.00 221 58,565.00
Steel (25mm) kg 315.00 9 2,835.00 0 -
Wood ( 2 x 2 x 8 ) pc. 190.00 96 18,240.00 44 8,360.00
Wood ( 2 x 4 x 8 ) pc. 410.00 105 43,050.00 51 20,910.00
Plywood 1/4" pc. 355.00 100 35,500.00 30 10,650.00
Plywood 3/4" pc. 1,090.00 100 109,000.00 20 21,800.00
3/4 nail kg 1,200.00 30 36,000.00 30 36,000.00
Tie wire kg 1,200.00 25 30,000.00 20 24,000.00
Ply Board pc. 810.00 100 81,000.00 30 24,300.00
Corrugated GI Sheet pc. 480.00 20 9,600.00 85 40,800.00
PVC Pipes 1" pc. 165.00 40 6,600.00 90 14,850.00
PVC Pipes 3/4" pc. 120.00 50 6,000.00 80 9,600.00
CHB 6" pc. 11.00 2773 30,503.00 2000 22,000.00
CHB 4" pc. 16.00 2000 32,000.00 1717 27,472.00
Paint Flat Latex gallon 520.00 20 10,400.00 40 20,800.00
Total 826,778.00 Total 569,817.00