Sei sulla pagina 1di 2

DAFTAR RIWAYAT HIDUP

A. DATA PRIBADI
Nama : MAZENAL
Tempat, tanggal lahir : Prabumulih, 15 Februari 1986
Alamat : Jl. Tanjung Pura Gg. Orari Kel. Pelawi Utara
Jenis Kelamin : Laki - Laki
Status : Menikah
Agama : Islam
Kebangsaan : Indonesia
No. Hp : 0821 9041 9454
Email : anugrah.mazen@gmail.com

B. RIWAYAT PENDIDIKAN
1. Pendidikan Formal
a. Tahun 1992 – 1998 : SDN 3 PRABUMULIH
b. Tahun 1998 – 2001 : SMP MUHAMMADIYAH PRABUMULIH
c. Tahun 2001 – 2004 : SMK TAMAN SISWA 2 PALEMBANG

C. KEMAMPUAN
 Sebagai Fitter, Pipe Fitter, Material Control, di Contruction Structure &
Fabrication

D. PENGALAMAN Kerja

Periode Of Reason Of
No Company Name Position Project/Location
Service Leaving
PT. SURYA MAS AE Conversion November
PERKASA Project 26, 2018 Contract
1 PIPE FITTER 1
Pkl.Kerinci Until June Complete
Pelalawan Riau 25, 2019
PT. TRUBA JAYA PLTU Kalsel August 19,
ENGINEERING MECHANICAL 1_2x100 MW 2018 Until Contract
2
FITTER 1 CFPP Project November Complete
Tabalong, Kalsel 10, 2018
PT. SURYA MAS AE Conversion July 12,
PERKASA Project 2018 Until Contract
3 PIPE FITTER 1
Pkl.Kerinci August 15, Complete
Pelalawan Riau 2018
PT. September
PRAKARSALANGGENG MATERIAL Vanilla Project 18, 2017
Contract
4 MAJU BERSAMA CONTROL IKBB Pangkalan Until
Complete
Kerinci December
17, 2017
PT. MITRINDO November
Installation of
DUTAPRAKARSA 30. 2015
Equipment and Contract
5 FITTER 1 Until
Prefabricated Complete
December
Tank
25, 2016
PT. ADHI SINOHYDRO PLTU Kaltim
September
CONSORTIUM 2x110 MW
08, 2014 Contract
6 FITTER 1 Teluk
Until July Complete
Balikpapan
05, 2015
Project
PT. JURONG May 24,
ENGINEERING Ethanol Plant 2013 Until Contract
7 FITTER 1
LESTARI Project July 31, Complete
2013
PT. ARKON PRIMA CFSPP 2x135 October 31,
INDONESIA MATERIAL MW Kebon 2012 Until Contract
8
CONTROL Agung – Lahat March 03, Complete
Project 2013
PT. GAKA KARYA PLTU Lampung, October 10,
ENGINEERING 2x100 MW Coal 2011 Until Contract
9 FITTER 1
Fired Steam April 30, Complete
Power Plant 2013
PT. GAKA KARYA March 25,
ENGINEERING Recovery Boiler 2008 Until
10 FITTER 2
#5 RAPP Project August 10,
2009