IECEP-Manila Form 1 S.

2011 TEST QUESTIONS


1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
As per Philippine standard, frequency allocation of AM Radio Broadcasting is from…

Choices:
a. 535 to 1605 kHz c. 535 to 1705 kHz
b. 526.5 to 1605 kHz d. 526.5 to 1705 kHz

ANSWER:
d. 526.5 to 1705 kHz

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 2.2 of MF Technical…, p.1

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Part of broadcasting in a day that refers to that period of time between 1000 UTC to
2200 UTC. UTC stands for Universal Time Coordinates.

Choices:
a. daytime period c. experimental period
b. nighttime period d. primetime period

ANSWER:
b. nighttime period

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 2.23 of MF Technical…, p.3

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
An AM broadcast service area in which groundwave field of 1mV/m (60dBu) is not
subject to objectionable interference or objectionable fading.

Choices:
a. primary service area c. intermittent service area
b. secondary service area d. none among these

ANSWER:
a. primary service area

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 2.27 of MF Technical…, p.3

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
In antenna mast or tower construction, the required obstruction painting and/or lighting
must be imposed on mast or tower more than … from the ground level.

Choices:
a. 100 ft b. 150 ft c. 200 ft d. 250 ft

ANSWER:
d. 150 ft

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.1.1.2 of MF Technical…, p.6

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Regarding the design of AM antenna, what should be the polarization of the radiator?

Choices:
a. horizontal b. vertical c. circular d. elliptical

ANSWER:
b. vertical

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.1.2.1 of MF Technical…, p.6

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
As per Phillipine standard, what is the minimum frequency separation in any service
area for adjacent AM radio stations?

Choices:
a. 40 kHz b. 200 kHz c. 36 kHz d. 300 kHz

ANSWER:
c. 36 kHz

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 6.2 b) of MF Technical…, p.18

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the maximum power allowable for remote pick-up stations used as broadcast
auxillary services for AM and FM broadcast stations?

Choices:
a. 10 W b. 15 W c. 35 W d. 200 W

ANSWER:
c. 35 W

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 4.2 of MF Technical…, p.14 and
Sec. 6.2b of FM Technical…, p.15

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the classification of an FM station having an ERP not exceeding 30kW?

Choices:
a. Class A b. Class B c. Class C d. Class D

ANSWER:
b. Class B

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 4.2 of FM Technical…, p.5

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the modulation used for the stereophonic subcarrier of FM composite baseband
signal?

Choices:
a. AM DSB FC c. AM SSB
b. AM DSB SC d. AM VSB

ANSWER:
b. AM DSB SC

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 5.3 d & e of FM Technical…,
p.11

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the pilot subcarrier frequency used in FM stereophonic transmission?

Choices:
a. 15 kHz b. 19 kHz c. 30 kHz d. 38 kHz

ANSWER:
b. 19 kHz

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 5.3b of FM Technical…, p.11

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
The output power of an FM transmitter is 5 kW. If the power loss in transmission line is
around 10 W and the antenna has a power gain of 6 dB, what is the ERP of the station
in kW?

Choices:
a. 5 kW b. 30 kW c. 20 kW d. 19.96 kW

ANSWER:
d. 19.96 kW

SOLUTION (IF PROBLEM SOLVING):


GANT = 6 dB = 4
ERP = (5000 – 10) x 4 = 4990 x 4 = 19,960 W or 19.96 kW

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 2.10 of FM Technical…, p.1

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Frequency allocation of FM broadcast in the Philippines…

Choices:
a. 535 – 1605 kHz c. 50 – 15000 Hz
b. 88 – 108 MHz d. 174 – 216 MHz

ANSWER:
b. 88 – 108 MHz

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 2.1 of FM Technical…, p.1

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the color TV system adopted by the Philippines?

Choices:
a. NTSC c. SECAM
b. PAL d. none among choices

ANSWER:
a. NTSC

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2 of TV Technical…, p.7

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Exact value of color subcarrier frequency (MHz) is …

Choices:
a. 3.579554 c. 3.580545
b. 3.579455 d. 3.579545

ANSWER:
d. 3.579545

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.1 of TV Technical…, p.7

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Determine the visual carrier frequency of TV channel 9.

Choices:
a. 175.25 MHz b. 187.25 MHz c. 193.25 MHz d. 199.25 MHz

ANSWER:
b. 187.25 MHz

SOLUTION (IF PROBLEM SOLVING):


fNLB = 174 + (N – 7)6, using Arithmetic Progression
f9LB = 174 + (9 – 7)6 = 174 + (2)6 = 174 + 12 = 186 MHz, low band frequency of
channel 9
fVC = 186 + 1.25 = 187.25 MHz, visual carrier frequency of channel 9

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Table 1 of TV Technical…, p.7 and
Figure 6, p.35

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
What is the maximum allowable ERPs for channels 7 – 13 in Metro Manila and Metro
Cebu?

Choices:
a. 100 kW c. 350 kW
b. 316 kW d. 1 MW

ANSWER:
d. 1 MW

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 8.2.3 of TV Technical…, p.14

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
At NTSC standard, the number of lines per frame = ________ lines/frame

Choices:
a. 485 b. 525 c. 625 d. 585

ANSWER:
b. 525

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.1 of TV Technical…, p.7

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
At NTSC standard, line frequency = 15734.264 Hz. What is the equivalent line period?

Choices:
a. 66.556 usec b. 65.556 usec c. 63.556 usec d. 64.556 usec

ANSWER:
c. 63.556 usec

SOLUTION (IF PROBLEM SOLVING):


fH = 15734.264 Hz
H = 1 / fH = 1 / 15734.264
H = 63.556 x 10-6 = 63.556 usec

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.1 & 3.2.3 of TV Technical…,
p.7

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
Nominal RF bandwidth of NTSC TV channel…

Choices:
b. 4.5 MHz c. 6 MHz d. 5.35 MHz
a. 4.2 MHz

ANSWER:
c. 6 MHz

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 3.2.2 of TV Technical…, p.7

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila
IECEP-Manila Form 1 S.2011 TEST QUESTIONS
1. Please Use One Page per Question.
2. Fill-out all needed information.
3. Submissions with incomplete data will not be considered.

PROFILE OF CONTRIBUTOR

Name of School NEW ERA UNIVERSITY

Address No. 9, CENTRAL AVE., NEW ERA, QUEZON CITY

Signature over Printed ENGR. EFREN T. PINEDA, PECE


Name, Position ECE Coordinator

Area of Specialization Communications / Broadcast Engineering and Acoustics

Please indicate the subject:


General Engineering and Applied Sciences
Electronics System and Technologies

QUESTION:
A land mobile station used for the transmission of TV program materials and related
communications from the scenes of events occuring at remote points from TV broadcast
station studios to TV broadcast station.

Choices:
a. TV Pick-up station c. TV Inter-city Relay station
b. TV STL station d. TV Satellite link station

ANSWER:
a. TV Pick-up station

SOLUTION (IF PROBLEM SOLVING):

Reference: Title of the book, author and page


KBP Technical Standards and Operating Requirements for Broadcast Stations in
the Philippines, KBP Technical Committees, Sec. 10.2 of TV Technical…, p.16

Endorsed by:

Engr. Efren T. Pineda, PECE


School Representative IECEP Manila

Potrebbero piacerti anche