Sei sulla pagina 1di 10

SIGMA Date : 2007.04.

25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 1 / 10

FIM E Handrail part

Index

E. Handrail part ........................................................................................... 1~10


1.Handrail examination................................................................................... 2
2.Upper Handrail driving device and lower isolation roller examination......4
3. Handrail manual............................................................................................9

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 2 / 10

FIM E Handrail part

E. Handrail part

1. Handrail Examination
1.1 Examine dust and damnification on Entry Box.
1.2 When ES is running, examine temperature of handrail with hand or laser
thermometer.
1.3 Affirm the seclusion state of bottom bibcock[Refer to Handrail testing manual]
1.4 Affirm if handrail can move15~20mm, when pull emphatically in the level of top
bibcock.
1.5 Affirm if handrail of Terminal HR Frame is running aslant.

1.6 In design ,the speed of handrail is faster than Step about 1.0%,but because of

circulate resistance, the speed of handrail is faster than Step about 0.5%. If the

speed is slower than that, should examine the following items.

-Examine if Chain Roller was adjusted rightly

- If the outer diameter of handrail driving pulley is too small? (Φ457)

Abrasion limit:When outer diameter is smaller than Φ453, should change it .

- If the isolation state of roller that use for isolating Handrail is appropriate?
1.7 If handrail is normal, if surface of guide pulley is attrited?

When HR Driving Chain has exceptional Knocking, should examine the


following items.
- If Handrail Driving Chain (#60-2) is too loose?
- If each chain elongate unconventionally, if Chain Roller is frayed?
- If the oiling state is well?

- If the joggle state of each chain is smooth,when flank of sprocket is pressed,


examine the plane degree of chain wheel.
- If handrail endothelium is frayed unconventionally?

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 3 / 10

FIM E Handrail part

1.9 Affirm if when ES is running, the handrail is acclivitous in the part of Inlet &Outlet
HR Guide Roller.
1.10 Affirm if the edge part of Handrail contact with Driving Pulley.

1.9 1.10

1.2
1.4
1.2
1.1
1.5
1.2 1.7
1.9 1.6

1.3
1.1 1.3
1.5

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 4 / 10

FIM E Handrail part

2.Upper Handrail driving device and lower isolation roller examination


2.1 Precondition
Refer to precondition work.
2.2 Disassemble 5 Steps.
2.2.1 Refer to work process of disassembling step
2.3 E-Stop Button should be On, run ES and remove the part of disassembling step
to the part of handrail driving device.

2.4 Disassemble bottom MSB, cover the Dust Cap.

Inlet Roller Device

Outlet Roller Device

Handrail Driving Pulley

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 5 / 10

FIM E Handrail part

2.5 Disassemble Inside Deck of both sides


2.5.1 Handle of MCCB should be Off.
2.5.2 Disassemble Skirt guard and M4 Bolt.
2.5.3 Disassemble Inside Deck.
Notice: Don't assemble aluminium alloy Mold.
2.5.4 If Skirt Guard Lighting is applicable, disassemble Lighting of both sides.
2.5.5 Put inside Deck in the safety place.
2.6 Disassemble Skirt Guard
2.6.1 Disassemble top Bolt.
2.6.2 Disassemble Skirt Guard, and put them in a safety place.

Disassemble them when examine


top HR driving device

Disassemble it when examine


bottom isolation Roller.

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 6 / 10

FIM E Handrail part

2.7 Examine Handrail driving device of both sides.


2.7.1 Handle of MCCB should be On.
2.7.2 Make ES run with MSB, and remove the part of disassembling Step to the
part of handrail driving device.
2.7.3 Handle of MCCB should be Off.
2.7.4 Examine clearing state
2.7.5 Examine if shaft of Handrail driving device and sprocket are fixed firmly.
2.7.6 Examine abrasion and damnification state of bottom pressing Chain Roller,
Pulley and intake Roller
2.8 Tension adjustment
2.8.1 Release or tighten M16 Nut of slider in order to adjust tension of handrail
driving chain.
2.8.2 Tension of chain is within 10mm(sagging value) with pressing force of 5kg.
2.8.3 Handrail driving test: Set escalator into up and down operation and pay
attention to unusual noise after finishing chain tension work.

When assembling,
dimension tolerance
between Pulley side and
Roller side must be comply
(4 points)

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 7 / 10

FIM E Handrail part

90~95

2.7

5kgf

2.8

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 8 / 10

FIM E Handrail part

2.9 Adjust the Handrail isolation Roller


2.9.1 Run Up (2 times), form nature “R” in the part of isolation roller.
2.9.2 In the state of isolation Roller contact with Handrail scarfskin,after lift up
isolation roller about 20~25mm, fix with M12 Bolt.
2.9.3 When ES run Up ,affirm if handrail of bottom terminal part is isolated.
2.9.4 After assemble Handrail , Stop running after ES run up,adjust according
to the following dimension.
2.9.5 The adjustment quantity of Handrail is 86mm.
2.9.6 Isolation GUIDE of A part can’t press handrail,the Roller should support
scarfskin of Handrail.

Isolation Guide

"A" isolation Roller

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 9 / 10

FIM E Handrail part

2.9.7 Assemble Skirt Guard and Inside Deck according to the reverse sequence
of disassembling
2.9.8 Handle of MCCB should be On.
2.9.9 Make ES run with MSB, remove the part that lack of step to the bottom
machine room side.

2.9.10 Connect MSB to the bottom Joint Box, E-Stop Button should be OFF.

2.9.11 Assemble step according to the reverse sequence of disassembling


2.9.12 Install safety guard in the machine room.
2.9.13 Disassemble MSB.
2.9.14 E-Stop Button of bottom Joint Box should be On.
2.9.15 Cover the Floor.
2.10 Carry through the finishing work of safety maintenance.

3.Handrail manual
This kind of handrail only limit to use indoor,if use in the special environment,
we can offer additionally. To ensure use the rubber handrail reasonable,keep
nicer capability,prolong use lift,please user cooperate actively,must note the
following items.
3.1 Handrail type:
3.1.1 Choose handrail should be the same as escalator type.。

3.2 During transport and deposited:


3.2.1 Should avoid casing disrepairing, avoid drench and solarization。
3.2.2 Handrail should keep flat, don’t superpose , and stockpile date don’t exceed

two months,avoid handrail strictly distortion, and debug difficult.

3.2.3 Avoid handrail contact with oil, acid , alkali and shape goods。

3.2.4 Temperature of deposited handrail is 15~35℃,humidity is 60~80%.。

3.3 During handrail install and debug:


3.3.1 When remove the casing of handrail,adopt frock measure,ensure rubber

surface and metal framework don’t damnification. When install and convey,

both sides of handrail , the swerve semidiameter is 300mm at least。

Unpublished Work Copyright © SIGMA Elevator Company


SIGMA Date : 2007.04.25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : E- 10 / 10

FIM E Handrail part

3.3.2 Before handrail install and debug,should check coarse degree and install
parallel degree of accessory that contact with handrail,avoid whisht friction.
3.3.3 Handrail installation can’t too close,avoid heating during running

3.3.4 After install and debug,if disassemble handrail, should resume plastic film

enswathement,both side of handrail , the swerve semidiameter is 300mm at

least,in the tension state can’t park handrail longtime on the escalator.

3.3.5 After install and debug,if don’t use for a while,must run escalator 10~20
minutes every week.

Unpublished Work Copyright © SIGMA Elevator Company

Potrebbero piacerti anche