Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
25
FIELD INDUSTRIAL
ENGINEERING
ARES Maintenance Manual Page : B - 1 / 7
Index
1.2.7 Affirm ES startup normally,after rotate one loop ,affirm step installation state.
1.2.8 After cover the Floor in sequence, affirm if there is difference in joint part
急停 启动
报警 停止 下行 上行
Key Swi t ch
St op But t on
Al ar m Swi t ch
Stop button
Up button
Down button
Tag
No permission,can’t enter machine room
Top machine
room Emergency
Bottom Switch
Controller MCCB machine room
Handle Joint Box
2. Disassemble steps
This work is in the bottom machine room.
2.1 Handle of MCCB is On, bottom E-Stop Button is Off.
Clamp
Bush
2.4 2.5