The following concerns mainly "hard" infrastructure and the specialized facilities used for "soft" infrastructure.
Infrastructure may be owned and managed by governments or by private companies, such as public utility or
railway companies. Generally, most roads, major ports and airports, water distribution systems and sewage
networks are publicly owned, whereas most energy and telecommunications networks are privately owned.
Publicly owned infrastructure may be paid for from taxes, tolls or metered user fees, whereas private
infrastructure is generally paid for by metered user fees. Major investment projects are generally financed by
the issuance of long-term bonds.
Note that government owned and operated infrastructure may be developed and operated in the private sector or
in public-private partnership in addition to in the public sector.
In the United States, public spending on infrastructure has varied between 2.3% and 3.6% of GDP since 1950.
[17]
In 2007, Senator Christopher Dodd of Connecticut and Senator Charles Hagel of Nebraska introduced the
National Infrastructure Bank Act of 2007. This bill would provide for a national fund to help pay for large
infrastructure projects in the United States.
The method of 'Infrastructure Asset Management' is based upon the definition of a Standard of Service (SoS)
that describes how an asset will perform in objective and measurable terms. The SoS includes the definition of a
minimum condition grade, which is established by considering the consequences of a failure of the
infrastructure asset.
The 2009 report card produced by the American Society of Civil Engineers [3] gives America's Infrastructure a
grade of "D".
[edit] Engineering
In terms of engineering tasks, the design and construction management process usually follows these steps:
• Preliminary Studies:
o Determine existing and future traffic loads, determine existing capacity, and
estimate the existing and future standards of service;
o Conduct a preliminary survey and obtain information from existing air photos,
maps, plans, etc.
o Identify possible conflicts with other assets or topographical features;
o Perform environmental impact studies:
Evaluate the impact on the human environment ( Noise pollution, odors,
electromagnetic interference, etc. ..);
Evaluate the impact on the natural environment (disturbance of natural
ecosystems);
Evaluate possible presence of contaminated soils;
o Given various time horizons, standards of service, environmental impacts and
conflicts with existing structures or terrain, propose various preliminary designs;
o Estimate the costs of the various designs, and make recommendations;
• Detailed Survey:
o Perform a detailed survey of the construction site;
o Obtain As Built drawings of existing infrastructure;
o Dig exploratory pits where required to survey underground infrastructure;
o Perform a geotechnical survey to determine the bearing capacity of soils and rock;
o Perform soil sampling and testing to estimate nature, degree and extent of soil
contamination;
• Detailed Engineering:
o Prepare detailed plans and technical specifications;
o Prepare a detailed bill of materials;
o Prepare a detailed cost estimate;
o Establish a general work schedule;
• Authorization:
o Obtain authorization from environmental and other regulatory agencies;
o Obtain authorization from any owners or operators of assets affected by the work;
o Inform emergency services, and prepare contingency plans in case of emergencies;
• Tendering:
o Prepare administrative clauses and other tendering documents;
o Organize and announce a Call for Tenders;
o Answer contractor questions and issue addenda during the tendering process;
o Receive and analyse tenders, and make a recommendation to the owner;
• Construction Supervision:
o Once the construction contract has been signed between the owner and the general
contractor, once all authorisations have been obtained, and once all pre-
construction submittals have been received from the general contractor, the
construction supervisor issues an Order to Begin Construction;
o Regularly schedule meetings and obtain contact information for the general
contractor (GC) and all interested parties;
o Obtain a detailed work schedule and list of subcontractors from the GC.
o Obtain detailed traffic diversion and emergency plans from the GC;
o Obtain proof of certification, insurance and bonds;
o Examine shop drawings submitted by the GC;
o Receive reports from the materials quality control lab;
o When required, review Change request s from the GC, and issue Construction
Directives and Change Orders;
o Follow work progress and authorize partial payments;
o When substantially completed, inspect the work and prepare a list of deficiencies;
o Supervise testing and commissioning;
o Verify that all operating and maintenance manuals, as well as warranties, are
complete;
o Prepare "As Built" drawings;
o Make a final inspection, issue a certificate of final completion and authorize the final
payment.