Geotechnical Engineering Class Tutorial Nr 2_2019/2   September 2019 

After a site investigation the water table was established at a depth of 3.6 m below the natural 
ground level. The saturated density of a clay layer, which extends from a depth of 6.2 m to 7.95 m 
below ground level, is 1875 kg/m3. The material on top of the clay to the surface has a bulk density 
of 1905 kg/m3 above the water table, and a saturated density of 2045 kg/m3 below the water table. 

It is planned to erect a building of which the total pressure exerted at the bottom of the 3 m deep 
foundation will be 1250 kPa (no shape factor need be used). Oedometer tests were conducted on 
the clays at this depth and are recorded in the table below. 

Pressure, kPa  50  100  200  400  800  1600 


Sample  21.495  21.312  21.128  20.944  20.760  20.589 
thickness, mm 
 

After the completion of the test, the pressure was removed and the sample was allowed to expand 
whilst kept saturated. After expansion, the sample thickness in the cell was recorded as 24.891 mm 
(ie‐ the swelling height), whilst the moisture content was 32.45 %. Assume the relative density to be 
2.76. 

(a) Calculate the expected total settlement of the clay layer using the most appropriate 
method suitable for the clay type. [SHOW ALL CALCULATIONS and GRAPHS. All void 
calculations to three (3) decimals. Use the graph on Annexure A.     
(b) Determine the OCR (follow the guidelines attached in the email (or your notes, pg 5.10a) 
for the clay using graph paper provided on Annexure B. SHOW ALL CALCULATIONS and 
GRAPHS. Hint: The overburden stress will be the pressure before construction. The formula 
is on the top of pg 5.10a.                
(c) Classify the site based on 50% differential settlement.  Use your notes as a guide or Google 
(give references)                 
(d) Provide at least three possible solutions for the foundation construction if the maximum 
differential settlement is fixed at 25 mm.             

INSTRUCTION FOR SUBMISSION 

UPLOAD ONTO BLACKBOARD BY WED 25TH SEPTEMBER 2019 

USE THE ADOBE (PDF) FORMAT 

NEATNESS 30%, ACCURACY 30%, CALCULATIONS 30%, SUMMARY OF RESULTS 10% 
Geotechnical Engineering Class Tutorial Nr 2_2019/2   September 2019 

ANNEXURE –A‐   
 

 
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
                                                                                                        
Voids vs Log P 

 
Geotechnical Engineering Class Tutorial Nr 2_2019/2   September 2019 

ANNEXURE ‐B‐ 

0,1 1 10
 

LOG P VS VOIDS 

Potrebbero piacerti anche