Sei sulla pagina 1di 2

Project:

Checked by
Details: Kerb Drainage Inlet Spacing

Crossfall road 5m
Spacing between each kerb drain 5m (center to center)
Catchment Area, A 25 m2
Time of Concentration,Tc 15 minutes
Storm Return Period 5 years
Rainfall Intensity, I 158 mm/h (Based on IDF Curves from Singapore Island)
Tc X I 0.0395 m
Surfcae Volume, Vw 0.9875 m3
QARI 0.001 m3/s

Kerb drain size:


Width,W 0.465 m
Length,L 0.64 m
Depth,d 0.7 m
Volume,Vs 0.208 m3
Qs 0.001 m3/s
Time taken to fill up the kerb 208 s
drain,ts

RCP Pipe
Pipe diameter 450 mm
Pipe area 0.159 mm2
Pipe perimeter 0.707 m
Pipe average velocity (Manning Equation)

Roughness coefficient,n 0.015


Surface slope,S 0.01
Hydraulic radius,R 0.225 m
Average velocity,v 3.675 m/s
Qo=Av 0.584 m3/s

Discharge volume,Vp 121 m3

Vp > Vw OK!

Potrebbero piacerti anche