DESCRIPCION DEL RECURSO UNIDAD CUADRILLA APORTE PRECIO PARCIAL I.U. METRADO CANTIDAD PRECIO TOTAL
UNITARIO UNITARIO TOTAL
MANO DE OBRA
Peón hh 1.00 3.2000 9.17 29.34 47 1,525.00 4880 9.17 44,749.60
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 2.00% 29.34 0.59 37 1,525.00 30.5 29.34 894.99
MANO DE OBRA
Operario hh 2 1.5238 15.18 23.13 47 1,525.00 2323.809524 15.18 35,275.43
Oficial hh 1 0.7619 11.24 8.56 47 1,525.00 1161.904762 11.24 13,059.81
Peón hh 5 3.8095 9.17 34.93 47 1,525.00 5809.52381 9.17 53,273.33
MATERIALES
Cemento portland tpo I bol 3.2500 21.50 69.88 21 1,525.00 4956.25 21.50 106,559.38
Piedra grande de río m3 0.5000 38.00 19.00 05 1,525.00 762.5 38.00 28,975.00
Hormigón m3 0.9100 35.00 31.85 38 1,525.00 1387.75 35.00 48,571.25
Agua m3 0.1200 0.50 0.06 30 1,525.00 183 0.50 91.50
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 3.00% 66.63 2.00 37 1,525.00 45.75 66.63 3,048.26
Mezcladora de 9 - 11 P³ hm 1 0.7619 14.50 11.05 48 1,525.00 1161.904762 14.50 16,847.62
MANO DE OBRA
Operario hh 1 0.8889 15.18 13.49 47 513.50 456.4444444 15.18 6,928.83
Oficial hh 2 1.7778 11.24 19.98 47 513.50 912.8888889 11.24 10,260.87
Peón hh 8 7.1111 9.17 65.21 47 513.50 3651.555556 9.17 33,484.76
MATERIALES
Cemento portland tpo I bol 3.7500 21.50 80.63 21 513.50 1925.625 21.50 41,400.94
Piedra grande de río m3 0.4500 38.00 17.10 05 513.50 231.075 38.00 8,780.85
Hormigón m3 0.9700 35.00 33.95 38 513.50 498.095 35.00 17,433.33
Agua m3 0.1800 0.50 0.09 30 513.50 92.43 0.50 46.22
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 5.00% 98.68 4.93 37 513.50 25.675 98.68 2,533.72
Mezcladora de 9 - 11 P³ hm 1 0.8889 14.50 12.89 48 513.50 456.4444444 14.50 6,618.44
MANO DE OBRA
Operario hh 1 0.6400 15.18 9.72 47 250.20 160.128 15.18 2,430.74
Oficial hh 2 1.2800 11.24 14.39 47 250.20 320.256 11.24 3,599.68
MATERIALES
Alambre negro Nº 8 kg 0.2600 5.00 1.30 02 250.20 65.052 5.00 325.26
Madera tornillo p2 5.8300 7.50 43.73 43 250.20 1458.666 7.50 10,940.00
Clavos de 4" kg 0.1500 5.00 0.75 02 250.20 37.53 5.00 187.65
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 5.00% 24.10 1.21 37 250.20 12.51 24.10 301.52
MANO DE OBRA
Operario hh 1 0.9412 15.18 14.29 47 95.50 89.88235294 15.18 1,364.41
Oficial hh 2 1.8824 11.24 21.16 47 95.50 179.7647059 11.24 2,020.56
Peón hh 8 7.5294 9.17 69.04 47 95.50 719.0588235 9.17 6,593.77
MATERIALES
Cemento portland tpo I bol 9.7500 21.50 209.63 21 95.50 931.125 21.50 20,019.19
Piedra Chancada 1/2" m3 0.5500 45.00 24.75 05 95.50 52.525 45.00 2,363.63
Arena m3 0.5300 35.00 18.55 04 95.50 50.615 35.00 1,771.53
Agua m3 0.1860 0.50 0.09 30 95.50 17.763 0.50 8.88
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 3.50% 104.49 3.66 37 95.50 3.3425 104.49 349.26
Mezcladora de 9 - 11 P³ hm 1 0.9412 14.50 13.65 48 95.50 89.88235294 14.50 1,303.29
Vibrador de Concreto de 1" he 0.5 0.4706 8.50 4.00 48 95.50 44.94117647 8.50 382.00
MANO DE OBRA
Operario hh 1 0.9412 15.18 14.29 47 551.50 519.0588235 15.18 7,879.31
Oficial hh 2 1.8824 11.24 21.16 47 551.50 1038.117647 11.24 11,668.44
MATERIALES
Alambre negro Nº 8 kg 0.3000 5.00 1.50 02 551.50 165.45 5.00 827.25
Madera tornillo p2 4.6900 7.50 35.18 43 551.50 2586.535 7.50 19,399.01
Clavos de 4" kg 0.3500 5.00 1.75 02 551.50 193.025 5.00 965.13
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 5.00% 35.44 1.77 37 551.50 27.575 35.44 977.39
MANO DE OBRA
Operario hh 2 0.0640 15.18 0.97 47 5,895.20 377.2928 15.18 5,727.30
Oficial hh 1 0.0320 11.24 0.36 47 5,895.20 188.6464 11.24 2,120.39
MATERIALES
Alambre negro Nº 8 kg 0.0600 5.00 0.30 02 5,895.20 353.712 5.00 1,768.56
Acero corrugado fy=4200kg/cm kg 1.0500 3.80 3.99 03 5,895.20 6189.96 3.80 23,521.85
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 5.00% 1.33 0.07 37 5,895.20 294.76 1.33 392.38
Cizalla hm 1 0.0320 5.50 0.18 37 5,895.20 188.6464 5.50 1,037.56
MANO DE OBRA
Operario hh 1 0.6400 15.18 9.72 47 2,000.00 1280 15.18 19,430.40
Peón hh 3 1.9200 9.17 17.61 47 2,000.00 3840 9.17 35,212.80
MATERIALES
Ladrillo KK arcilla 9x12x24 und 39.0000 1.25 48.75 17 2,000.00 78000 1.25 97,500.00
Arena gruesa m3 0.0300 35.00 1.05 04 2,000.00 60 35.00 2,100.00
Madera tornillo p2 1.4600 7.50 10.95 43 2,000.00 2920 7.50 21,900.00
Cemento portland tpo I bol 0.2800 21.50 6.02 21 2,000.00 560 21.50 12,040.00
EQUIPOS Y HERRAMIENTAS
Herramientas Manuales %Mo 3.50% 27.32 0.96 37 2,000.00 70 27.32 1,912.51