Sei sulla pagina 1di 1

2 3 4 5

2850 2850 1200 GENERAL


1 3 1. This drawing must be read in conjuction
with relevant engineer's and architectural
2T12-12(T1)
b-b a=T12-12(B1) b-b a=T12-12(B1)
drawing(s).
b=T12-12(T1) b=T12-12(T1) 2. The contractor shall check all dimensions
c=R8-2-250 c=R8-2-250 on site, any error, &/or ommisions shall be
R8-2-250 R8-2-250 R8-2-250 reported to the engineer before
work is commenced.
2T12-12(B1) a-a c a-a c 3.The latest ammendment or revision shall
superceed all other issues which shall be
1 3 BEAM 1 DETAIL
SCALE 1:25
(E) 1 - 1 (E) 3 - 3 destroyed

CONCRETE
1. Blinding under pad foundation to be 1:4:8 mix
2. All reinforced concrete to be grade 25 mix
giving a minimum crushing strength of
2 25N/mm2 of 28 days.
3. Cement shall be portland cement to comply
2
with BS 12
F1 G
4.Maximum aggregate size shall be 20mm unless
otherwise stated.
2850

1 2 2850 3

2T12-1(T1) REINFORCEMENT
b-b a=T12-1(B1) b-b a=T12-1(B1) b-b a=T12-1(B1)
1

b=T12-1(T1) b=T12-1(T1) b=T12-1(T1)


1. R indicate hot rolled mild steel to BS4449
c=R8-2-250 c=R8-2-250 c=R8-2-250 2. Y indicate cold rolled high tensile steel to BS4461
750

1
3.Fabric reinforcement shall be to BS4483.
R8-2-250
4. All reinforcement shall be presented to the
2T12-1(B1) a-a c a-a c a-a c engineer for inspection prior to concreting.
2100

1 2 BEAM 1 DETAIL 3
(1) 1 - 1 (1) 2 - 2 (1) 3 - 3 COVER
SCALE 1:25 Unless otherwise stated cover to main steel shall
be as follows:
1. 50mm to all steel below ground level
1570

2. 40mm to columns above ground level


3. 25mm to steel in beams.
4. 20mm to steel in slabs and staircase.
1280

WORKMANSHIP
1. All concrete work to be in accordance with BS 8110.
1320

2. All reinforced concrete to be mechanically vibrated.


3 4 5
3. All load bearing blockwork shall be in accordance
with CP 111.
2850 1200
1530

1 3
EXCAVATION
2T12-11(T1) 1. All excavations for foundation shall be
b-b a=T12-11(B1) b-b a=T12-11(B1) presented to the engineer for his approval
b=T12-11(T1) b=T12-11(T1)
prior to placing of blinding.
2100

c=R8-2-250 c=R8-2-250
2. Depth of foundation on all drawings are
R8-2-250 R8-2-250 provisionaland the engineer shall be consulted before
final depthis arrived at during construction.
2T12-11(B1) c c
750

a-a a-a

1 3 LEGEND
BEAM 1 DETAIL (F) 1 - 1 (F) 3 - 3 1. T1 Top first layer
SCALE 1:25
2. T2 Top second layer
2850

3. B1 Bottom first layer


4. B2 Bottom second layer

PROJECT
PROPOSED RESIDENTIAL
DEVELOPMENT ON PLOT NO.
1200 2850 2850 1200 3800
MWEA/TEBERE/A&B/612/KIRINYAGA
COUNTY
2Y16-01 CLIENT
MR. MICHAEL MBURU MWAURA
9Y12-09-150T1
FOUNDATION LAYOUT P.O BOX 436-10303
SCALE 1:75 WANGURU
2Y16-02
REV. DATE
2)
9Y12-07-150T1 +8T
20Y10-06-150(10B2+10T2) B2
0(22
200 1400 8 -15
0-0
Y1
2Y16-01 30

2850
DPC 9Y12-05-150T1
DPC
Reinforcement Mesh (A61)
Reinforcement Mesh (A61) 20Y12-04-150B1
150mm Concrete Slab
150mm Concrete Slab
DPM 1000 Gauge Polyethene 2Y16-02 9Y10-01-200B1
DPM 1000 Gauge Polyethene 30
Y1

Structural drawing
50mm Murram/Quarry dust blinding 0-0
50mm Murram/Quarry dust blinding 3-1
50 9Y12-02-150T1
(22
300mm Hardcore well B2
300mm Hardcore well +8
compacted T2
compacted )

BRC MESH
Y12-02-200 DESIGNED BY: JOB NO. 03-19

150
Y12-02-200
Y12-01-200
Y12-01-200
50mm concrete blinding
50mm concrete blinding (1:4:8mix)
DRAWN BY: A.W.G DRG. NO. 03-19
(1:4:8mix) STAIRCASE DETAILS
SCALE 1:50
EXTERNAL STRIP SECTION 2-2 CHECKED BY: DATE SEP 2019
INTERNAL STRIP SECTION 1-1
SCALE 1:25 SCALE 1:25

SCALE : AS INDICATED SHEET 02

Potrebbero piacerti anche