THAKKUR SCHOOL OF ARCHITECTURE AND PLANNING

AY: 2019-2020 3rd year sem V


Subject: Quantity estimation and specification
Topic: Measurement sheet
sr.no item description no. Length (m) Breadth(m) Height(m) Rate (₹)
1 a Earthwork in excavation in foundation

Columns 22 0.23 0.6 1.3


b In between
stair walls
entrance 2 2.93 0.15 2.8
ext 2 2 2.93 0.15 2.8
c ROOM
exterior wall 4 3.37 0.23 0.15
wall near toilet 2 2.93 0.15 0.15
TOILET
d duct side wall 2 5 0.23 0.15
next to room 2 5 0.15 0.15
common wall 1 3.23 0.15 0.15
e ext wall 2 4 0.23 0.15
Earthwork in filling
In plinth:
room 2 4 4 0.35
convertible room 2 7.5 3.75 0.15
2 a. common toilet 2 5 3.75 0.15
b. foundation 22 0.23 0.6
Column base
a. Steps 2 3.9 2
b. R..C. C . works
3 STAIR WALLS 2 2.93 0.23 3.05
ext 1 2 2.93 0.15 3.05
a ext 2 2 2 0.23 3.05
b landing side
4 c ROOM 4 3.37 0.23 3.05
d exterior wall 4 3.37 0.23 3.05
5 e wall near toilet
6 TOILET 2 5 0.23 3.05
a duct side wall 2 5 0.15 3.05
next to room
ext wall
excluding columns
b Doors 6 1.5 0.2
Windows in room 2 2 0.2
7 Stair window 2 2 0.2
c

8
9
10
11
12
13
14
15
16
Sign/ Stamp

Amount(₹) Explainatory notes