How to Phase a Plumbing Project again.

again. If you start setting toilets, you are much copper, steel, scrap metals are all affected by
Phase 1: Total General and Special better and faster on the last one than you were on world supply and demand.
Conditions the first. It is the same with rough-in. Your
Transfer your totals from the General and Special plumbers are much better on the 5th floor rough-
Conditions page to this page and extend. in than they were on the first. At least they should
Phase 2: Total Fixtures be better, your estimate can depend on it.
We usually combine Fixtures and Mechanical Phase 7: Waste & Vent Non-Typical Floors
Equipment. However, if the job is massive, you You will probably use this phase more than the
can separate. Separating the two on a big project one above. It is your waste and vent material and
helps to put together the schedule of values on labor for non-typical plumbing. Several years ago, we had 17 increases in copper
your billing paperwork. Here is what we consider Phase 8: Water Piping Typical Floors
in less than a year. If you had a project that
plumbing fixtures: toilets, lavatories, urinals, No explanation necessary. spanned better part of a year and you didn’t have
bidets, kitchen sinks, bathtubs, showers, mop Phase 9: Water Piping non-Typical Floors escalation in the bid, you would lose more money
basins or slop sinks, drinking fountains or water No explanation necessary. every time the price went up. Please do not for
coolers, hand sinks, and emergency eye washes. Explaining the Rest of the Plumbing Recap one second think that a general contractor or
Basically, these are all plumbing fixtures and their Sheet Owner will reimburse you for the increases. We
related faucets, P-traps, supplies, strainers, etc. After Phase 9 you’ll notice “Add 3% to the total have never seen it happen. Therefore,be in close
Phase 3: Mechanical Equipment of phases 5, 6, 7, 8, 9." After a ton of analysis contact with your purchasing agent or material
For the sake of this piece, mechanical equipment spanning 40 years or so, we have found that the supplier to make sure you have at least an idea of
consists of floor drains, roof drains, floor majority of the takeoff mistakes (between the where the market is going.
cleanouts, wall cleanouts, floor sinks, RPZs, sump estimator and the man in the field) happen in Review Adjustment is another line item to add
pumps, ejector pumps, house pumps, water these phases for an average of 3%. Therefore,we overlooked things during an estimate review.
heaters, boilers, re-circulating pumps, mixing add a line item to cover the over-site. This is also When we carried out very large projects, the
valves, grease separators, triple oil basins, fixture an easy number to shave if you’re trying to cut estimate was always reviewed by a senior
carriers, flashings, etc.. costs. estimator. If a senior estimator did the estimate, it
Phase 4: Demolition The next line item that needs explaining is was reviewed by the president of the company. In
This encompasses only plumbing demolition. “Deduct Buying.” I do not like this line item, but the end, the president and owner reviewed each
Phase 5: Underground Piping the reality of the construction climate is that it is other’s estimates.
No explanation necessary. valid. This is the amount of money you can buy Overhead and Profit are terms every estimator
Phase 6: Rough-In Typical Floors out of your material vendors. This should be a should be familiar with. The owner should instruct
This is your waste and vent material in a typical vehicle for you to make more profit. its estimators on what the overhead should be and
floor situation. A typical floor is a floor in a Unfortunately, it is now a way to shave your the amount of profit that should be added.
multiple floor building where the plumbing is the plumbing estimate and win a job. The last line item that we believe needs explaining
same on each floor. It is much easier to put an Pre-markup adjustments or “R” (Revision) is, “Permits, Bonds, and Fees.” This is a spot for
estimate together if you have typical floors. On sheets is just a line item to insert in any over-sites you to add any additional costs for permits and
the material side, you take off one floor and you may catch while putting the number together. such. Most times on large projects, the sub-
multiply it by the number of typical floors in the Another very important line item is “Escalation.” contractors are not responsible for these costs.
building. If you are new to this game, you may not even However, if it is a private project where you are
think to escalate the pricing if the job spans intimately involved in the permit process, you my
With regards to labor, you do have to consider material and/ or labor increases. In our business, need to be responsible for the above.
what we call the “experience factor”. The we are dealing with materials that have a direct Our Philosophy on Estimating Plumbing
“experience factor” is the experience your labor correlation to the commodities markets, resins, Labor
force gets by doing something over and over
You will see that our labor unit is always broken contractor furnishes dumpsters. It doesn’t exclude temporary protection, let the company
down into Man Days. There is a logical reason for always happen, but we try to exclude. responsible for the entire job worry about
that. It is much easier to think about how to labor protection.
a phase in man days than if you figure it in hours.  Off-site spoil removal - We usually say that  X-raying of floors prior sawcutting or hole
There aren’t many jobs you’ll lose because you we will take spoils to an on-site barrow pile for coring.
had a half hour or one hour too many in your final removal by others.  Responsibility for damage (while sawcutting
estimate. or hole coring) to concrete embedded conduits.
When it comes to labor, you might lose the job  Furnishing of any kitchen equipment - This  Furnishing of any backflow prevention
because you had too many man days. Take this is not usually something a plumber handles, but devices not clearly delineated on the plumbing
into consideration when you are analyzing the we will make the final connections. documents.
estimate for possible mistakes or if you’re trying  Removal or replacement of walls or ceiling
to shave the number. Labor is the area we find  Furnishing of any temporary work - This that may be necessary for us to install our
difficult to transfer to a computer estimating encompasses temporary toilets, temporary work - Again, we will do some of this work if
program. Most estimating software assign labor connections, etc. We exclude them if none are it’s insisted upon. Nonetheless, the GC usually
factors to each fitting and piece of pipe, every asked for. This way, the customer doesn’t takes care of removing spline ceilings and
hanger, and plumbing fixture. attempt to make you do something not called opening walls.
There needs to be a ton of oversight on your for on the bid documents.  Removal or replacement of deteriorated
estimates to make sure your labor matches your Correction of existing pluming code piping we may encounter while performing our
estimating software. We have a good friend that violations we may encounter while work.
moved his company to computer estimating and it performing our work - This is relevant when  Rodding of any existing waste or storm
took him over a year to feel confident the software doing plumbing repair or rehab work. While piping.
was laboring the way he wanted it to. performing, you may encounter plumbing that  Shut down, drain down, and subsequent
Common Plumbing Estimate Exclusions is a code violation that is not part of your scope refilling of domestic water piping. This
Over the years, we’ve had the opportunity to read of work. This is just letting everyone know you applies mainly to rehab work. Moreover, this is
many plumbing contractor bid proposals. It always aren’t repairing things not called for to be very important when it comes to hospitals.
baffles us how little clarification is included in the repaired. Final Word
proposals. Therefore, we wanted to include a list Obviously, this is to be used as a learning tool to
of common exclusions and how they are written to  Coordinated shop drawings prior to the visualize how plumbing estimate works. You
limit your exposure during and after the bid installation of our piping. We will shouldn't take this guide as the Bible and follow it
process is complete. Obviously, you don’t need coordinate on the job - Coordinated shop line by line. We like to think of it as a framework
every exclusion on every job. Some are very drawings are being required more and more. to be adding to or to be pared down as necessary.
specific so they don’t even fit into some proposals. However, on small projects, they are an We hope you can take away something useful
As a result, use this list as another check list to expense that isn’t necessary. Tradesmen are from the piece. Thanks for reading and please post
make sure you’ve got things covered. more efficient at coordinating while installing. any comments or questions you have regarding
 Permits, bonds or fees - We will include if any of the concepts written above.
necessary. However, if none are clarified, we  Furnishing of any appliances - There have Image source: 1
cover ourselves by excluding them. been times where we provide dishwashers or
 Furnishing of a Performance and Payment ice makers, but not very often. This is another
bond - Please see the above. Keep in mind, if exclusion to limit exposure.
you have to have a performance and payment
bond, include the added costs.  Protection of Owner’s or tenant’s fixtures,
 Furnishing of dumpsters for the removal of furniture, equipment,(FF&E) i.e.
debris - we prefer it when the general computers, carpeting, etc. - We always