INSPECTION TEST RECORD (ITR) - A

STRUCTURE PAINTING ST02-A


Project No.
Project Title
Facilities
INFORMATION
Area No Ref Drawing
System Inspection Date
Sub System Location

INSPECTION / TEST OK N/A P/L No.


1 All surfaces clean and dry prior to application
2 Sharp edges-removed prior to application
3 All masking completed and safety 3. measures taken
Visual control performed during application, record below ambient and humidity
4
during
5 Spot painting performed
6 Piping supports completed
7 Penetrations correctly coated
8 Bulkhead joints correctly coated
9 Structural interfaces correctly coated
10 Dry film thickness checked correct. Record details
11 Record any defective area(s) on punch list
Details of paint type as below:
Date of application :
Curing time : (Hrs)
12
Percentage of relative humidity: (%)
Start of application : (Hrs)
Completion of application : (Hrs)
13 Attach drawings, highlighted with areas checked
COMMENT(S) AND ADDITIONAL INFORMATION

COMPLETED BY VERIFIED BY ACCEPTED BY


Designation
Company
Name
Signature
Date