Project No. Project Title Facilities INFORMATION Area No Ref Drawing System Inspection Date Sub System Location
INSPECTION / TEST OK N/A P/L No.
1 Installation of girder & nodes frame are completed as per IFC drawing 2 Primary structural frame complete as per IFC drawing 3 Secondary structure frame completed as per IFC drawing 4 Blast wall & firewall completed as per IFC drawing 5 Deck structure completed as per IFC drawing 6 Install deck coming as per IFC drawing 7 All stiffeners installed as per drawing 8 Service platforms & walkways pipe rack installed correctly 9 Deck drains installed 10 Deck & wall penetrations installed as per IFC drawing 11 Grating complete and installed correctly 12 Monorails installed as per IFC drawing 13 Pad eyes/lifting lugs installed as per IFC drawing 14 All of rotating equipment sub bases are completed as per IFC drawing 15 Ladders installed to drawings 16 Stairs installed to drawings 17 Handrails installed and secured 18 All hatches complete to drawings 19 Flare boom completed install as per IFC drawing 20 Access platform complete as per IFC drawing 21 NDT completed COMMENT(S) AND ADDITIONAL INFORMATION