1659.5
S-CURVE
Planning Actual
100
90
80
70
60
50
PROGRESS
40
30
20
10
0
9 9 9 9
-1 -1 -1 -1
ay ay ay ay
-M M -M -M
2 4 2 5- 2 6 2 7
DATE
24-May-19
25-May-19
26-May-19
27-May-19
28-May-19
29-May-19
24-May-19
25-May-19
26-May-19
27-May-19
28-May-19
Finish Weight Progress
100.00 30.44 1.05 49.44 42.99 6.45 0.72 29.72 0.00 0.00
9
-1
ay
-M
2 7
29-May-19
Task Name Duration Start
SIL GEOTHERMAL POWER PLANT ANNUAL INSPECTION 2019 71 hrs 24 May 19:00
Main STG 55,5 hrs 24 May 23:59
Record data vibration & other on DCS room befor shutdown 1 hr 24 May 23:59
Shutdown STG 3 hrs 24 May 23:59
Cooling down 3 hrs 24 May 23:59
Turning gear 2 hrs 25 May 2:59
Disamantle 36,02 hrs 24 May 23:59
Remove heat insulation 2 hrs 24 May 23:59
Remove turbine man hole (L & R) 2 hrs 25 May 4:59
Perform visual and boroscope inspection of last stage blades 4 hrs 26 May 8:00
Remove air duct 1 hr 25 May 4:59
Remove exiter cover 1 hr 25 May 5:59
Remove PMG Cover 1 hr 25 May 6:59
Remove Generator end cover 3 hrs 25 May 7:59
Electrical Scope of Works on the STG 38,5 hrs 25 May 10:59
Generator 32,5 hrs 25 May 10:59
Perform generator cleaning and inspection (no rotor removal). 4 hrs 25 May 10:59
Inspect/test diodes and diode bridges for cleanliness and condition 3 hrs 25 May 14:59
Visual and boroscope inspection of the insulation, fans, wedges fo 3 hrs 25 May 17:59
Perform stator winding insulation resistance test 3 hrs 26 May 9:29
Perform rotor winding insulation resistance test 3 hrs 26 May 13:29
Perform exciter field stator winding insulation test 3 hrs 26 May 16:29
STG NGR/Surge Arresters 3 hrs 25 May 10:59
Visually inspect, clean dust or dirt which might have accumulate 2 hrs 25 May 10:59
Visually inspect for crack, or leakage on insulators or bushings of t 2 hrs 25 May 10:59
Check continuity of resistive element of neutral grounding resistors 2 hrs 25 May 10:59
Record findings and observation and mention in the servicing report 2 hrs 25 May 10:59
Re-assembly Generator 7,48 hrs 26 May 18:00
Install PMG & Cover end Cover 6 hrs 26 May 19:29
Install Exiter 7,48 hrs 26 May 18:00
Install Air Duct 6 hrs 26 May 19:29
Turbine & Generator Re-assembly 24,02 hrs 25 May 15:59
Close man hole after inspection 2 hrs 26 May 12:00
Install heat insulation 2 hrs 26 May 14:00
Witness by SIL Electrical Team 2 hrs 25 May 15:59
Pre Start Up 39,5 hrs 25 May 15:59
Turbine & Generator Oil Flushing 0 hrs 27 May 1:29
Turbine & Generator Turning Gear 2 hrs 27 May 1:29
Turbine & Generator Walk Down 2 hrs 25 May 15:59
Turbine & Generator Warming Up 4 hrs 27 May 1:29
Turbine & generator Start Up 2 hrs 27 May 5:29
Main Oil Tank 4 hrs 25 May 4:59
Inspection and servicing of vapor extractor 4 hrs 25 May 4:59
Oil Mist Separator 3 hrs 25 May 8:59
Replace Cartridge 2 hrs 25 May 8:59
Replace gasket 1 hr 25 May 10:59
Lube Oil Conditioner 6 hrs 25 May 11:59
Check deposit inside the coaleacer and record the quantity 3 hrs 25 May 11:59
Check the coaleacer cartridge about clogging 2 hrs 25 May 14:59
Check oil leakage from the conditioner 1 hr 25 May 16:59
MCV/CV/CV-LLO 36 hrs 25 May 17:59
Inspection of the hydraulic actuator of the main and control valves. 4 hrs 25 May 17:59
Inspection and cleaning of control oil line. 4 hrs 25 May 21:59
Inspection and cleaning of the servo valve mechanism of the control v 4 hrs 26 May 1:59
Replace of gland packing. 24 hrs 26 May 5:59
Main Strainer Cleaning and Inspection (L & R) 48 hrs 25 May 2:59
Remove heat insulation strainer (L & R) 3 hrs 25 May 2:59
Unbolting Strainer (L & R) 4 hrs 25 May 5:59
Remove strainer (L & R) 4 hrs 25 May 9:59
Cleaning Strainer (L & R) 24 hrs 25 May 13:59
Joint Inspection strainer (L & R) 1 hr 26 May 13:59
Install Strainer (L & R) & Replace Gasket 6 hrs 26 May 14:59
Bolting Strainer (L & R) 4 hrs 26 May 20:59
Install Heat insulation strainer ( L & R) 2 hrs 27 May 0:59
STG Drain Pot 3 hrs 25 May 8:00
Remove cover bolts 0,5 hrs 25 May 8:00
Cleaning drain pot 2 hrs 25 May 8:30
Reinstall drain pot 0,5 hrs 25 May 10:30
Steam Purifier 27 hrs 25 May 8:00
Install skillet 0 hrs 25 May 8:00
Remove man hole 1 hr 25 May 8:00
Blowing & Gas Test 12 hrs 25 May 9:00
Install scaffolding inside vessel 4 hrs 25 May 21:00
Steam Purifier cleaning 6 hrs 26 May 1:00
Uninstall scaffolding 2 hrs 26 May 7:00
Joint Inspection 1 hr 26 May 7:00
Install Man Hole & Replace Gasket 1,5 hrs 26 May 8:00
Tightening Bolts Man Hole 1,5 hrs 26 May 9:30
House Keeping 10 hrs 26 May 8:00
STG, Auxiliaries, BOP 10 hrs 26 May 8:00
OEC MECHANICAL CLEANING & INSPECTION 70 hrs 24 May 20:00
OEC-06 36 hrs 25 May 4:00
Shutdown & Cooling down 0 hrs 25 May 4:00
Drain Vaporizer & Preheaters 4 hrs 25 May 4:00
Remove Heat Insulation 0 hrs 25 May 8:00
Unbolting Vaporizer OEC 06 4 hrs 25 May 8:00
Unbolting Preheater OEC 06 4 hrs 25 May 12:00
Hydro Blast Water Jet Cleaning Vaporizer 06 16 hrs 25 May 16:00
Hydro Blast Water Jet Cleaning Preheater 06 16 hrs 25 May 16:00
Joint Inspection Vaporizer OEC 06 1 hr 26 May 8:00
Joint Inspection Preheat OEC 06 1 hr 26 May 8:00
Install Gasket (GORTEX) Vaporizer 06 1 hr 26 May 8:00
Install Gasket (GORTEX) Preheat 06 1 hr 26 May 8:00
Install Cover & Bolting Vaporizer OEC 06 4 hrs 26 May 12:00
Install Cover & Bolting Preheat OEC 06 4 hrs 26 May 12:00
Lube Oil Seal Replacement OEC-06 28 hrs 25 May 8:00
Drain Lube Oil tank 2 hrs 25 May 8:00
Clean Exterior & Interion tank 4 hrs 25 May 8:00
Refill new oil using portable filtration machine. Filtration machine is 4 hrs 25 May 11:00
Replace all required filters 5 hrs 25 May 16:00
Run the lube oil and seal oil system and check for leaks. 1 hr 26 May 9:00
OEC 06 Generator H2S Filter Cleaning. 2 hrs 26 May 10:00
Remove bolts stariner feed pump 4 Ea 2 hrs 25 May 8:00
Cleaning Strainer Feed Pump 4 Ea 2 hrs 25 May 8:00
Reinstall strainer feed pump 2 hrs 25 May 10:00
OEC-05 59 hrs 24 May 20:00
Shutdown & Cooling down 0 hrs 25 May 4:00
Drain Vaporizer & Preheaters 4 hrs 25 May 4:00
Remove Heat Insulation 0 hrs 24 May 20:00
Unbolting Vaporizer OEC 05 4 hrs 25 May 16:00
Unbolting Preheater OEC 05 4 hrs 25 May 20:00
Hydro Blast Water Jet Cleaning Vaporizer 05 16 hrs 26 May 9:00
Hydro Blast Water Jet Cleaning Preheater 05 16 hrs 26 May 9:00
Joint Inspection Vaporizer OEC 05 1 hr 27 May 1:00
Joint Inspection Preheat OEC 05 1 hr 26 May 9:00
Install Gasket (GORTEX) Vaporizer 05 1 hr 27 May 2:00
Install Gasket (GORTEX) Vaporizer 05 1 hr 27 May 2:00
Install Cover & Bolting Vaporizer OEC 05 4 hrs 27 May 3:00
Install Cover & Bolting Preheat OEC 05 4 hrs 27 May 3:00
Lube Oil Seal Replacement OEC-05 30 hrs 25 May 8:00
Drain Lube Oil tank 2 hrs 25 May 8:00
Clean Exterior & Interion tank 4 hrs 25 May 10:00
Refill new oil using portable filtration machine. Filtration machine is 4 hrs 25 May 15:00
Replace all required filters 6 hrs 25 May 19:00
Run the lube oil and seal oil system and check for leaks. 1 hr 26 May 10:00
OEC 05 Generator H2S Filter Cleaning. 3 hrs 26 May 11:00
Remove bolts stariner feed pump 4 Ea 2 hrs 25 May 10:00
Cleaning Strainer Feed Pump 4 Ea 2 hrs 25 May 13:00
Reinstall Strainer feed pump 2 hrs 25 May 15:00
OEC-34 32,5 hrs 25 May 8:00
Lube Oil Seal Replacement OEC-34 27,5 hrs 25 May 8:00
Drain Lube Oil tank 2 hrs 25 May 8:00
Clean Exterior & Interion tank 4 hrs 25 May 10:00
Refill new oil using portable filtration machine. Filtration machine is 4 hrs 25 May 14:00
Replace all required filters 4 hrs 25 May 18:00
Run the lube oil and seal oil system and check for leaks. 1 hr 26 May 10:30
Generator Air Cooler Filter Cleaning OEC 34 10 hrs 25 May 8:00
Remove bolts stariner feed pump 2 Ea 2 hrs 26 May 11:30
Cleaning Strainer Feed Pump 2 Ea 2 hrs 26 May 14:30
Alignment OEC-34 (CCW) 12 hrs 25 May 8:00
Final Alignment 12 hrs 25 May 8:00
OEC-33 52 hrs 25 May 5:00
Lube Oil Seal Replacement OEC-33 26 hrs 25 May 8:00
Drain Lube Oil tank 2 hrs 25 May 8:00
Clean Exterior & Interion tank 4 hrs 25 May 10:00
Refill new oil using portable filtration machine. Filtration machine is 4 hrs 25 May 14:00
Replace all required filters 5 hrs 25 May 18:00
Run the lube oil and seal oil system and check for leaks. 1 hr 26 May 9:00
Generator Air Cooler Filter Cleaning OEC 33 10 hrs 25 May 18:00
Remove bolts stariner feed pump 2 Ea 2 hrs 26 May 16:30
Cleaning Strainer Feed Pump 2 Ea 3 hrs 26 May 18:30
Replace Make Seal Feed Pump OEC-34 - CW 32,5 hrs 25 May 5:00
Disconnect Motor Power (Coord to SIL for remove heater power) 0,5 hrs 25 May 5:00
Riding Alignment 1 hr 25 May 8:00
Remove Motor Pump 1 hr 25 May 9:00
Disassembly 2 hrs 25 May 10:00
Repalce make seal new one 2 hrs 25 May 13:00
Reassembly 2 hrs 25 May 15:00
Install Motor pump 2 hrs 25 May 17:00
Alignment motor to pump 4 hrs 25 May 19:00
Reconnect power cable (coordinasi with SIL to remove heater) 1 hr 26 May 11:30
Replace Make Seal Feed Pump OEC-34 - CCW 34,5 hrs 25 May 5:00
Disconnect Motor Power (Coord to SIL for remove heater power) 0,5 hrs 25 May 5:00
Riding Alignment 1 hr 25 May 8:00
Remove Motor Pump 1 hr 25 May 10:00
Disassembly 2 hrs 25 May 11:00
Repalce make seal new one 2 hrs 25 May 14:00
Reassembly 2 hrs 25 May 16:00
Install Motor pump 2 hrs 25 May 19:00
Alignment motor to pump 4 hrs 26 May 9:30
Reconnect power cable (coordinasi with SIL to remove heater) 1 hr 26 May 14:30
OEC-31 55,02 hrs 25 May 6:59
Lube Oil Seal Replacement OEC-31 31,02 hrs 25 May 6:59
Drain Lube Oil tank 2 hrs 25 May 6:59
Clean Exterior & Interion tank 4 hrs 25 May 8:59
Refill new oil using portable filtration machine. Filtration machine is 5 hrs 25 May 11:59
Replace all required filters 4 hrs 25 May 16:59
Run the lube oil and seal oil system and check for leaks. 1 hr 25 May 20:59
Generator Air Cooler Filter Cleaning OEC 31 10 hrs 26 May 4:00
Remove bolts stariner feed pump 2 Ea 2 hrs 27 May 9:00
Cleaning Strainer Feed Pump 2 Ea 3 hrs 27 May 11:00
OEC-32 44,02 hrs 25 May 21:59
Lube Oil Seal Replacement OEC-32 26,02 hrs 25 May 21:59
Drain Lube Oil tank 2 hrs 25 May 21:59
Clean Exterior & Interion tank 4 hrs 25 May 23:59
Refill new oil using portable filtration machine. Filtration machine is 8 hrs 26 May 2:59
Replace all required filters 4 hrs 26 May 12:00
Run the lube oil and seal oil system and check for leaks. 1 hr 26 May 16:00
Generator Air Cooler Filter Cleaning OEC 32 10 hrs 26 May 14:00
Remove bolts stariner feed pump 2 Ea 2 hrs 27 May 14:00
Cleaning Strainer Feed Pump 2 Ea 2 hrs 27 May 16:00
OEC ELECTRICAL TEST & INSPECTION 35,5 hrs 25 May 8:00
Test of Generator OEC-06 8 hrs 25 May 8:00
Taking of insulation resistance of stator, exciter 1 hr 25 May 8:00
Dismantle cover 1 hr 25 May 9:00
Inspection and testing of diodes 1,5 hrs 25 May 10:00
Boroscopic Inspection. 1 hr 25 May 11:30
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 25 May 13:30
Inspection, servicing and testing of synchronizing breakers 1 hr 25 May 15:00
Test of Generator OEC-05 8 hrs 25 May 8:00
Taking of insulation resistance of stator, exciter 1 hr 25 May 8:00
Dismantle cover 1 hr 25 May 9:00
Inspection and testing of diodes 1,5 hrs 25 May 10:00
Boroscopic Inspection. 1 hr 25 May 11:30
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 25 May 13:30
Inspection, servicing and testing of synchronizing breakers 1 hr 25 May 15:00
Test of Generator OEC 34 19,5 hrs 25 May 16:00
Taking of insulation resistance of stator, exciter 1 hr 25 May 16:00
Dismantle cover 1 hr 25 May 17:00
Inspection and testing of diodes 1,5 hrs 25 May 18:00
Boroscopic Inspection. 1 hr 26 May 8:00
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 26 May 9:00
Inspection, servicing and testing of synchronizing breakers 1 hr 26 May 10:30
Test of Generator OEC 33 19,5 hrs 25 May 16:00
Taking of insulation resistance of stator, exciter 1 hr 25 May 16:00
Dismantle cover 1 hr 25 May 17:00
Inspection and testing of diodes 1,5 hrs 25 May 18:00
Boroscopic Inspection. 1 hr 26 May 8:00
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 26 May 9:00
Inspection, servicing and testing of synchronizing breakers 1 hr 26 May 10:30
Test of Generator OEC 32 8 hrs 26 May 11:30
Taking of insulation resistance of stator, exciter 1 hr 26 May 11:30
Dismantle cover 1 hr 26 May 13:30
Inspection and testing of diodes 1,5 hrs 26 May 14:30
Boroscopic Inspection. 1 hr 26 May 16:00
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 26 May 17:00
Inspection, servicing and testing of synchronizing breakers 1 hr 26 May 18:30
Test of Generator OEC 31 8 hrs 26 May 11:30
Taking of insulation resistance of stator, exciter 1 hr 26 May 11:30
Dismantle cover 1 hr 26 May 13:30
Inspection and testing of diodes 1,5 hrs 26 May 14:30
Boroscopic Inspection. 1 hr 26 May 16:00
Rotor DC winding resistance and insulation resistance check. 1,5 hrs 26 May 17:00
Inspection, servicing and testing of synchronizing breakers 1 hr 26 May 18:30
OEC GENERATOR ELECTRICAL TEST & INSPECTION 40 hrs 25 May 8:00
Inspection, cleaning and testing of incoming breakers at OEC pow 34,5 hrs 25 May 8:00
OEC-06 - Inspection, cleaning and testing of incoming breakers at O 5 hrs 25 May 8:00
OEC -05 - Inspection, cleaning and testing of incoming breakers at 5 hrs 25 May 14:00
OEC - 33 - Inspection, cleaning and testing of incoming breakers at 5 hrs 25 May 14:00
OEC - 34 - Inspection, cleaning and testing of incoming breakers at 5 hrs 25 May 19:00
OEC - 32 - Inspection, cleaning and testing of incoming breakers at 5 hrs 25 May 19:00
OEC - 31 - Inspection, cleaning and testing of incoming breakers at 5 hrs 26 May 13:30
Inspection and testing of all Auxiliary Transformer (08 EA). 40 hrs 25 May 8:00
AT-05 Inspection and testing of all auxiliary transformer 2 MVA - OEC 0 10 hrs 25 May 8:00
AT-06 Inspection and testing of all auxiliary transformer 2 MVA - OEC 0 10 hrs 25 May 18:00
AT-07 Inspection and testing of all auxiliary transformer 2 MVA - OEC 0 10 hrs 26 May 4:00
AT-08 Inspection and testing of all auxiliary transformer 2 MVA - OEC 0 10 hrs 26 May 14:00
AT-01 Inspection and testing of all auxiliary transformer 1,5 MVA - OEC 10 hrs 25 May 8:00
AT-02 Inspection and testing of all auxiliary transformer 1,5 MVA - OEC 10 hrs 25 May 18:00
AT-03 Inspection and testing of all auxiliary transformer 1,5 MVA - OEC 10 hrs 26 May 4:00
AT-04 Inspection and testing of all auxiliary transformer 1,5 MVA - OEC 10 hrs 26 May 14:00
BOP ELECTRICAL 36 hrs 25 May 8:00
Main Step-Up Transformers (03 EA) 34,5 hrs 25 May 8:00
STG Step Up TX-01 - Inspection and testing of Main Step-Up Transform 20 hrs 25 May 8:00
ST-02 - Inspection and testing of Main Step-Up Transformer - 35 MVA ( 20 hrs 25 May 8:00
ST-03 - Inspection and testing of Main Step-Up Transformer - 35 MVA ( 20 hrs 25 May 8:00
Auxiliary Transformers (02 EA) 34,5 hrs 25 May 8:00
AT-11 - Inspection and testing of all auxiliary transformer 2,5 MVA - W 20 hrs 25 May 8:00
AT-09 - Inspection and testing of all auxiliary transformer 2,5 MVA - B 20 hrs 25 May 8:00
AT-10 - Inspection and testing of all auxiliary transformer 2,5 MVA - B 20 hrs 25 May 8:00
Inspection, cleaning, servicing and testing of 11KV vacuum breakers (2 34,5 hrs 25 May 8:00
Panel - MV-01 20 hrs 25 May 8:00
Panel - MV-02 20 hrs 25 May 8:00
Inspection, testing and calibration of protective relays for Step-up 36 hrs 25 May 8:00
Panel - HV 36 hrs 25 May 8:00
Panel - MV 36 hrs 25 May 8:00
Panel - LV 36 hrs 25 May 8:00
Panel - Transformer 36 hrs 25 May 8:00
Panel - STG 36 hrs 25 May 8:00
150KV Switchyard Inspection (06 EA SF6, 04 EA ES & 12 EA DS) 34,5 hrs 25 May 8:00
150kV Switchyard - SF6 Breaker inspection & Maintenance 20 hrs 25 May 8:00
150kV Switchyard - Disconnect Switch inspection & maintenance 20 hrs 25 May 8:00
150kV Switchyard - Disconnect Switch with Earthing inspection & ma 20 hrs 25 May 8:00
Steam Field 32 hrs 25 May 8:00
Electrical Scope of Works : 32 hrs 25 May 8:00
Inspection, servicing and testing of the grounding systems for Wellpad 32 hrs 25 May 8:00
INSTRUMENTATION 21 hrs 25 May 8:00
HP STM MUFFLER (MU-3902B) INL PV (PIC SIL - AR) 11 hrs 25 May 8:00
RE-INJECTION SYSTEM PIC SIL - (PIC SIL - AR) 11 hrs 26 May 8:30
STEAM & COOLING WATER (PIC SIL - AR) 11 hrs 25 May 19:00
STG LUBE OIL & OIL CONTROL (PIC SIL - AR) 11 hrs 26 May 8:30
BRINE OEC (PIC SIL - AR) 20 hrs 25 May 8:00
MUFFLERS SYSTEM (PIC SIL - KA) 20 hrs 25 May 8:00
BOTTOMING OEC (PIC SIL - KA) 20 hrs 25 May 8:00
RE-INJECTION SYSTEM (PIC SIL - KA) 20 hrs 25 May 8:00
GATHERING SYSTEM (PIC SIL - KA) 10 hrs 25 May 8:00
PLC Calibration (PIC SIL - KA) 20 hrs 25 May 8:00
STEAM PURIFIER 20 hrs 25 May 8:00
BOTTOMING OEC 20 hrs 25 May 8:00
STEAM SCRUBBING SYSTEM 20 hrs 25 May 8:00
BOP 40 hrs 25 May 8:00
Acid Mixing System 16 hrs 26 May 8:00
Removal of static mixer 4 hrs 26 May 8:00
Inspection, sampling and cleaning. Repair damaged portion if found. 4 hrs 26 May 12:00
Inspection and cleaning of acid dosing line. 4 hrs 26 May 16:00
Reinstall Acid Mixing 4 hrs 26 May 20:00
Steam Scrubbing System Orifice & Pipeline Inspection 32 hrs 25 May 8:00
Removal of pipe spools, 8 hrs 25 May 8:00
Inspection and cleaning of orifices 10 hrs 25 May 16:00
Removal of scales from spools 10 hrs 25 May 16:00
Replacement of gaskets 2 hrs 26 May 2:00
Reinstallation of orifices and pipe spools. 12 hrs 26 May 4:00
Reinjection line PV-5706C Sizes 12 inch ( Valve stuck 31,5 hrs 25 May 8:00
Open the valve and inspection if any minor damage can be repair 3 hrs 25 May 8:00
Cleaning the valve seat and disc 5 hrs 25 May 11:00
Dye penetrant test on both disc and valve seat 2 hrs 25 May 17:00
Contact check between valve seat and disc with prussian blue 2 hrs 25 May 19:00
Replace Gaskets 2 hrs 26 May 9:30
Re-assemble and install 3 hrs 26 May 11:30
STEAM FIELD / WELL PAD 71 hrs 24 May 19:00
Brine Accumulator - B 49,5 hrs 24 May 19:00
Remove heat insulation man hole 0,5 hrs 24 May 19:00
Remove man hole 2 hrs 25 May 8:00
Blowing & Gas Test 6 hrs 25 May 10:00
Inspection and Cleaning of Brine Accumulator Vessels - B 12 hrs 25 May 17:00
Measurement of wall thickness at 12 points and conduct NDT of the we 0 hrs 25 May 17:00
Joint Inspection 2 hrs 26 May 18:30
Replacement of manhole gaskets & Close Man Hole 2 hrs 26 May 17:30
Separator Vessel B 49,5 hrs 24 May 19:00
Remove heat insulation man hole 0 hrs 24 May 19:00
Remove man hole 2 hrs 25 May 8:00
Blowing & Gas Test 6 hrs 25 May 10:00
Inspection and Cleaning of Brine Accumulator Vessels - B 12 hrs 25 May 17:00
Measurement of wall thickness at 12 points and conduct NDT of the we 0 hrs 25 May 17:00
Joint Inspection 2 hrs 26 May 18:30
Replacement of manhole gaskets & Close Man Hole 2 hrs 26 May 17:30
Brine Accumulator - A 49 hrs 25 May 8:00
Remove heat insulation man hole 1 hr 25 May 8:00
Remove man hole 2 hrs 25 May 10:00
Blowing & Gas Test 4 hrs 25 May 13:00
Inspection and Cleaning of Brine Accumulator Vessels - A 12 hrs 25 May 17:00
Measurement of wall thickness at 12 points and conduct NDT of the we 0 hrs 25 May 17:00
Joint Inspection 2 hrs 26 May 18:30
Replacement of manhole gaskets & Close Man Hole 2 hrs 26 May 18:30
Separator Vessel A 58 hrs 25 May 8:00
Remove heat insulation man hole 0 hrs 25 May 8:00
Remove man hole 2 hrs 25 May 13:00
Blowing & Gas Test 4 hrs 25 May 15:00
Inspection and Cleaning of Brine Accumulator Vessels - A 18 hrs 25 May 19:00
Measurement of wall thickness at 12 points and conduct NDT of the we 6 hrs 25 May 19:00
Joint Inspection 1 hr 27 May 16:00
Replacement of manhole gaskets & Close Man Hole 2 hrs 27 May 16:00
Inspection and Cleaning of Brine Strainers - B (2 EA) 30,5 hrs 25 May 8:00
Unbolting brine strainer A (2 EA) 3 hrs 25 May 8:00
Remove Cover Braine Strainer 2 hrs 25 May 11:00
Lift Up Strainer A (2 EA) 1 hr 25 May 11:00
Cleanine Strainer 5 hrs 25 May 13:00
Cleaning Internal Strainer 5 hrs 25 May 13:00
Install Strainer 2 hrs 25 May 18:00
Replace Gasket & Install Strainer Cover 5 hrs 26 May 8:30
Inspection and Cleaning of Brine Strainers - A (2 EA) 51 hrs 25 May 8:00
Unbolting brine strainer A (2 EA) 3 hrs 25 May 8:00
Remove Cover Braine Strainer 2 hrs 25 May 13:00
Lift Up Strainer A (2 EA) 1 hr 25 May 13:00
Cleanine Strainer 5 hrs 25 May 14:00
Cleaning Internal Strainer 5 hrs 25 May 19:00
Install Strainer 2 hrs 26 May 15:30
Replace Gasket & Install Strainer Cover 5 hrs 26 May 17:30
Inspection and Cleaning of Brine Strainers - C (2 EA) @ POWER PLANT 54 hrs 25 May 8:00
Unbolting brine strainer C (2 EA) 3 hrs 25 May 8:00
Remove Cover Braine Strainer 2 hrs 25 May 13:00
Lift Up Strainer C (2 EA) 1 hr 25 May 15:00
Cleanine Strainer 5 hrs 25 May 16:00
Cleaning Internal Strainer 5 hrs 25 May 16:00
Install Strainer 2 hrs 26 May 17:30
Replace Gasket & Install Strainer Cover 5 hrs 27 May 8:00
Separation System B, Gate Valve T-3157 Sizes 4 inch 10 hrs 25 May 8:00
Open the valve and inspection if any minor damage can be repair 2 hrs 25 May 8:00
Cleaning the valve seat and disc 3 hrs 25 May 10:00
Dye penetrant test on both disc and valve seat 1 hr 25 May 14:00
Contact check between valve seat and disc with prussian blue 1 hr 25 May 15:00
Replace Gaskets 2 hrs 25 May 16:00
Re-assemble and install 2 hrs 25 May 16:00
DUMP VALVE (2 EA) 24" & 12" 53 hrs 25 May 9:00
Disconnect Power by instrument team 1 hr 25 May 9:00
Remove Valve LV 3111 -24" 4 hrs 25 May 11:00
Remove Valve LV3101 - 12" 4 hrs 25 May 11:00
Lift Up Valve & Move to laydown area 1 hr 25 May 16:00
Lift Up Valve & Move to laydown area 1 hr 25 May 17:00
Cleaning & Inspection valve 3111 -24" 8 hrs 25 May 17:00
Cleaning & Inspection valve LV3101 - 12" 8 hrs 25 May 17:00
Reinstall Valve LV 3111 - 24" 4 hrs 26 May 14:30
Reinstall Valve LV 3101 - 12" 4 hrs 26 May 18:30
Reconnect power cable 2 hrs 27 May 11:00
2 hrs 27 May 11:00
Finish
27 May 18:00
27 May 7:29
25 May 0:59
25 May 2:59
25 May 2:59
25 May 4:59
26 May 12:00
25 May 1:59
25 May 6:59
26 May 12:00
25 May 5:59
25 May 6:59
25 May 7:59
25 May 10:59
27 May 1:29
26 May 19:29
25 May 14:59
25 May 17:59
26 May 9:29
26 May 13:29
26 May 16:29
26 May 19:29
25 May 13:59
25 May 13:59
25 May 13:59
25 May 13:59
25 May 13:59
27 May 1:29
27 May 1:29
27 May 1:29
27 May 1:29
26 May 16:00
26 May 14:00
26 May 16:00
25 May 17:59
27 May 7:29
27 May 1:29
27 May 3:29
25 May 17:59
27 May 5:29
27 May 7:29
25 May 8:59
25 May 8:59
25 May 11:59
25 May 10:59
25 May 11:59
25 May 17:59
25 May 14:59
25 May 16:59
25 May 17:59
27 May 5:59
25 May 21:59
26 May 1:59
26 May 5:59
27 May 5:59
27 May 2:59
25 May 5:59
25 May 9:59
25 May 13:59
26 May 13:59
26 May 14:59
26 May 20:59
27 May 0:59
27 May 2:59
25 May 11:00
25 May 8:30
25 May 10:30
25 May 11:00
26 May 11:00
25 May 8:00
25 May 9:00
25 May 21:00
26 May 1:00
26 May 7:00
26 May 9:00
26 May 8:00
26 May 9:30
26 May 11:00
26 May 18:00
26 May 18:00
27 May 18:00
26 May 16:00
25 May 4:00
25 May 8:00
25 May 8:00
25 May 12:00
25 May 16:00
26 May 8:00
26 May 8:00
26 May 9:00
26 May 9:00
26 May 9:00
26 May 9:00
26 May 16:00
26 May 16:00
26 May 12:00
25 May 10:00
25 May 12:00
25 May 16:00
26 May 9:00
26 May 10:00
26 May 12:00
25 May 10:00
25 May 10:00
25 May 12:00
27 May 7:00
25 May 4:00
25 May 8:00
24 May 20:00
25 May 20:00
26 May 0:00
27 May 1:00
27 May 1:00
27 May 2:00
26 May 10:00
27 May 3:00
27 May 3:00
27 May 7:00
27 May 7:00
26 May 14:00
25 May 10:00
25 May 15:00
25 May 19:00
26 May 10:00
26 May 11:00
26 May 14:00
25 May 12:00
25 May 15:00
25 May 17:00
26 May 16:30
26 May 11:30
25 May 10:00
25 May 15:00
25 May 18:00
26 May 10:30
26 May 11:30
25 May 18:00
26 May 14:30
26 May 16:30
25 May 20:00
25 May 20:00
27 May 9:00
26 May 10:00
25 May 10:00
25 May 15:00
25 May 18:00
26 May 9:00
26 May 10:00
26 May 4:00
26 May 18:30
27 May 9:00
26 May 13:30
25 May 5:30
25 May 9:00
25 May 10:00
25 May 12:00
25 May 15:00
25 May 17:00
25 May 19:00
26 May 11:30
26 May 13:30
26 May 15:30
25 May 5:30
25 May 9:00
25 May 11:00
25 May 14:00
25 May 16:00
25 May 18:00
26 May 9:30
26 May 14:30
26 May 15:30
27 May 14:00
26 May 14:00
25 May 8:59
25 May 12:59
25 May 16:59
25 May 20:59
25 May 21:59
26 May 14:00
27 May 11:00
27 May 14:00
27 May 18:00
27 May 0:00
25 May 23:59
26 May 3:59
26 May 12:00
26 May 16:00
26 May 17:00
27 May 0:00
27 May 16:00
27 May 18:00
26 May 19:30
25 May 16:00
25 May 9:00
25 May 10:00
25 May 11:30
25 May 13:30
25 May 15:00
25 May 16:00
25 May 16:00
25 May 9:00
25 May 10:00
25 May 11:30
25 May 13:30
25 May 15:00
25 May 16:00
26 May 11:30
25 May 17:00
25 May 18:00
25 May 19:30
26 May 9:00
26 May 10:30
26 May 11:30
26 May 11:30
25 May 17:00
25 May 18:00
25 May 19:30
26 May 9:00
26 May 10:30
26 May 11:30
26 May 19:30
26 May 13:30
26 May 14:30
26 May 16:00
26 May 17:00
26 May 18:30
26 May 19:30
26 May 19:30
26 May 13:30
26 May 14:30
26 May 16:00
26 May 17:00
26 May 18:30
26 May 19:30
27 May 0:00
26 May 18:30
25 May 14:00
25 May 19:00
25 May 19:00
26 May 13:30
26 May 13:30
26 May 18:30
27 May 0:00
25 May 18:00
26 May 4:00
26 May 14:00
27 May 0:00
25 May 18:00
26 May 4:00
26 May 14:00
27 May 0:00
26 May 20:00
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 20:00
26 May 20:00
26 May 20:00
26 May 20:00
26 May 20:00
26 May 20:00
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 16:00
26 May 16:00
26 May 16:00
26 May 19:30
26 May 8:30
26 May 19:30
26 May 19:30
26 May 19:30
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
25 May 19:00
26 May 18:30
26 May 18:30
26 May 18:30
26 May 18:30
27 May 0:00
27 May 0:00
26 May 12:00
26 May 16:00
26 May 20:00
27 May 0:00
26 May 16:00
25 May 16:00
26 May 2:00
26 May 2:00
26 May 4:00
26 May 16:00
26 May 15:30
25 May 11:00
25 May 17:00
25 May 19:00
26 May 9:30
26 May 11:30
26 May 15:30
27 May 18:00
26 May 20:30
24 May 19:30
25 May 10:00
25 May 17:00
26 May 18:30
25 May 17:00
26 May 20:30
26 May 20:30
26 May 20:30
24 May 19:00
25 May 10:00
25 May 17:00
26 May 18:30
25 May 17:00
26 May 20:30
26 May 20:30
27 May 9:00
25 May 9:00
25 May 12:00
25 May 17:00
26 May 18:30
25 May 17:00
27 May 9:00
27 May 9:00
27 May 18:00
25 May 8:00
25 May 15:00
25 May 19:00
27 May 16:00
26 May 14:30
27 May 17:00
27 May 18:00
26 May 14:30
25 May 11:00
25 May 14:00
25 May 12:00
25 May 18:00
25 May 18:00
26 May 8:30
26 May 14:30
27 May 11:00
25 May 11:00
25 May 15:00
25 May 14:00
25 May 19:00
26 May 13:30
26 May 17:30
27 May 11:00
27 May 14:00
25 May 11:00
25 May 15:00
25 May 16:00
26 May 9:30
26 May 9:30
26 May 19:30
27 May 14:00
25 May 18:00
25 May 10:00
25 May 14:00
25 May 15:00
25 May 16:00
25 May 18:00
25 May 18:00
27 May 14:00
25 May 10:00
25 May 16:00
25 May 16:00
25 May 17:00
25 May 18:00
26 May 14:30
26 May 14:30
26 May 18:30
27 May 11:00
27 May 14:00
27 May 14:00