EXISTING FLOWCHART FOR PROCESSING AND APPROVAL OF

PRIVATE LAND TIMBER PERMIT/SPECIAL PRIVATE LAND TIMBER PERMIT


(DENR ADMINISTRATIVE ORDER No. 2000-21)

Tenurial CENRO PENRO USEC for FMB SECRETARY


APPLICANT RED
Instruments/ Field
Permits/ Operations
Licenses
 Submits  Receives and  Receives and  Receives and  Receives and  Receives and
Issued
letter of log-in letter of log-in logs-in  Receives and logs-in logs-
application application application complete logs-in application application
together together with together with application application with the together with
Private Land with the complete together with together with requirements draft permit.
Timber Permit requirement requirements. requirements final the endorsed by  Signs and
(PLTP) s to the  Review and  Reviews and requirements requirements the field issues permit
evaluates evaluates the  Reviews and endorsed by offices and with a
CENRO.
Special Private application. evaluates the the Regional referred by volume of
submitted
Land Timber offices. USEC F.O.
application  Conducts application. more than
Permit (SPLTP)  The USEC for  Reviews and
together with validation at  Issues the 200 cubic
Field evaluates the
requirement. 5% intensity required meters
Operations applications
 Field inspectors of the timber permit within for (PLTP) and
refers the
verifies/validat inventory his level of cases to FMB consistency more than 10
es and conducts report authority up for review/ with existing cubic meters
100% inventory submitted by to 50 cu.m. appropriate policies and (SPLTP).
within the area the CENRO to (PLTP) and action. checks for  Forward
applied for and determine 10 cu.m.  Receives and completeness approved
collates data whether it (SPLTP). logs-in action and accuracy permit to
gathered and conforms  Prepares prepared by of the FMB for
prepares with existing endorsement the Director, inspection release/
inspection guidelines s to higher FMB. reports mailing.
Requirements: report. and the authorities  Issues submitted.
 Reviews and forest data concerned for required  If the
 Duly accomplished application evaluates gathered is evaluation permit for inspection
form inspection accurate. and approval volume more reports and
than 50 cu.m. supporting
 Authenticated copy of the land report.  Issues the of the
up to 200 documents are
 Issues the required permits not
title/certificate of Land required permit permit within within his
cu.m. (PLTP). in order, a
 Reviews draft permit is
Ownership Agreement within his level his level of level of
initials/ signs prepared for
 Sketch map of authority up authority up authority. and forwards approval of
to 10 cu.m. to 15 cu.m. the Secretary.
 Initial Environmental (PLTP). (PLTP)
to the Office
of the  Forward
Examination  Endorse to Endorse to RED Secretary application
 Inventory Fee of P1,200.00/ha PENRO, PLTP PLTP prepared with draft
applications application permit not permit to
plus transportation cost for with volume exceeding 15 within his Secretary thru
inventory team exceeding 10 cu.m. authority to USEC F.O.
cu.m.. approve for
approval.