Calibration of all controlling equipments, like pressure & temperature guage, flow meters
and control valves.
All turning Equipment’s should be ok from mechanically & electrically. Like fans, pump,
gearbox, feeding system.
All Air nozzles and wind box should be clean.
All interlocks should be checked like fans, Fuel Feeding System, Drum level interlocks,
bed temp interlock (low& high), and Deaerator level furnace pressure (low& high).
Take hydro test for checking pressure parts leakage & valve passing.
Light up Procedure
Maintain 50% drum level
Open all air vent
Take DP Steady
Then start bed material charging during that time ID root blower & PA fan should be in
running condition with maintaining draft 0 to -5mmwc and 50 TPH PA flow.
After reaching bed height 300mm and wind pressure 400 to 450mmwc and also checked
minimum & maximum fluidization of bed material and write down flow & pressure of air
at min & max fluidization.
Then stop all fans
Start spreading of charcoal on bed 8 to 10% of total bed material for biomass light up
Then furnace temperature will start rising and reached up to 100°C (furnace temp.)then
open ID & PA Dampers take one mixing with 60 TPH air flow for 40 sec with
maintaining furnace draft (0to -5mmwc)then reduce air flow as with min
fluidization(bubbling) and then observe bed temp. Continuously.
When bed temp. rise up to 300°C start biomass feeding(min .feeding)maintain furnace
draft(0 to -5mm)& also monitor & maintain O2 (3 to 7%) .
When Bed Temp reaches to 600°C then start coal feeding.
When Drum pressure goes to 3 to 4 kg/cm2 then close drum vent.
When Bed temp. rises up to 800°C to 850°C control fuel feeding & O2 (3 to 6%) through
fuel & air ratio & Ensure fluidization completely continue.
Then start rising of temp. & pressure of steam in stable proportional ratio.
When steam pressure goes up to 40kg/cm2 with steam temp 350°C to 400°C then start
steam line charging through MSSV bypass valve and insure all drain and vent of steam
line should be in open condition.
When steam line & boiler pressure equal then open MSSV fully open & MSSV bypass
fully closed.
Controlled startup vent as per required steam pressure and temp.
Drum level maintain always 50%.
Increase bed height 500 to 600mmwc when bed temp. Hold 800°C to 900°C then start
RDF feeding and observe bed temp. Hold or not.
If bed temp. Maintain then reduce coal feeding as per requirement and stop biomass
feeding.
After successfully startup maintain boiler all parameter normally.
When ESP inlet temp. Of flue gas reached up to 130°C then charge ESP.