Sei sulla pagina 1di 1

PISTA BUFFET

PROPOSED COSTING
SCOPE OF WORKS REMARKS
LABOR(40%) MATERIALS(60%)
DEMOLITION PHP 10,000.00
Owner Supply, tiles @ 180 per piece,
TILING PHP 5,900.00 PHP 7,245.00 estimated 35 pieces, = Miscellaneous tile
adhesive contingency
PAINTING WORKS PHP 4,600.00 PHP 6,900.00
CEILING WORKS PHP 6,600.00 PHP 9,900.00
ELECTRICAL WORKS PHP 2,000.00 PHP 3,000.00
DRYWALL PHP 2,800.00 PHP 4,200.00
HAULING PHP 800.00 PHP 1,200.00
TOTAL PHP 32,700.00 PHP 32,445.00 PHP 65,145.00
FOOD STALLS
CLEAN UP PHP 5,000.00
SIGNAGE PHP 45,000.00
TOTAL PHP 50,000.00

Potrebbero piacerti anche