Sei sulla pagina 1di 4

Mufadda

Planning Engineer Coordinator/Assistant Manager

Professional Project Management with more than five years of experience in


the project management process. Seeking a challenging career as Project
Management Professional with excellent record successfully completed
multiple simultaneous projects.

In personal, I’m active and co-operative in team work, good leadership


Email : mufadda90@gmail.com
on site, have been more than 5 years working experiences in Automotive
Industry, Oil & Gas, Petrochemical & Power Plant have been done for
Phone : +62 812 2149 4928 Construction, Project Management, Pre-Commissioning and
Commissioning of the Mechanical, Electrical and Instrument for SKIDS,
Address : Cikampek, Jawa Barat PLATFORM, Submersible Drilling Rig. Familiar with Mechanical,
Electrical & Instrument drawings, general settings, and P & ID and also
Linkedin : linkedin.com/in/mufadda Mechanical / Electrical / Instrument and Equipment building materials
included, understood and have knowledge to work in Hazardous Areas.
Skype : mufadda19
Routine activity, to monitor and supervise M,E&I,P work installation,
monitor and record site progress and prepare M,E&I daily, weekly,
SKILLS monthly progress, inspection of E&I receiving material on warehouse
and site installation, attend on site to do and whiteness for inspection
Project Management and testing, prepare and review of check list& test sheet, supervision
during fabrication and installation work refer to standard installation and
specification Implemented the Quality program, ITP, installation standard
M. Excel M. and procedure. Check and in charge for work permit (JSA, Procedure)
and implementation on site.

Project Technical Skills


- Project Management experience
- Strong expertise and complex in MEP equipment
Primavera P6 - Accounting (claim) and project estimation analysis
- Advanced supervisory and training skills
- Project Planning & Budgeting Control Analysis
SAP System
Personal Skills
- Good verbal and written communication skills
Team Work - Motivated and always willing to learn new things
- Independent and self-sufficient
- Collaborative and able to work in teams or groups
Leadership
Goals & Achievements
- Handling big clients (Apical-KAO) Apricot Project (2018-2019)
- Handling big clients Joint Venture CSTS (Chiyoda, Saipem, Tripatra,
LANGUAGES Suluh Ardi) & (CBR Project-Panama, Africa) (2018)
- Handling big client Hyundai Engineering & Construction. Co. Ltd (2017-
English 2018)
- Handling big clients APP Group Sinarmas, Timas Suplindo (2016- 2017)
German
- Handling big clients Siemens, VICO, Pertamina, DNV-GL, Bureau
Veritas, Llyods Register (2014-2016)
- Handling for big customers for PT. HPM (Honda Prospect Motor),
Indonesia Yamaha, Toyota, etc (2013-2014)

Education
Bachelor of Mechanical Engineering (2008-2013)
Institut Teknologi Nasional (Itenas)
West Java (GPA : 2.96)
WORK EXPERIENCE
Aug 2018 ~ Now, Project Planning Control (Coordinator) at PT. GRAMA BAZITA handling for Electrical
& Instrument) Construction & Installation in (Apical Projet Dumai/Apricot Project) from Start Until
Commissioning/Closing Project.

Category : Petrochemical (EPC Project)


Clients : - APICAL Group (Owner)
- Mott Macdonald (Client from Owner)

• Authoring all project staffing, budget, cash flows and progress curves for daily, weekly, monthly reports.
 Ensuring estimation for commercial projects, examples : proposal tender, (manpower, tools, machine,
consumables, JSA for safety).
• Calculating running expenses, temporary manpower compensation and other indirect project costs.
• Responsible for controlling, scheduling, tracking and updating all newly-designed build sites in the
installation/erection.
• Preparing project timelines and project adjustments as necessary.
• Developing and budgeting control methods to curb project costs while ensuring safety.
• Preparing billing claim/work progress claim for accounting Department.
• Schedule analysis for critical, maintain every milestone and acceleration progress.
• Preparing S-Curve & WBS for the project.

Feb 2018 ~ Jul 2018, Project Planning Control (Coordinator) at PT. Epiterma Mas Indonesia/Konstruksi
(EMI/K) handling for plate, piping, trust (trust building/conveyor), single beam, (Fabrication/Installation
Project).

Category : Fabrication & Installation (Oil & Gas Project)


Clients : - CSTS, (Chiyoda-Saipem-Tripatra-Suluh Ardi) Engineering Joint Venture for BP Tangguh
- PT. Sanggar Sarana Baja
- CBR Project (Panama, Africa)
- MTP (Muara Tania Panama, Africa)
- TKD (Toka Tindung)

• Authoring all project staffing, budget, cash flows and progress curves for daily, weekly, monthly reports.
• Ensuring estimation for commercial projects, examples : proposal tender, (manpower, tools, machine,
consumables, JSA for safety).
• Calculating running expenses, temporary manpower compensation and other indirect project costs.
• Responsible for controlling, scheduling, tracking and updating all newly-designed build sites in the
fabrication and installation/erection.
• Preparing project timelines and project adjustments as necessary.
• Developing and budgeting control methods to curb project costs while ensuring safety.
• Preparing S-Curve & WBS for the project.

Jun 2017 ~ Jan 2018, Coordinator of Project Planning Control in (2x100 MW, Tanjung Power Indonesia
Project) Base on Banjarmasin (Mechanical Construction) at PT. Truba Jaya Engineering.

Category : Power Plant (EPC Project)


Clients : - PT. HGU, Hein Global Utama (Main Contractor)
- PT. Tanjung Power Indonesia (Owner)
• Authoring all project staffing, budget, cash flows and progress curves for daily, weekly and monthly
progress reports.
• Preparing billing claim reports/invoice document preparation as per periodically, based on contract.
• Ensuring estimation for commercial projects, examples : proposal tender, (manpower, tools, machine,
consumables, JSA for safety).
• Calculating running expenses, temporary manpower compensation and other indirect project costs.
• Preparing S-Curve & WBS for the project.
• Helping Site Manager, preparing for target/progress which will be achieved.
• Preparing Planning for acceleration schedule analysis.

Jun 2016 ~ Jun 2017, Project Planning Engineer in (Asian Pulp & Paper Project) Base on Palembang
(Electrical & Construction) from Start until Commissioning/Closing at PT. Exabb Energy Nusantara

Category : Petrochemical (EPC Project)


Clients : - PT. Timas Suplindo (Main Contractor)
- PT. OKI Pulp & Paper (Owner)

• Responsible for controlling, scheduling, tracking and updating all newly-designed build sites in the
fabrication and installation.
• Preparing project timelines and projection adjustments as necessary.
• Developing and budgeting control methods to curb project costs while ensuring safety.
• Preparing analysis reports to track the progress of each phase of construction.
• Authoring all project staffing, budget, cash flows and progress curves for daily, weekly and monthly
progress reports.
• Preparing billing claim reports/billing document preparation as per periodically, based on contract.
• Ensuring soundness of estimates for commercial projects.
• Calculating running expenses, temporary manpower compensation and other indirect project.

Dec 2014 ~ May 2016, Design Engineering & Project Control in (Triplex, Duplex Pump Cementing &
HWU 360K) Workshop, Fabrication, Installation at PT. Elnusa Fabrikasi Konstruksi

Category : Oil & Gas (Drilling)


Clients : - PT. Elnusa (Main Contractor)
- PT. Vico Indonesia
- PT. Siemens
- Bureau Veritas (Certificate Company)
- Llyods Register (Certificate Company)
- DNV-GL (Certificate Company)

• Preparing contract documents from accepted bids for engineering, extraction projects, and construction.
• Researching customer design proposals to evaluate suitability, cost and long term maintenance of
applications.
• Collaborating with engineer and requiring personnel to resolve system malfunctions, implement operating
protocols and provide necessary technical information.
• Ensuring conformance with engineering design and performance specifications by specifying direct
modification of products.
• Ensuring that all project operations were carried out in safe productive manner.
• Working with budgeting department to determine estimated operations expenses.
• Tracking the delivery of all project related materials.
Nov 2013 ~ Nov 2014, Research & Development for (Honda Mobilio, HR-V, BR-V, Toyota Ayla & Agya,
Avanza, Proton) Design, Prototype, Testing, Release at PT. APM Armada Suspension

Category : Automotive Industry


Clients : - PT. Honda Prospect Motor Indonesia
- PT. Proton Malaysia
- Toyota Astra Motor Indonesia

• Development of products and suspension components; working from initial concept and design to
production phase, machining, prototyping, testing and release.
• Successfully identifying process improvements that increased production uptime, improved product quality
and reducing intensive inspection process.
• CAD work with NX5 & NX Ideas to design components and tooling. Worked closely with fabrication
department.
• Authoring peer reviewed process controls documentation and test procedures.
• Conducting design of experiments.
• Testing validation of theoretical prediction of seal performance. Acted as project engineer, overseeing
mechanical design of seal, seal manufacturing and testing.

I hereby declare that above statement is true and correct in all details. January 2019

Prepared by :

Mufadda

Potrebbero piacerti anche