Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
7
Traffic, Transport & Process
Urban Planning Subject Q3- Forms P.Girigori
owner
Meteorological Date
Filename QF_CPAR form.docx 15-04-2019
Department issued
Curaçao Status Final Version Version 1A
Instructions:
Use <tab> key on your keyboard to navigate.
Light green cells are checkboxes that need to be checked. If the corresponding checkbox needs to be checked,
click on the space bar to toggle between checked and unchecked states.
Light blue or shaded textboxes are fields that need to be filled in. The light blue/shaded fields expand as you
continue typing.
Enter the date in the format dd-mm-yyyy as specified.
Version:
QMS Document attached
Corrective Action
Open Distribution No
Yes Reason:
During the quality report of May 2019 it has been observed that the weather stations perform poorly. Due
to this low performance a CPAR has been opened to remedy this situation.
Station Availability
R11 (serial radio) 89.3%
R29 (serial radio) 89.8%
Soto (GPRS) 49.1%
Spaanse water (DOMESTIC ADSL) 1.0%
Sta Maria (TCP/IP LOCAL LOOP) 80.9%
Station Kokori (TCP/IP LOCAL LOOP) 80.3%
Seinpost (TCP/IP LOCAL LOOP) 81.0%
Steenrijk (TCP/IP LOCAL LOOP) 80.9%
Savonet (GPRS) 40.9%
Sumbu (DOMESTIC ADSL) 0%
Onverwacht (DOMESTIC ADSL) 0%
Punda (ip Radio) In repair
Klein Kwartier (ip Radio) In repair
Responsible
Assigned Process name Due Date:
Manager
To
H. Pieter Infrastructure Maintenance (QP-713) 31-08-2019
Root Cause:
There 3 main causes that causes a reception performance lower that 100%.
1-For R11 and R29 this is interference with other radio signal in vicinity of the airport since this
communication is through UHF radio transmission.
2-For GPRS the communication TCP/IP handshake needs to be troubleshoot with Sutron.
3- For the Domestic DSL and Local Loop network this has been fixed, the results are visible in the report of
July 2019. The network for ip radio will be troubleshoot after August 2019
Proposed Corrective / Preventive Actions
Describe proposed actions to correct the problem and prevent recurrence. Include the required resources and due dates.
No Proposed action(s) Responsible Personnel Target date
The following actions are the immediate short
term corrective actions to be taken:
1. For 1 it is difficult to minimize this in this
area
2. We are in the process of trouble Haime and Clara Patch 31 July 2019
shooting
3. Setup radios will be step number 1. Haime and Wendell 15 Aug 2019
Add lines if
required
Review Responsible Process name Acceptance Date
Actions Manager
Completed H. Pieter Infrastructure Maintenance 25 July 2019
(QP-713)
Section 4 – Verification
Verification Method(s) and Results
State how the completed actions were verified and the observed effectiveness of the actions taken to preclude recurrence of the non-conformity
No
yyyy-mm-dd