OBRA
: "RENOVACIÓN DE VÍAS URBANAS; EN EL TRAMO 1-1408 – CALLE 1RO DE MAYO DESDE 25 DE DICIEMBRE HASTA 8 DE DICIEMBRE, DISTRITO DE GU
PROVINCIA PACASMAYO, DEPARTAMENTO LA LIBERTAD"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE GUADALUPE
CONTRATISTA : CONSORCIO DEL NORTE
RESIDENTE : ING. OSMAN ALBERTO MENACHO BERNAL
OBRA
: "RENOVACIÓN DE VÍAS URBANAS; EN EL TRAMO 1-1408 – CALLE 1RO DE MAYO DESDE 25 DE DICIEMBRE HASTA 8 DE DICIEMBRE, DISTRITO DE GU
PROVINCIA PACASMAYO, DEPARTAMENTO LA LIBERTAD"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE GUADALUPE
CONTRATISTA : CONSORCIO DEL NORTE
RESIDENTE : ING. OSMAN ALBERTO MENACHO BERNAL
1 Mano de obra (incluido leyes sociales) 100.00% 0.230 583,426.82 602.11 600.40 133,807.07
3 Maquinaria y equipo nacional 100.00% 0.183 583,426.82 370.70 370.25 106,637.50
2 Cemento portlan tipo I 100.00% 0.179 583,426.82 476.04 463.18 101,612.18
Agregado grueso 81.92% 444.38 450.37 85,736.26
4 0.177 583,426.82
Hormigón 18.08% 429.21 429.35 18,676.68
Madera terciada para carpintería 45.00% 330.73 330.40 20,982.41
5 Acero de construcción corrugado 31.25% 0.080 583,426.82 531.71 536.72 14,723.10
Herramienta manual 23.75% 310.13 318.93 11,399.65
6 Indice General de Precios al Consumidor 100.00% 0.151 583,426.82 450.63 452.87 88,535.37
Monto Maximo a Otorgar al Contratista por Adelanto de Materiales :
Monto Maximo Calculado Solicitado por el Contratista como Adelanto por Materiales:
IGV (18%)
Total del Adelanto de Materiales Solicitado (inc Igv)
Incidencia del A.M. Solicitado respecto al Monto Contractual de Obra :
ADELANTO ESPECIFICO PARA MATERIALES E INSUMOS
CALCULO DE MONTOS MAXIMOS A SOLICITAR
OBRA
: "RENOVACIÓN DE VÍAS URBANAS; EN EL TRAMO 1-1408 – CALLE 1RO DE MAYO DESDE 25 DE DICIEMBRE HASTA 8 DE DICIEMBRE, DISTRITO DE GU
PROVINCIA PACASMAYO, DEPARTAMENTO LA LIBERTAD"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE GUADALUPE
CONTRATISTA : CONSORCIO DEL NORTE
RESIDENTE : ING. OSMAN ALBERTO MENACHO BERNAL
Nota: Para el Ima se ha empleado los IU del mes de Febrero del 2019, publicados el 15 de Marzo del 2019.
ARA MATERIALES E INSUMOS
OS MAXIMOS A SOLICITAR
1RO DE MAYO DESDE 25 DE DICIEMBRE HASTA 8 DE DICIEMBRE, DISTRITO DE GUADALUPE,
ARA MATERIALES E INSUMOS
OS MAXIMOS A SOLICITAR
1RO DE MAYO DESDE 25 DE DICIEMBRE HASTA 8 DE DICIEMBRE, DISTRITO DE GUADALUPE,
Monto %
Solicitado No Solicitado
inc. IGV (S/.)
0.00%
0.00%
41,879.43 41.21%
40,472.75 47.21%
5,790.11 31.00%
7,314.24 34.86%
3,429.37 23.29%
0.00%
0.00%
98,885.90 20.00%
98,885.90
17,799.46
116,685.36
20.00%
CRONOGRAMA D
Presupuesto: RENOVACIÓN DE VÍAS URBANAS; EN EL TRAMO 1-1408 – CALLE 1RO DE MAYO DESDE 25 D
Propietario: MUNICIPALIDAD DISTRITAL DE GUADALUPE
Ubicación: AV. LAS AMERICAS DESDE PANAMERICANA HASTA LA CIRCUNVALACION
Lugar: GUADALUPE
Fecha: 15/04/19
2.46% 12.13%
ABRIL 2019 MAYO 2019
CANTIDAD PRECIO PARCIAL 09 - 30/04/2019 01 - 31/05/2019
CANTIDAD PARCIAL CANTIDAD PARCIAL
41,879.43
3,059.84 19.49 59,636.27 75.37 1,468.91 371.01 7,231.08
695.42 30.30 21,071.13 17.13 519.01 84.32 2,554.94
24.03 50.84 1,221.86 0.59 30.10 2.91 148.15
0.50 40.14 20.23 0.01 0.50 0.06 2.45
5.90 26.42 155.99 0.15 3.84 0.72 18.91
101.56 2.00 203.12 2.50 5.00 12.31 24.63
2.00 296.10 592.20 0.05 14.59 0.24 71.81
20.00 2.50 50.00 0.49 1.23 2.43 6.06
- 41,071.37
-
4,107.16 6.50 26,696.57 101.16 657.57 498.01 3,237.04
15.25 295.00 4,498.75 0.38 110.81 1.85 545.49
61.00 215.20 13,127.20 1.50 323.34 7.40 1,591.71
1.00 9,985.02 9,985.02 0.02 245.94 0.12 1,210.71
1.00 45,000.00 45,000.00 0.02 1,108.40 0.12 5,456.39
192.00 101.70 19,526.40 4.73 480.96 23.28 2,367.64
595.20 90.20 53,687.04 14.66 1,322.38 72.17 6,509.72
177.17 60.84 10,779.10 4.36 265.50 21.48 1,307.00
5,434.99 1.35 7,337.24 133.87 180.73 659.01 889.66
5,434.99 1.69 9,185.13 133.87 226.24 659.01 1,113.73
192.00 97.46 18,712.32 4.73 460.91 23.28 2,268.93
3.00 350.00 1,050.00 0.07 25.86 0.36 127.32
250.92 3.81 956.01 6.18 23.55 30.42 115.92
204.26 3.81 778.23 5.03 19.17 24.77 94.36
2,543.85 0.20 508.77 62.66 12.53 308.45 61.69
148.73 3.81 566.66 3.66 13.96 18.03 68.71
15.00 32.20 483.00 0.37 11.90 1.82 58.57
86.33 4.81 415.26 1.40 10.23 10.47 50.35
- 223,292.70
40,472.75
5,579.10 50.85 283,697.31 137.42 6,987.81 676.48 34,399.17
2,016.00 20.00 40,320.00 49.66 993.13 244.45 4,888.92
9,935.94 1.70 16,891.09 244.73 416.05 1,204.76 2,048.10
192.00 64.90 12,460.80 4.73 306.92 23.28 1,510.91
4,219.76 2.71 11,435.55 103.94 281.67 511.66 1,386.60
192.00 29.50 5,664.00 4.73 139.51 23.28 686.78
929.85 5.90 5,486.12 22.90 135.13 112.75 665.21
72.33 56.64 4,097.02 1.78 100.91 8.77 496.78
216.00 16.94 3,659.04 5.32 90.13 26.19 443.67
133.89 25.00 3,347.21 3.30 82.45 16.23 405.86
326.40 5.90 1,925.76 8.04 47.43 39.58 233.50
554.00 2.90 1,606.60 13.65 39.57 67.17 194.81
768.00 1.70 1,305.60 18.92 32.16 93.12 158.31
384.00 2.36 906.24 9.46 22.32 46.56 109.88
73.50 8.26 607.11 1.81 14.95 8.91 73.61
24.81 21.18 525.40 0.61 12.94 3.01 63.71
73.50 7.08 520.38 1.81 12.82 8.91 63.10
6.30 30.90 194.67 0.16 4.79 0.76 23.60
17.85 6.00 107.10 0.44 2.64 2.16 12.99
48.07 2.00 96.14 1.18 2.37 5.83 11.66
11.55 8.26 95.40 0.28 2.35 1.40 11.57
48.00 1.50 72.00 1.18 1.77 5.82 8.73
9.00 5.90 53.10 0.22 1.31 1.09 6.44
7.35 7.08 52.04 0.18 1.28 0.89 6.31
7.35 7.08 52.04 0.18 1.28 0.89 6.31
48.00 1.00 48.00 1.18 1.18 5.82 5.82
3.00 8.26 24.78 0.07 0.61 0.36 3.00
2.10 9.44 19.82 0.05 0.49 0.25 2.40
2.10 8.26 17.35 0.05 0.43 0.25 2.10
0.60 25.19 15.11 0.01 0.37 0.07 1.83
12.38 1.00 12.38 0.30 0.30 1.50 1.50
3.00 1.50 4.50 0.07 0.11 0.36 0.55
0.14 2.00 0.29 0.00 0.01 0.02 0.04
- 354,847.20
5,790.11
56.38 235.50 13,278.64 - -
225.96 139.50 31,521.94 - -
208.53 10.59 2,208.36 - -
163.20 12.71 2,074.27 - -
163.20 10.59 1,728.30 - -
121.39 10.59 1,285.52 - -
454.64 10.59 4,814.68 - -
1,239.44 10.59 13,125.72 - -
360.96 10.59 3,822.61 - -
21.28 139.50 2,968.32 - -
192.00 80.53 15,461.76 - -
1.00 13,020.50 13,020.50 - -
- 99,520.51
701,563.45 17,280.35 85,066.71
26.94% 35.50%
JUNIO 2019 JULIO 2019
01 - 30/06/2019 01 - 07/07/2019 TOTAL
CANTIDAD PARCIAL CANTIDAD PARCIAL
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
34.97% 46.09%
INICIO DE OBRA 4/9/2019 22 ABRIL
90 31 MAYO
7/7/2019 30 JUNIO
7 JULIO