Sei sulla pagina 1di 7

NOTES:

C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
PLUMBING LEGEND: REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.
FD-* FLOOR DRAIN
DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE
HD-* HUB DRAIN

RD-* ROOF DRAIN

AD-* AREA DRAIN

BACKFLOW PREVENTER

SANITARY TRAP 1345 ROSEMOUNT AVENUE


EXISTING EXISTING GROUND
BASEMENT FLOOR CORNWALL, ONTARIO
CANADA K6J 3E5
CO-* CLEAN OUT
PHONE: 613-933-5602 FAX: 613-936-0335
WWW.WSPGROUP.COM
CO-* CLEAN OUT (PROVIDE ACCESS AT
FLOOR SURFACE)

BALL VALVE

WHA-* WATER HAMMER ARRESTOR *- SIZE

OFFICE PIPE UP TO ABOVE


113
PIPE DOWN TO BELOW
CONNECT DCW PIPING TO
EXISTING 50ø DCW PIPE CAP
APPROX. HERE.
VTR
VENT THROUGH ROOF
WC4 OFFICE 116
CHECK VALVE
112
CIRCUIT SETTER. *- TYPE AS SPECIFIED

PUMP
WC3
V SANITARY VENT PIPING

DOMESTIC COLD WATER PIPING


110
DOMESTIC HOT WATER PIPING
40ø
DOMESTIC HOT WATER RECIRC. PIPING

VESTIBULE X X X X PIPING TO BE REMOVED


109
111 SAN SANITARY PIPING BELOW FLOOR SLAB

40ø SAN SANITARY PIPING ABOVE FLOOR SLAB

STM STORM PIPING BELOW FLOOR SLAB


WC2 117
A 119
STM STORM PIPING ABOVE FLOOR SLAB

R REFRIGERANT PIPING
EXISTING COMBINED SANITARY AND
CORRIDOR STORM SEWER PIPING. REMOVE L-* LAVATORY
101 COMBINED FITTINGS AND CONNECT
WC1 TO EXISTING SANITARY AND STORM WC-* WATER CLOSET
RD-1 PIPING IN THIS AREA.
S-* SINK
DF-* DRINKING FOUNTAIN
EXISTING GROUND
CO-1 CO-1 FLOOR EVAP-* DUCTLESS SPLIT EVAPORATOR

STM
B COND-* DUCTLESS SPLIT CONDENSER
100ø
STM NEW ET-* EXPANSION TANK
RUN DRAIN THRU CEILING
ADDITION
FROM EVAPORATOR TO CO INV. -1009mm INV. -1023mm
FUNNEL FLOOR DRAIN IN RCP-* DOMESTIC HOT WATER RECIRC. PUMP
ROOM 108. 40ø
100ø 100ø DHWT-* DOMESTIC HOT WATER TANK
CO WH-* WALL HYDRANT
EXISTING RD-1
BASEMENT
NOTE: * INDICATES TYPE AS SPECIFIED. THE WORD
C AD-1 AD-1 100ø
"REMOVE" MEANS REMOVE AS PART OF THIS CONTRACT.
NEW ELEV.
ADDITION
E1 150ø
102A
RCP-1 CORRIDOR
FD-2
CO-1 101
D ET-1
100ø 108 20ø 100ø
CO FFD-1
@ 1% SLOPE
STM
SAN

RD-1 SAN SAN SAN


FDK OVERFLOW PLUMBING FIXTURE SERVICING
100ø
STM

R 20ø
MAIN OFFICE K4 FIXTURE COLD HOT TEMP. WASTE VENT
STM

REFRIGERANT DHWT-1 CO
102 PIPING TO/FROM RD-1 RD-1 FD- TSP - - 75ø 40ø
R 20ø
EVAP-1 R ABOVE. BF WC HD- TSP - - 75ø 40ø
V.P.
E WC-2 107
100ø
S- 12ø 12ø - 40ø 32ø
SUMP PIT #1. R 105 20ø 20ø WC- 32ø - - 75ø 50ø
INV. -1389mm V PRINC. 75ø
REFER TO DETAIL WHA-B L- 12ø 12ø - 32ø 32ø
104 CO S-1 S-1
RD-1 ON DWG. L-1 25ø
150ø WHA-B 40ø 20ø CO
CO 75ø V.T.R 20ø
SAN

CONNECT SANITARY
PIPING TO SANITARY 1000 150ø
SEWER APPROX. 1M 20ø DF-1 20ø 50ø 40ø 100ø CONNECT STORM
100ø @ 1% SLOPE 20ø 100ø
V

OUTSIDE BLDG. CO-1 20ø VEST. WATER HAMMER ARRESTOR


SAN CO-1 RD-1 PIPING TO STORM
SAN SAN SAN
CORRIDOR 100ø @ 1% SLOPE 200ø 106 SEWER APPROX. 1M
100ø 100ø CO-1 200ø 75ø 100ø 100ø TYPE RATING(PDI) SIZE
OUTSIDE BLDG.
F FOYER 75ø 101 WHA-A A1-11 12ø
CO STM STM STM
100 25ø 150ø 75ø WHA-B B12-32 20ø
WH-1 CO 200ø 250ø 250ø WHA-C C33-60 25ø
G CO
WC-1 20ø WHA-D C61-113 32ø
STM WC-1 20ø
75ø VTR WC-1
CO WHA-B INV. -1542 INV. -2410mm 4 ISSUED FOR TENDER 5/30/2014
100ø 20ø V 75ø WHA-B
75ø VTR 3 ISSUED FOR 95% REVIEW 5/20/2014
L-1 WHA-C 20ø 2 ISSUED FOR 85% REVIEW 2/07/2014
L-1
SAN

DROP 20ø COLD WATER WHA-B


SAN

LINE DOWN IN WALL 1 ISSUED FOR 50% REVIEW 12/03/2013


AND EXTEND TO NON- 75ø 100ø 40ø No. BY REVISIONS/SUBMISSIONS DATE
FREEZ WALL HYDRANT. 25ø
150ø
20ø 75ø
S-1
40ø
S-1 S-1 COLBOURNE & KEMBEL,
S-1 ARCHITECTS INC.
100ø
S-1 S-1
RD-1 100ø RD-1 RD-1 739D ARLINGTON PARK PLACE
STM STM STM KINGSTON ONTARIO K7M 8M8
TEL 613-384-2240 FAX 613-384-1277
CO 100ø info@ckai.ca www.ckai.ca
CO

PROJECT

CLASSROOM CLASSROOM CLASSROOM


K1 K2 K3
WINCHESTER PUBLIC SCHOOL
ADDITION
DEMOLITION NOTES
EXISTING MECHANICAL SYSTEM SHOWN IS DIAGRAMATIC
LOUISE ST. WINCHESTER ONTARIO
AND IS BASED ON ORIGINAL DRAWINGS. THE DRAWING MAY
H NOT REPRESENT "AS-BUILT" CONDITIONS. IT IS THE
DRAWING

RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ON SITE,


PRIOR TO ISSUE QUOTE, THE EXTENT AND CONFIGURATION
FLOOR PLAN - PLUMBING AND
OF EXISTING MECHANICAL SYSTEM AND ALLOW FOR
ADDITIONAL REMOVALS AS DETERMINED ON SITE TO MEET
DRAINAGE LAYOUT
1 2 3 4 5 6 7 8 9 THE INTENT OF THE DEMOLITION INDICATED. NO EXTRAS
WILL BE ALLOWED FOR FAILURE OF THE CONTRACTOR IN SCALE
COMPLETING A THOROUGH REVIEW OF THE SITE PRIOR TO
SUBMITTING TENDER PRICE. 1 : 100
PROFESSIONAL SEAL DRAWN DATE

CONTRACT DOCUMENTS: BD 11/27/13


CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART
1 GROUND FLOOR - PLUMBING AND DRAINAGE DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND
CHECKED PRINTED

GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT. MWM 05/28/14


401 1 : 100 CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS, REVIEWED DRAWING No.
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING,
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE
WORK AND DESIGN INTENT.
BD

401
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.

DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE


HEATING LEGEND:

T LOW VOLTAGE ELECTRONIC


B S THERMOSTAT WITH BACNET/LON
COMMUNICATION PROTOCOL TO EMCS
REMOVE EXISTING RADIATION AND
CAP PIPING BACK IN WALL/FLOOR X X EXISTING PIPING TO BE REMOVED

HWS(EX) EXISTING HOT WATER SUPPLY PIPING 1345 ROSEMOUNT AVENUE


CORNWALL, ONTARIO
HWR(EX) EXISTING HOT WATER RETURN PIPING CANADA K6J 3E5
PHONE: 613-933-5602 FAX: 613-936-0335
HWS WWW.WSPGROUP.COM
HOT WATER SUPPLY PIPING

C HWR HOT WATER RETURN PIPING

BALL VALVE

GATE VALVE
D GLOBE VALVE
CIRCUIT SETTER

CUH-* FORCE FLOW HEATER


*- TYPE AS SPECIFIED

1 2 3 4 5 CUH-* CABINET UNIT HEATER TAG


- DESIGNATION
* GPM - WATER FLOW (GPM)
EXISTING EXISTING * LPS - WATER FLOW (L/S)
EXISTING BOILER B-1 BASEMENT GROUND - FAN MOTOR CAPACITY (WATTS)
FLOOR *W *- TYPE AS SPECIFIED

EXISTING BOILER B-1


50ø HWS & HWR SERVING
STAIRS
2 SECOND FLOOR - HEATING REMOVALS
CIRCULATOR PUMP
402 1 : 100
AUTOMATIC AIR VENT C/W BALL VALVE
65ø HWS & HWR
EXISTING 150 SERVING BASEMENT 3-WAY CONTROL VALVE
HWS HEADER EXISTING HOT
WATER TANK
65ø HWS & HWR
SERVING TOP FLOOR 50ø HWS & HWR
SERVING
ENTRANCE NOTE:
65ø HWS & HWR 1. PROVIDE ISOLATION BALL VALVES ON ALL
EXISTING SUMP PIT 50ø HWS & HWR UP BRANCH TAKEOFFS. LOCATE VALVES IN
SERVING 1ST FLOOR
GROUND FLOOR. CORRIDOR CEILING WHERE POSSIBLE.
HP-1
EXISTING 150ø 40ø HWS & HWR
HWR

HWR HEADER SERVING MAIN FLOOR B


HWS

EXISTING EXPANSION EXISTING PUMP REMOVE EXISTING


TANKS AT HIGH LEVEL (TYP.) RADIATION AND
REVISE HWS & HWR BOILER HEADER CAP PIPING BACK IN
EXISTING CHEMICAL HWS HWS WALL/FLOOR
PIPING TO SUIT NEW ZONE BRANCH HWR HWR
FEEDER POT
CONNECTION. CONNECT NEW PIPING 50
APPROX. HERE. EXISTING FILTER EXISTING
EXPANSION TANK
A
C

50ø
D

HWR
EXISTING
GROUND

HWS
FLOOR
50ø
B
REMOVE EXISTING RADIATION AND 1 2 3 4 5
CAP PIPING BACK IN WALL/FLOOR NEW
ADDITION

3 THIRD FLOOR - HEATING REMOVALS


EXISTING
BASEMENT
CUH-1 CUH-1
402 1 : 100

C .5GPM .5GPM 50ø 20ø


ELEV. CUH-1
NEW .031 .031 HWS
E1 1.05GPM
ADDITION 30W 30W HWR
102A 0.066 LPS
20ø 30W
20ø
HWR

D 20ø
HWS

T S
CUH-1 HWR 108
HWS
.8GPM
HWR

.051 20ø S
20ø T
30W 20ø
20ø
HWR

20ø
E
MAIN OFFICE V.P.
HWR

PRINC. BF WC FDK OVERFLOW CUH-1


102 105 50ø
HWS

.64GPM
HWS

CUH-1 104 107 K4


HWS
HWR

.64GPM S 20ø .041


T
S T 30W
.041
30W T
S CUH-1
20ø 20ø 20ø .8GPM CORRIDOR 20ø RHC-1 ERV-1 VEST.
.051 101 50ø HWS
HWR 106
HWS 30W HWR
FOYER 50ø 50ø 50ø 40ø HP-2 4 ISSUED FOR TENDER 5/30/2014
F 100 S 20ø 20ø HWR HWR
20ø
3 ISSUED FOR 95% REVIEW 5/20/2014
HWR HWR S
T T 2 ISSUED FOR 85% REVIEW 2/07/2014
HWS HWS HWS
G 1 ISSUED FOR 50% REVIEW 12/03/2013
T 20ø T 40ø T
S S S No. BY REVISIONS/SUBMISSIONS DATE
CONTROL WC
20ø VALVE K3A
20ø
COLBOURNE & KEMBEL,
CUH-2
1.7GPM
CUH-2 ARCHITECTS INC.
HWS

1.8GPM
0.107
HWR

0.114 739D ARLINGTON PARK PLACE


HWS

30W KINGSTON ONTARIO K7M 8M8


30W
HWS HWR

20ø TEL 613-384-2240 FAX 613-384-1277


info@ckai.ca www.ckai.ca
HWR

HWR HWS
HWR
PROJECT
HWS 20ø
20ø
20ø

CLASSROOM
WINCHESTER PUBLIC SCHOOL
CLASSROOM CLASSROOM K3
DEMOLITION NOTES
ADDITION
K1 K2
EXISTING MECHANICAL SYSTEM SHOWN IS DIAGRAMATIC LOUISE ST. WINCHESTER ONTARIO
AND IS BASED ON ORIGINAL DRAWINGS. THE DRAWING MAY
DRAWING
NOT REPRESENT "AS-BUILT" CONDITIONS. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ON SITE,
PRIOR TO ISSUE QUOTE, THE EXTENT AND CONFIGURATION
OF EXISTING MECHANICAL SYSTEM AND ALLOW FOR GROUND FLOOR HEATING LAYOUT
ADDITIONAL REMOVALS AS DETERMINED ON SITE TO MEET
H THE INTENT OF THE DEMOLITION INDICATED. NO EXTRAS
WILL BE ALLOWED FOR FAILURE OF THE CONTRACTOR IN SCALE
COMPLETING A THOROUGH REVIEW OF THE SITE PRIOR TO
CUH-2
SUBMITTING TENDER PRICE. 1 : 100
1.4GPM PROFESSIONAL SEAL DRAWN DATE
1 2 3 4 5 0.088 6 7 8 9
30W
CONTRACT DOCUMENTS:
BD 11/27/13
CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART CHECKED PRINTED
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT. MWM 05/28/14
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
REVIEWED DRAWING No.
1 GROUND FLOOR - HEATING LAYOUT ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS,
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING,
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE BD
402 1 : 100 WORK AND DESIGN INTENT.

402
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
HVAC LEGEND: REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.
RIGID DUCTWORK
DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE

DUCTWORK WITH ACOUSTIC INSULATION

BD
BALANCING DAMPER

FD
FIRE DAMPER
1345 ROSEMOUNT AVENUE
RHC CORNWALL, ONTARIO
EXISTING EXISTING CANADA K6J 3E5
BASEMENT GROUND FLOOR HOT WATER REHEAT COIL
PHONE: 613-933-5602 FAX: 613-936-0335
FLOOR BDD WWW.WSPGROUP.COM
BACKDRAFT DAMPER

BRANCH RUNOUT CONNECTIONS TO


HVAC LEGEND:
EXIS T N
I GDUCT WORK TO REM AIN RETURN/ EXHAUST GRILL E

REMOVE EXIST ING DUCT W ORK - M AIN CONT RACT

REMOVE EXIST ING DUCTW ORK - SEPARAT E PRICE CEIL INGSUPPLY DIFF USER

NEW DUCTW ORK


SUPPL Y DUCT TO ABOVE / BELOW
RETURNDUCT T OABOVE / BELOW
EXHAUST DUCT TOABOVE / BELOW
F IRE DAM PER F F AN
DIFF USERTAG
A -A- NECK DIAM ET ER(IN)
FD F IRE DAM PER B C -B- T YPE
BALANCINGDAM PER -C- AIRF L OW (CFM )
BD BALANCINGDAM PER

MAIN - 45° CLINCH COLLAR FITTING C/W


DUCT RADIUS EL BOW

DUCT RECT ANGUL AR EL BOW REPRESENTS DESIGNAT O I NOF UNIT S


(X) DENOT ES EXIS T N
I GEQUIP M ENT

BALANCING DAMPER.

RETURN / EXHAUST GRILLE

CEILING SUPPLY DIFFUSER

RECTANGULAR/ROUND SUPPLY DUCT UP

RECTANGULAR/ROUND RETURN DUCT UP

RECTANGULAR/ROUND RETURN DUCT UP

A DIFFUSER TAG
-A- NECK DIAMETER (mm)
B C -B- TYPE
-C- AIR FLOW (L/S)

NOTE:
1. REFER TO ARCHITECTURAL DRAWINGS FOR FIRE
RATING TYPES AND LOCATIONS.
2. PROVIDE DUCT ACCESS DOORS ON EACH SIDE
A OF HEATING COIL TO ALLOW FOR INSPECTION AND
CLEANING.
3. PROVIDE FLEXIBLE DUCT CONNECTIONS TO ERV
SUPPLY AND EXHAUST DUCTWORK.
1
403

EXISTING
203 GROUND FLOOR

B
200ø
NEW G F
CLASSROOM A 55 ADDITION
201 200ø
STAIR 200ø A 96
EXISTING ST3B
BASEMENT
FLOOR
250x250
200ø ROOF PLAN
C BD BD
3900
NEW 150ø 200x200 150ø
ADDITION A 26 A 26 200ø
B 26
102A
D SECOND FLOOR
PRINC. V.P. 200x200 FDK OVERFLOW 1720
MAIN OFFICE 105 150x100 200ø
200ø 104 B 26 K4
102 B 24 A 96
A 64 102A
250x250

GROUND FLOOR
BD 300x200 0
200ø
E 200ø B 192 COURTYARD LEVEL

150ø 150ø 150ø -185


150x100

MOUNT EMCS BASEMENT FLOOR


300x200

BD ERV-1 CONTROL PANEL IN


CEILING SPACE -1445
BD 250x150 200x200 BD 200x200 BD BD BD APPROX. HERE.
200x200
200x200 350x300 500x400
350x300
BD BD BD BDD
B 64 300x250
FOYER BD
400x300 500x350
F 100 ERV-1
300x250 BD
300x200 BD BD 300x200 250x150 RHC-1
BD BD BD BD BD
G
Corridor Section -East View
250x250

1
250x250

150x100

300x200
150x100

150x100
150x100 403 1 : 100
150x100
250x250

300x200 B 24 150x100
B 24
B 212 B 24
BD BD
200ø 200ø
BD BD BD 250x250 BD 4 ISSUED FOR TENDER 5/30/2014
200ø 200ø 200ø
200ø 200ø 200ø 3 ISSUED FOR 95% REVIEW 5/20/2014
A 106 2 ISSUED FOR 85% REVIEW 2/07/2014
A 106
200ø 1 ISSUED FOR 50% REVIEW 12/03/2013
No. BY REVISIONS/SUBMISSIONS DATE

CLASSROOM CLASSROOM CLASSROOM COLBOURNE & KEMBEL,


K1 K2 K3 ARCHITECTS INC.
739D ARLINGTON PARK PLACE
KINGSTON ONTARIO K7M 8M8
TEL 613-384-2240 FAX 613-384-1277
info@ckai.ca www.ckai.ca

PROJECT

H
WINCHESTER PUBLIC SCHOOL
ADDITION
LOUISE ST. WINCHESTER ONTARIO
1 2 3 4 5 6 7 8 9
200ø 200ø 300x200 200ø 300x200 200ø DRAWING
A 106 A 106 B 212 A 106 B 212 A 106

FLOOR PLAN - HVAC LAYOUT

SCALE

1 : 100
5 GROUND FLOOR - HVAC LAYOUT PROFESSIONAL SEAL DRAWN DATE

403 1 : 100
CONTRACT DOCUMENTS: BD 11/27/13
CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART CHECKED PRINTED
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT. MWM 05/28/14
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS, REVIEWED DRAWING No.
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING,
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE BD
WORK AND DESIGN INTENT.

403
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.

DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE

1345 ROSEMOUNT AVENUE


CORNWALL, ONTARIO
CANADA K6J 3E5
PHONE: 613-933-5602 FAX: 613-936-0335
WWW.WSPGROUP.COM

EXISTING SECOND EXISTING GROUND


FLOOR FLOOR ROOF

RD-1
EXISTING GROUND
FLOOR ROOF
B
NEW
ADDITION

RD-1
EXISTING SECOND
FLOOR

C
NEW
ADDITION

RD-1

COND-1 1
E RD-1 RD-1 403

75ø V.T.R.
RD-1

RD-1

ERV-1

F
4 ISSUED FOR TENDER 5/30/2014
3 ISSUED FOR 95% REVIEW 5/20/2014
G
2 ISSUED FOR 85% REVIEW 2/07/2014
1 ISSUED FOR 50% REVIEW 12/03/2013
No. BY REVISIONS/SUBMISSIONS DATE
75ø V.T.R. 75ø V.T.R.

COLBOURNE & KEMBEL,


ARCHITECTS INC.
739D ARLINGTON PARK PLACE
KINGSTON ONTARIO K7M 8M8
TEL 613-384-2240 FAX 613-384-1277
info@ckai.ca www.ckai.ca

PROJECT
RD-1 RD-1 RD-1

WINCHESTER PUBLIC SCHOOL


ADDITION
LOUISE ST. WINCHESTER ONTARIO
DRAWING

H
ROOF PLAN -MECHANICAL LAYOUT

SCALE

1 2 3 4 5 6 7 8 9
1 : 100
PROFESSIONAL SEAL DRAWN DATE
CONTRACT DOCUMENTS:
CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART
BD 11/27/13
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND CHECKED PRINTED
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT.
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS,
MWM 05/28/14
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING, REVIEWED DRAWING No.
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE
WORK AND DESIGN INTENT. BD

404
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

GRILLE AND DIFFUSER SCHEDULE ROOF TOP AIR HANDLING UNIT SCHEDULE DOMESTIC HOT WATER EXPANSION TANK SCHEDULE C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
SPEC SECTION: 23 37 13 UNIT TAG SERVICE MANUFACTURER TANK VOLUME ACCEPTANCE VOLUME REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
STANDARD OF ACCEPTANCE: GREENHECK EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.
DESIGNATION A B DOMESTIC
ET-1 AMTROL THERM-X-TROL ST-12 16.7 L (4.4 US GAL) 12.1 L (3.2 US GAL)
WATER DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE

FUNCTION SUPPLY RETURN EXHAUST ENERGY RECOVERY COIL SUPPLY FAN

MANUFACTURER E.H.PRICE E.H.PRICE


DOMESTIC HOT WATER TANK SCHEDULE
TAG LOCATION MANUFACTURER MODEL TANK VOLUME ELECT. HEATER
AIR SIDE DESIGN CONDITIONS AIR SIDE ELECTRICAL UNIT TAG SERVICE MANUFACTURER MODEL NUMBER
(USGAL) ELEMENT
MODEL SCD 80
FILTERS DOMESTIC HOT
TOTAL HWT-1 BRADFORD WHITE LD-40S3-3 40 4500W/4500W 1345 ROSEMOUNT AVENUE
FLOW ESP MOTOR HP SUMMER SUMMER WINTER FLOW E.A.T. °C L.A.T. °C FLOW ESP MOTOR HP SERVICE WATER HEATER
OPPOSED BLADE DAMPER NO NO SP CORNWALL, ONTARIO
CANADA K6J 3E5
(LPS) (PA) DB DEG. C WB DEG. C DB DEG. C (LPS) (PA) WB / DB WB / DB (LPS) (PA) (V/PH/HZ)
PHONE: 613-933-5602 FAX: 613-936-0335
BORDER T-BAR T-BAR WWW.WSPGROUP.COM
ERV-1 ROOF NEW ADDITION 1086 125 1 MERV 8 30.5 23.3 -25 1086 216 -25.4/-25 7.1/11.6 1086 125 1 208/3/60 GREENHECK ERVE-35-30L PLUMBING AND DRAINAGE PUMP SCHEDULE
FASTENING - - DESIGN
DESIGN HEAD POWER
NOTE: PROVIDE 600 MM HIGH SIESMIC ROOF CURB FOR ERV UNIT TAG LOCATION SERVICE TYPE CAPACITY
(FT.)
MOTOR (W)
(V/ø/Hz)
MANUFACTURER MODEL RPM
(USGPM)
FINISH B12 B12 BUILDING DOMESTIC HOT CLOSED COUPLED DRY
RCP-1 RM. 108
WATER RECIRCULATION PUMP MOTOR CIRCULATOR
5.0 20 117 120/1/60 ARMSTRONG 250SS-LC 3600

ELEVATOR SHAFT SUMP PIT


REMARKS FACE SIZE: SP-1 VEST. 103
PUMP
SUBMERSIBLE 50 50 1.5 HP 230/3/60 MYERS WHR15H-23 3450
610MM X 610MM

REMARKS ALL T-BAR MOUNTED GRILLES AND


ERV HYDRONIC COIL SCHEDULE
DIFFUSERS ARE TO BE COMPATIBLE
WITH AN IMPERIAL CEILING GRID TOTAL HEATING ENTERING AIR DRY LEAVING AIR DRY LEAVING AIR COIL COIL PRESSURE DROP LEAVING WATER
AIR FLOW REMOTE COIL SIZE HEADER SIZE WATER FLOW RATE WATER PRESSURE DROP
SYSTEM. ALL FINISHES SHALL BE CAPACITY BULB BULB VELOCITY (AIR) TEMPERATURE
TESTED TO THE LATEST TAG
APPLICABLE ASTM STANDARDS FOR (CFM) (L/S) (H x L x R x FPI) IN. (H x L x R x FPI) mm (IN.) (mm) (MBH) (KW) (°F) (°C) (°F) (°C) (AFPM) (M/S) (IN. WC) (Pa.) (°F) (°C) (GPM) (L/S) (FT. WC) (KPa.)
DURABILITY AND RESISTANCE TO
DEGRADATION. ERV-1 2300 1086 22.5x32x1/14 570x812.75x1/14 1.5 40 168 49 -13 -25 54.7 12.6 453 2.3 .1 25.4 160 70.8 16.8 1.06 1.5 4.6

TITUS, KREUGER, NAILOR, HART,


ALTERNATES
METALAIRE

HYDRONIC PUMP SCHEDULE CABINET UNIT HEATER SCHEDULE


DESIGNATION LOCATION SERVICE TYPE DESIGN CAPACITY DESIGN MOTOR POWER MANUFACTURER MODEL SIZE RPM NOTES SPEC. SECTION EXTERNAL STATIC
FULL LOAD PRESSURE
AIRFLOW CAPACITY DESIGN HEATING HEATING CAPACITY HOT WATER FLOW
L/s (USGPM) HEAD (FT.) (HP) (V/ø/Hz) ENGINEERED
SERVICE FAN SPEED COIL STYLE
VOLTAGE
AMPACITY
AIR MODEL (V/Hz/Ph.)
(AMPS)
HP-1 EXISTING BOILER ROOM HEATING IN-LINE 1.8785 (29.775) 45 3/4 208/3/60 ARMSTRONG H-64 1-1/2" 1800 (IN. W.C.) (Pa.) (CFM) (L/S) (MBH) (KW) (MBH) (KW) (USGPM) (L/S)

HP-2 CORRIDOR AT RHC-1 HEATING IN-LINE 1.3306 (21.09) 15 1/6 120/1/60 ARMSTRONG S-35 1-1/2" 1800 CUH-1 HEATING 1550 RPM CABINET 120/1/60 3.7 .05 12 185 87 16.10 4.71 16.10 4.71 1.62 0.1022

CUH-2 HEATING 1550 RPM CABINET 120/1/60 3.7 .05 12 245 115 18.67 5.48 18.67 5.48 1.89 0.1192

AI ERV_-EF STATUS AI ERV_ EA WHEEL DP

3 1
DP

EXHAUST ERV_-EF RETURN TO


SPACE
NC

AIR AIR
ENERGY RECOVERY WHEEL

T T
M

N.0. HIGH SPEED


DO ERV_-WHEEL S/S N.C. OFF SPEED
AI ERV_ EXHAUST LAT AI ERV_ RETURN RAT
DO FAN OFF/LO S/S T SPACE TEMPERATURE
ELECTRICAL INTERLOCK
BY MANUFACTURER DO FAN LO/HI S/S SF-
AI FAN STATUS
1 3 2
M

LL

OUTSIDE ERV_-SF H SUPPLY M DO FC -/C VALVE


NC

C
AIR C AIR

H
DP T T
M

AI ERV_ SA WHEEL DP AI ERV_ SAT

AI ERV_ RECLAIM TMP AO H/C CNTRL VALVE RETURN FROM


SPACE
DO CP-ERV_ S/S
DO ERV_-SF S/S
AI CP-ERV_ STATUS
AI ERV_-SF STAT
NOTES : NOTES:
1
PROVIDE A CURRENT SENSING TRANSDUCER FOR STATUS, OVERCURRENT AND UNDERCURRENT SENSING. REFER TO SPECIFICATION .1 ALL CONTROLLERS FOR CABINET FAN COILS ARE TO BE INSTALLED IN THE CORRIDOR CEILING SPACE UNLESS APPROVED OTHERWISE.
FOR DETAILED REQUIREMENTS. .2 RUN CONTROL WIRING FROM CEILING SPACE DOWN TO THE CABINET FAN COILS WITHIN THE STAINLESS STEEL ENCLOSURE.
2
.3 SPEED CONTROL COMBINATIONS SHALL BE LOW/HIGH.
THE LOW LIMIT THERMOSTAT SHALL BE WIRED IN SERIES BY THE ERV MANUFACTURER WITH THE FAN CONTROL CIRCUIT AND SHALL PREVENT THE FANS .4 WHERE THERE ARE TWO CABINET FAN COILS SERVING ONE SPACE, THEY ARE TO BE CONTROLLED IN UNISON BY THE SAME CONTROLLER AND
FROM STARTING WHEN THE LOW LIMIT THERMOSTAT IS IN A LOW LIMIT CONDITION. THE LOW LIMIT THERMOSTAT TO BE PROVIDED WITH THE UNIT AND COILS TO BE INSTALLED OUTPUTS. INPUTS SIGNALS SHALL BE INDEPENDENT EXCEPT THAT ONLY ONE ROOM TEMPERATURE SENSOR SHALL BE REQUIRED.
PREWIRED AND TESTED BY THE UNIT MANUFACTURER. LOW LIMIT TO BE AUTO RESET. IN DUCTWORK
3
EXHAUST FAN ERV_-EF SHALL BE ELECTRICALLY INTERLOCKED TO START WITH THE SUPPLY FAN ERV_-SF BY THE ERV MANUFACTURER.

CONTROL DIAGRAM CONTROL DIAGRAM


ERV MANUFACTURER TO PROVIDE ON BOARD CONTROL FOR DEFROST CONTROLS. DEFROST CONTROL BY DURING THE HEATING MODE, THE HYDRONIC HEATING COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN THE 2 PIPE FAN CABINET COILS FAN COILS:
MANUFACTURER SHALL ALLOW DEFROST CONTROL IF OUTSIDE AIR TEMPERATURE IS BELOW 5°F (ADJUSTABLE) REQUIRED DISCHARGE AIR TEMPERATURE SETPOINT. DURING THE HEATING MODE, THE HEATING COIL CONTROL
AND WHEEL DIFFERENTIAL PRESSURE DROP IS ABOVE SETPOINT. DEFROST CONTROL TO SHUT OFF SUPPLY FAN VALVE SHALL BE CLOSED WHEN THE OUTSIDE TEMPERATURE RISES ABOVE 60°F AND THE CIRCULATING PUMP .1 THE FAN COIL/FORCE FLOW WILL BE PROGRAMMED TO START BASED ON A COMMON TIME OF DAY SCHEDULE OPTIMUM START SEQUENCE, OR NIGHT CYCLE.
FOR AN ADJUSTABLE 5 MIN. TIME PERIOD. WHILE IN DEFROST MODE SUPPLY FAN SHALL RUN FOR 20 MINUTE SHALL BE DISABLED.
PERIOD IN BETWEEN EACH CYCLE OF WHEEL SHUT DOWN. ERV MANUFACTURER TO PROVIDE CONTROL OF .2 DURING THE OCCUPIED PERIOD A GROUPING OF FAN COIL/FORCE FLOW FAN SHALL BE STARTED ON HIGH SPEED BASED ON THE OPTIMUM START TIME, THE
OUTSIDE AND EXHAUST AIR DAMPERS TO OPEN/CLOSE WITH START/STOP OF UNIT. THE HYDRONIC HEATING COIL AND ERV CIRCULATING PUMP SHALL BE OFF DURING MID-SEASON MODE.
SPACE TEMPERATURE SETPOINT SHALL BE SET TO 72°F (22°C) AND SHALL BE MAINTAINED BY ON/OFF CONTROL OF COIL VALVE. UPON REACHING SETPOINT THE
ERV-1 SEQUENCE OF OPERATION ALARMS : GROUPING OF FAN COIL/FORCE FLOWS SHALL BE PLACED INTO LOW SPEED.
THE FAN AND MOTOR SYSTEMS SHALL BE MONITORED AND A CRITICAL ALARM SHALL ANNUNCIATE AT THE EMCS 4 ISSUED FOR TENDER 5/30/2014
THE ERV CONTROLS SEQUENCE SHALL BE STARTED BY A DEDICATED OCCUPANCY TIME SCHEDULE AT THE EMCS. WHEN THE FAN OR MOTOR STATUS AND COMMAND ARE IN OPPOSITE STATES FOR GREATER THAN 5 MINUTES. .3 DURING UNOCCUPIED HOURS THE FAN COIL/FORCE FLOW SHALL BE NIGHT CYCLED TO HIGH SPEED AND SHALL MAINTAIN AN UNOCCUPIED SPACE TEMPERATURE
SETPOINT OF 18°C IN THE HEATING MODE/MID-SEASON AND 27°C IN THE COOLING MODE, AND SHALL BE MAINTAINED BY ON/OFF CONTROL OF THE 3 ISSUED FOR 95% REVIEW 5/20/2014
BUILDING HEATING AND MID-SEASON MODE IS TURNED ON AND OFF BASED ON CALENDAR DAYS. THE ERV CIRCULATING PUMP CURRENT SHALL BE MONITORED BY THE EMCS AND SHALL SEND A CRITICAL ALARM HEATING/COOLING COIL VALVE. 2 ISSUED FOR 85% REVIEW 2/07/2014
IF THE CURRENT IS BELOW SETPOINT FOR GREATER THAN 5 SECONDS AND SHALL SIMULTANEOUSLY DISABLE THE 1 ISSUED FOR 50% REVIEW 12/03/2013
UNOCCUPIED MODE ERV. (THE ERV UPON SHUT DOWN SHALL CLOSE FRESH AIR AND EXHAUST DAMPERS VIA ERV MANUFACTURER'S .4 WHEN THE SPACE TEMPERATURE DROPS 3°F (1.5°C) BELOW (EMCS USER-ADJUSTABLE) SETPOINT THEN THE CABINET FAN COIL SHALL BE PLACED INTO HIGH No. BY REVISIONS/SUBMISSIONS DATE
THE ERV AND ERV CIRCULATING PUMP SHALL BE OFF AND THE OUTSIDE AND EXHAUST AIR DAMPERS (BY ERV CONTROLS.)
SPEED.
MANUFACTURER) SHALL BE CLOSED.
HIGH AND LOW TEMPERATURE ALARMS SHALL BE ANNUNCIATED AT THE OPERATOR WORKSTATION. LIMITS ARE
IF NOT IN HEATING MODE AND AT 4:00AM THE ROOM TEMPERATURE AVERAGE IS GREATER THAN 73°F AND TO BE COORDINATED WITH THE OWNER AND THE CONSULTANT AND SHALL BE SETUP BY THE CONTROLS .5 A LOW SPACE TEMPERATURE ALARM SHALL BE ANNUNCIATED AT THE EMCS WHEN THE SPACE TEMPERATURE FALLS BELOW 7°C (USER-ADJUSTABLE). COLBOURNE & KEMBEL,
OUTDOOR AIR IS LESS THAN 62°F AND GREATER THAN 38°F AND HUMIDITY IS LESS THAN 80%, THEN START
MORNING COOL DOWN BY ENABLING ERV AND STOPPING WHEEL. ONCE AVERAGE ROOM TEMPERATURE IS LESS
CONTRACTOR. ARCHITECTS INC.
THAN 68°F THEN STOP COOL DOWN MODE. THE LOW LIMIT THERMOSTAT SHALL BE MONITORED BY THE EMCS AND SHALL ANNUNCIATE A CRITICAL ALARM
739D ARLINGTON PARK PLACE
OCCUPIED MODE
WHEN THE LOW LIMIT CONDITION EXISTS AND SHUT DOWN THE ERV.
CONTROL SEQUENCE KINGSTON ONTARIO K7M 8M8
TEL 613-384-2240 FAX 613-384-1277
DURING THE OCCUPIED MODE THE ERV AND ERV CIRCULATING PUMP SHALL BE ENABLED BY THE EMCS AND THE THE WHEEL PRESSURE SENSOR SWITCH SHALL BE MONITORED BY THE EMCS AND SHALL ANNUNCIATE A HIGH
ERV CONTROLS SHALL OPEN OUTSIDE AND EXHAUST DAMPERS THROUGH THE ERV UNIT CONTROLS AND ENERGIZE ALARM WHEN THE DIFFERENTIAL PRESSURE IS GREATER THAN 1.4dp (FROST OR PLUGGED WHEEL) AND A LOW info@ckai.ca www.ckai.ca
FANS ERV_-SF AND ERV_-EF. ALARM WHEN THE DIFFERENTIAL PRESSURE IS LESS THAN 0.4dp (DIRTY FILTER OR LOOSE BELT).
PROJECT
DURING THE HEATING MODE, ONCE THE STATUS OF THE FANS AND CIRCULATING PUMP HAS BEEN PROVEN BY THE
CURRENT SENSORS, THE EMCS SYSTEM CONTROL LOOPS SHALL BE ENABLED AND HEATING COIL SHALL BE
MODULATED TO CONTROL THE DISCHARGE AIR TEMPERATURE TO MAINTAIN 65°F.
2 PIPE CABINET FORCE FLOW HEATING SCHEMATIC
DURING THE MID-SEASON WHEN THE SYSTEM IS NOT IN HEATING MODE, IF THE AVERAGE ROOM TEMPERATURE OF
THE ROOMS SERVED BY THE ERV CLIMBS ABOVE AVERAGE ROOM TEMPERATURE SETPOINT AND THE OUTDOOR AIR
WINCHESTER PUBLIC SCHOOL
TEMPERATURE IS BELOW 73°F AND DIFFERENTIAL ENTHALPY CONTROL ALLOWS, THE ERV WHEEL SHALL STOP.
WITH AN OUTDOOR AIR TEMPERATURE ABOVE 73°F, THE WHEEL TURNS. ADDITION
LOUISE ST. WINCHESTER ONTARIO
CONTROL SEQUENCE DRAWING

CLASSROOM ERV-1 CONTROLS SCHEMATIC SCHEDULES

SCALE

As indicated
PROFESSIONAL SEAL DRAWN DATE

CONTRACT DOCUMENTS: BD 11/27/13


CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND CHECKED PRINTED
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT.
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH MWM 05/28/14
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS,
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING, REVIEWED DRAWING No.
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE
WORK AND DESIGN INTENT. BD

405
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

C0PYRIGHT
THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
BE RETURNED TO THE ARCHITECT UPON COMPLETION.
APPLICATIONS: APPLICATIONS: APPLICATIONS:
DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE
1. HOT PIPING LESS THAN NPS 1 1/4 (DN 32mm), COPPER WITH LESS 1. SUSPENDED HOT PIPING, STEEL, AND COPPER WITH HORIZONTAL 1. BOTTOM SUPPORTED HOT PIPING STEEL AND COPPER.
THAN 1" (25mm) HORIZONTAL MOVEMENT DUE TO THERMAL MOVEMENT IN EXCESS OF 1" (25 mm) AND HANGER ROD (MIDDLE WALL WALL
PROVIDE GUIDES (TYPICAL)
EXPANSION. ATTACHMENT) OF 12" (300 mm) OR LESS.

2. HOT PIPING LESS THAN NPS 1 1/4 (DN 32mm), COPPER WITH MORE
THAN 12" (300mm) HANGER ROD ATTACHMENT.
PROVIDE GUIDES (TYPICAL) HYDRONIC PIPING
HYDRONIC
HANGER ROD PIPING
HANGER ROD
FLEXIBLE HOSE EXPANSION FLEXIBLE HOSE EXPANSION
COMPENSATOR (TYPICAL) COMPENSATOR (TYPICAL) 1345 ROSEMOUNT AVENUE
INSULATION (NO CORNWALL, ONTARIO
VAPOUR BARRIER)
CANADA K6J 3E5
PIPE ANCHOR SEE PHONE: 613-933-5602 FAX: 613-936-0335
APPROXIMATELY 18" ENLARGED DETAIL WWW.WSPGROUP.COM
(450 mm) OF PIPE (TYPICAL)
LOCKING NUT
PIPE PLAN COMPENSATORS AT OFFSET
INSULATION (NO PLAN COMPENSATORS AT ELBOWS
HEAVY DUTY VAPOUR BARRIER) SECURE SUPPORTS TO SECURE SUPPORTS TO
CLEVIS HANGER CONCRETE DECK WITH CONCRETE DECK WITH
AS SPECIFIED ROOF TRUSS ANCHORS ANCHORS
SUPPORT NUT HIGH DENSITY INSULATION
25mm POLYISOCYANURATE
ROLLER
FOAM INSULATION (TRYMER).
PIPE
FULL LENGTH OF SADDLE.
STAND 8" X 4" X 3/8" (200 X PROVIDE GUIDES SECURED
100 X 10 mm) PLATE TO STRUCTURE ABOVE
(2 REQ'D) (TYPICAL)

NO VAPOUR
BARRIER
PIPE ANCHOR SEE
BOLT PIPR ROLLER TO ENLARGED DETAIL
STEEL STRUCTURE
ELEVATION (SUPPORT FROM ABOVE) PIPE GUIDE SECTION (SUPPORT FROM ABOVE)
HIGH DENSITY INSULATION
25mm POLYISOCYANURATE ROLLER
PIPE INSULATION SHALL COVER
FOAM INSULATION (TRYMER).
CLEVIS HANGER
FULL LENGTH OF SADDLE.

CONCRETE CONCRETE
DECK PIPE ANCHOR DECK
ENLARGED DETAIL
PIPE SUPPORTS
(TYPICAL)
PIPE SUPPORTS
APPLICATIONS: (TYPICAL)
APPLICATIONS: NOTE:
1. HYDRONIC HOT/COLD PIPING NPS 1 1/4 (DN 32 REFER TO SEISMIC SPECIFICATIONS FOR
mm) AND GREATER: COPPER PIPING WITH LESS 1. COLD PIPING LESS THAN NPS 1 1/4, STEEL & COPPER.
ADDITIONAL BRACING REQUIREMENTS NOT
ELEVATION (SUPPORT FROM BELOW) PIPE GUIDE SECTION (SUPPORT FROM BELOW)
THAN 25mm HORIZONTAL MOVEMENT DUE TO SHOWN ON THIS PIPING DETAIL DRAWING.
THERMAL EXPANSION.

HANGER ROD HANGER ROD

2 EXPANSION COMPANSATOR DETAIL


406 NTS

LOCKING NUT LOCKING NUT

HEAVY DUTY SUPPORT NUT HEAVY DUTY SUPPORT NUT NOTES:


CLEVIS HANGER CLEVIS HANGER SIMPLEX INDOOR CONTROL
1. BASIN ASSEMBLY TO BE C/W ANTI-FLOATATION RING.
AS SPECIFIED AS SPECIFIED PANEL TO BE 208/3/60 C/W 3
2. BASIN TO INCLUDE 50ø SNAP RING FOR POWER AND
FLOAT CIRCUITRY AND MANUAL
FLOAT LEVEL CONTROL CORDS.
RESET & DRY CONTACTS FOR
3. PROVIDE LEVEL CONTROL SUPPORT BRACKET (MYERS
REMOTE ALARM. MYERS MODEL
MODEL CSB-4SS)
NUMBER CP15-03KK. (LOCATE ON
4. CONTROL PANEL TO INCLUDE THREE FLOAT CIRCUITRY
WALL BEHIND BASIN ADJACENT TO
AND DRY CONTACTS FOR REMOTE ALARM. EXTEND
DOOR).
INSULATION C/W ALARM TO EMCS
INSULATION AS SPECIFIED VAPOUR BARRIER
CONNECTIONS BY
CONTINUOUS ELECTRICAL CONTRACTOR.
VAPOUR BARRIER
16 GAUGE ZINC COATED SHEET STEEL (OR 16 GAUGE ZINC COATED SHEET STEEL (OR CONNECT NEW 3"ø (75ø) VENT
AS SPECIFIED) SADDLE AT LEAST 12" (300 AS SPECIFIED) SADDLE AT LEAST 12" (300 FROM NEW SUMP BASIN TO
mm) LONG. mm) LONG. PLUMBING VENTING SYSTEM

V
(WITHIN ADJACENT WALL). 20'-0" (6 m) LEVEL CONTROLS TO
BE MYERS MODEL NUMBER
PIPE HIGH DENSITY INSULATION PIPE WA20NPEO.
25mm POLYISOCYANURATE FLOOR SLAB

300 mm
FOAM INSULATION (TRYMER).

(12")
FULL LENGTH OF SADDLE.

TREAD COVER REFER TO


ARCHITECTURAL DRAWINGS

1 PIPE HANGER DETAILS CONNECT 2"ø (50ø) PRESSURE


DRAIN TO 4"ø (100ø) DRAIN IN 4"ø (100ø) DRAIN C/W
406 NTS ADJACENT CORRIDOR. SEE ACCESSIBLE BACKWATER
VALVE.
PLAN FOR CONTINUATION.

2"ø (50ø) COMPRESSION

4580 mm
CHECK VALVES MODEL RUN 100ø DRAIN LINE

(15')
NUMBER MYERS CVP-150 FROM ELEVATOR SUMP.
C/W UNIONS ON PIPING.

BASIN TO BE 48"ø (1200ø) BY 180" (4.5 m)


MECHANICAL DUCT TO BE
DEEP. MYERS MODEL NUMBER FB48180 4 ISSUED FOR TENDER 5/30/2014
KEPT TIGHT TO CEILING
CEILING S/STUDS C/W SRA-320 2X3" RAIL SYSTEM, 3 ISSUED FOR 95% REVIEW 5/20/2014
TRS-75 UPPER BRACKET, CP-75-2 CHAIN 2 ISSUED FOR 85% REVIEW 2/07/2014
KIT 10'-0", IGB-75-3 INTERMDIATE GUIDE
BRACKET, CR-48 SIMPLEX HINGED COVER. 1 ISSUED FOR 50% REVIEW 12/03/2013
No. BY REVISIONS/SUBMISSIONS DATE

SUMP PUMP TO BE 1 1/2HP,


~1200 mm (~4'-0") 208/3/60 MODEL NUMBER COLBOURNE & KEMBEL,
MYERS WHR15H-03.
ARCHITECTS INC.
739D ARLINGTON PARK PLACE
KINGSTON ONTARIO K7M 8M8
4 ELEVATOR SUMP PUMP DETAIL TEL 613-384-2240 FAX 613-384-1277
info@ckai.ca www.ckai.ca
406 NTS
PROJECT

HOT WATER PIPING

DRAIN PLUG
WINCHESTER PUBLIC SCHOOL
ADDITION
3 HOT WATER PIPE DROP DETAIL LOUISE ST. WINCHESTER ONTARIO
406 NTS DRAWING

DETAILS

SCALE

As indicated
PROFESSIONAL SEAL DRAWN DATE

CONTRACT DOCUMENTS: BD 11/27/13


CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART
CHECKED PRINTED
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT.
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
MWM 05/28/14
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS,
REVIEWED DRAWING No.
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING,
DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE
WORK AND DESIGN INTENT.
BD

406
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057
NOTES:

C0PYRIGHT
CONTRACT DOCUMENTS: THIS DRAWING AND DESIGN ARE THE COPYRIGHT PROPERTY OF
COLBOURNE & KEMBEL, ARCHITECTS INC. AND MUST NOT BE COPIED,
CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART REPRODUCED, OR DISTRIBUTED IN WHOLE OR IN PART WITHOUT THE
DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND EXPRESS WRITTEN CONSENT OF THE ARCHITECT. ISSUED COPIES MUST
GENERAL ARRANGEMENT FOR MECHANICAL SYSTEMS AND EQUIPMENT. BE RETURNED TO THE ARCHITECT UPON COMPLETION.
CONTRACTOR TO COORDINATE LAYOUT OF MECHANICAL SYSTEMS WITH
ARCHITECTURAL, STRUCTURAL, AND ELECTRICAL BUILDING COMPONENTS, DRAWINGS MUST NOT BE SCALED. VERIFY DIMENSIONS ON SITE
NOTES :
AS WELL AS OTHER MECHANICAL SYSTEMS. PROVIDE ADDITIONAL PIPING,
1. BALL OR BUTTERFLY VALVE DUCTING, FITTINGS, SUPPORTS, ETC., REQUIRED TO FACILITATE THE
1 2. CHECK VALVE WORK AND DESIGN INTENT.
3. REDUCING TEE
4. MOTOR LUBRICATION POINTS
5. IN-LINE RECIRCULATION PUMP
6. STAINER
7. BALL VALVE
NOTES: 8. DIAL COMPOUND GAUGE
AU 1. LOCATE PIPING ARRANGEMENT WITHIN CORRIDOR CEILING 9. ADAPTOR FLANGES
ISO TOM SPACE. MAINTAIN CLEARANCE AROUND CONTROL VALVES
2 10. PIPE TO SYSTEM (REFER TO 1345 ROSEMOUNT AVENUE
(TY LAT ATIC PLANS FOR CONTINUATION) CORNWALL, ONTARIO
PIC IO A FORSERVICING.
AL N B IR V 2. PROVIDE ERIE BRAND NORMALLY CLOSED ACTUATORS FOR 3 CANADA K6J 3E5
) AL
L V ENT ALL 3-WAY VALVES. DOMESTIC HOT WATER PHONE: 613-933-5602 FAX: 613-936-0335
AL C/W 8
VE 3. PIPE VALVE AND ACTUATOR SUCH THAT 3-WAY VALVE FAILS RECIRCULATION PUMP (DWRP-1) WWW.WSPGROUP.COM
SU `OPEN'. 4
PP EXISTING COLD
LY 7
TO WATER INLET
FA STRAINER (TYPICAL)
NC P.)
OI E (TY
L LV CHECK VALVE
L VA (TYPICAL)
O THERMOMETER (TYPICAL)
TR 9
RE
TU C ON LOCKSHIELD
RN AY L) GLOBE VALVE
FR
OM 3W P ICA HOT WATER
FA
A (TY 7 RECIRCULATION PIPING.
N
NC NIO REFER TO LAYOUT FOR
OI B U
L
AB ING LOCATIONS OF CAPPED
A NC ) ) 5 ENDS FOR FUTURE
EXPANSION
L AL AL TANK
BA Y 8
UIT YPIC Y PIC PL CONNECTIONS. (ET-1)
C (T (T UP
CIR LVE VE R S
VA AL TE 3
LL
V WA EXISTING HOT
N BA ING
IO LE
D AT WATER OUTLET
E CT EA HE
RN
NN C IC TU
CO ON ON RE 7
LE . RC DR R 6 EXISTING
IB F O H Y TE
N
EX NIO ION LY WA NOTE RELIEF
FL U CT ON ING REVISE COLD WATER INLET VALVE
/W E S AT
C NN ILS HW HE 8 PIPING AS INDICATED AND
CO N CO NIC PROVIDE NEW DHWR SYSTEM. HWT-1
FA DRO
HY

1 ELECTRIC HOT
R WATER TANK
HW

10

1 TYPICAL FAN COIL PIPING ARRANGEMENT 3 DOMESTIC WATER RECIRCULATION PUMP DETAIL 8 DOMESTIC HOT WATER HEATER PIPING SCHEMATIC
407 NTS 407 NTS 407 1 : 50

PIPE TO SYSTEM PIPE TO SYSTEM

DRAIN PRESSURE GAUGE


VALVE AND SECURE ANGLES AND U-CHANNELS BLOCK WALL
DRAIN TO BLOCK WALL WITH 75mm (3")
CAP VALVE AND LONG SCREWS.
VERTICAL IN- CAP SECURE SINGLE HOLE PIPE CLAMP
LINE PUMP TO U-CHANNEL C/W GASKET TO
BALL OR PREVENT DIELECTRIC.
BUTTERFLY 22mm (7/8") U-CHANNEL
VALVE
GLOBE VALVE 14 GAUGE #304 STAINLESS STEEL,
32mm x 32mm x 4.8mm #4 FINISH PIPE COVER. COVER TO
BALL VALVE (TYP.) (1 1/4" x 1 1/4" x 3/16") BE ONE CONTINUOUS PIECE FROM
STAINLESS STEEL ANGLE WALL MOULDINF POP RIVETED TO
CHECK VALVE SECURED TO BLOCK WALL STAINLESS STEEL TO CARRY
AT 24" 0/C. CEILING.
6mm (1/4") ROUNDED CORNERS.
COPPER PIPE

LONG RADIUS ELBOW INSULATION CHILLED/HOT WATER PIPING. DO


NOT PENETRATE VAPOUR
BARRIER WITH SUPPORTS.
COMBINATION
STRAINER/SUCT SPOOL PIECE. LENGTH 3 TO
ION GUIDE 4 TIMES PIPE DIAMETER VIBRATION ISOLATOR PIPE CLAMP

2 TYPICAL INLINE PUMP DETAIL 5 TYPICAL HYDRONIC PIPING ENCLOSURE TO SURFACE MOUNTED CABINET FAN COILS
407 NTS 407 NTS

4 ISSUED FOR TENDER 5/30/2014


3 ISSUED FOR 95% REVIEW 5/20/2014
2 ISSUED FOR 85% REVIEW 2/07/2014
1 ISSUED FOR 50% REVIEW 12/03/2013
CIRCUIT BALANCING
VALVE (TYPICAL) No. BY REVISIONS/SUBMISSIONS DATE

CHECK VALVE
(TYPICAL) AUTO AIR VENT (TYP) COLBOURNE & KEMBEL,
AAV C/W BALL VALVE
VENT STACK AND FLASHING CAP ARCHITECTS INC.
CAST DOME STRAINER CWR/HWR
SUPPLIED BY DIV. 20 AND
INSTALLED BY ROOFER. ENSURE 3-WAY CONTROL VALVE 739D ARLINGTON PARK PLACE
ROOF DRAIN ASSEMBLY
CAP DOES NOT RESTRICT VENT KINGSTON ONTARIO K7M 8M8
SUPPLIED BY DIV. 20 AND FIRST LAYER OF ROOF MEMBRANE TO
OPENING. TEL 613-384-2240 FAX 613-384-1277
INSTALLED BY ROOFER RUN UNDER ROOF DRAIN COLLAR. NC C info@ckai.ca www.ckai.ca
SECOND LAYER TO RUN BETWEEN
900x900 DISHED AREA ROOF DRAIN CAP AND COLLAR. NO SIZE LINE AND VALVES
THREE TIMES SMALLER PROJECT
THAN SUPPLY
300 min.

1% SLOPE 1% SLOPE
40

FASTEN DECK FLANGE TO


ROOF MEMBRANE CWS/HWS CIRCUIT BALANCING VALVE
(TYPICAL). WINCHESTER PUBLIC SCHOOL
ADDITION
GLOBE BYPASS
VALVE (NC) FLEXIBLE CONNECTION
LOUISE ST. WINCHESTER ONTARIO
(AS REQUIRED)
CIRCULATOR DRAWING
PRESSURE TAP
(TYPICAL)
SEAL VAPOUR RETARDER TO
ROOF DRAIN COLLAR WITH
PRESSURE GAUGE (TYP) DETAILS
PLASTIC CEMENT.
REFER TO ARCH. PLANS TEMPERATURE GAUGE (TYP)
FOR ROOF COOLING COIL OR
CONSTRUCTION DETAILS. DECK CLAMP HEATING COIL SCALE

REFER TO ARCHITECTURAL
PLANS FOR ROOF SEAL VAPOUR RETARDER M.J. COUPLING As indicated
CONSTRUCTION DETAILS. TO VENT PIPE WITH BALL OR BUTTERFLY VALVE (TYP)
PLACTIC CEMENT. PROFESSIONAL SEAL DRAWN DATE
INSULATED STORM PIPE
MINERAL FIBER PIPE
VENT STACK
UNION OR FLANGE (TYP) BD 11/27/13
INSULATION. DRAIN C/W CAP & CHAIN (TYP)
CHECKED PRINTED

MWM 05/28/14
REVIEWED DRAWING No.
6 TYPICAL PLUMBING VENT DETAIL 7 TYPICAL ROOF DRAIN DETAIL 4 HEATING/COOLING COIL AND MIXING STATION DETAIL BD
407 NTS 407 NTS 407 NTS

407
PROJECT No.
NOT FOR PERMIT OR CONSTRUCTION
WITHOUT SEAL AND ISSUED NOTE 14-057

Potrebbero piacerti anche