BK Bridge - Montgomery
Coastal Resilience
October 2, 2019
Public Meeting - Design Progress for Two Bridges Neighborhood Project
PS 2 Meyer London
Agenda
1 Lower Manhattan Coastal Resiliency

2 Project Recap

3 Design Updates

4 Open House

2
1 Lower Manhattan Coastal Resiliency
Flood Risk

Storm Surge

Sea Level Rise (SLR)

3
1 Lower Manhattan Coastal Resiliency
New York City is
implementing
$500M in on-land
capital projects in
Lower Manhattan
and advancing a
Master Plan for
FiDi-Seaport

4
1 Lower Manhattan Coastal Resiliency
The BK Bridge-
Montgomery
Coastal Resilience
(BMCR) project in
the Two Bridges
neighborhood will
reduce flooding
while maintaining the
community’s views
and access to the
waterfront.

5
1 Lower Manhattan Coastal Resiliency
Flood damage in Two Bridges from Hurricane Sandy

6
1 Lower Manhattan Coastal Resiliency
Two Bridges Neighborhood - 2050s 100-Year Floodplain

PIER 35

MURRY
BERGTRAUM
TANAHEY FIELD
PLAYGROUND

NYCHA
SMITH HOUSES

7
2 Project Recap
2016 2017 2018 2019 2020 2021 2022

Brooklyn Bridge - Montgomery Coastal Resilience Timeline

4
Feasibility Rounds of
Community

Study
Engagement

Refined Coastal
Analysis
Design 3
Community engagement activities to include:
Development Public Meetings Community
Engagement Will
Continue During

• Large-format public meetings


• Quarterly updates and regular touchpoints with
Construction Construction

community board and elected officials


Fall Winter Summer
• Briefings for housing TAs
2019 2020 2020
• ‘Office hours’ tabling sessions in the community
• LinkNYC advertising Construction
Construction Starts Spring
You are here Preparation 2021
Period

Summer 2016 to Fall 2018 to Spring 2019 to Spring 2021 to


Summer 2018 Spring 2019 Summer 2020 Spring 2024
8
2 Project Recap
We heard from the Two Bridges community that the project
should try to achieve these goals:

Provide Flood Protection and


Preserve Views + Access
Resilience

Integrate Infrastructure into


Distribute Program Equitably
Public Realm

9
2 Project Recap
Preserve Views + Access

CATHERINE SLIP MARKET SLIP PIKE SLIP RUTGERS SLIP

10
2 Project Recap
Distribute Program Equitably

FITNESS PARK BASKETBALL COURTS FISHING AREA SEATING / OBSERVATION


AREA

11
2 Project Recap
Integrate Infrastructure into Public Realm

FLOOD REDUCTION PUBLIC SPACE

FLOOD RISK REDUCTION PUBLIC BENEFIT

12
3 Design Updates

Resilience Infrastructure

Raised Platform (Sea Level Rise)

Alignment - Location of Infrastructure

13
3 Design Updates
Infrastructure Toolkit
To preserve views and access along the waterfront, the
project will utilize an infrastructure toolkit that combines
fixed structures with deployable flood gates.

Flip Up Barrier: Sunny Day Roller Gates & Fixed Structures: Sunny Day

14
3 Design Updates
Infrastructure Toolkit
To preserve views and access along the waterfront, the
project will utilize an infrastructure toolkit that combines
fixed structures with deployable flood gates.

Flip Up Barrier: Deployed Roller Gates & Fixed Structures: Deployed

15
3 Design Updates
Raised Platform to Address Sunny Day Tidal Flooding from SLR

Bike Lane Existing Esplanade

Existing Existing
Elev +5.5 Elev +6
Existing Grade

Future Sunny Day Tidal Flooding


Current sea level

16
3 Design Updates
Raised Platform to Address Sunny Day Tidal Flooding from SLR

Existing Esplanade
Bike Lane Proposed
Elev +7

Existing Existing
Elev +5.5 Elev +6
Existing Grade

Future Sunny Day Tidal Flooding


Current sea level

17
3 Design Updates
Deployed Flood Infrastructure

Proposed
Elev +18.5

Bike Lane Flip-up Gate

Existing Existing
Elev +5.5 Elev +6
Existing Grade

2050s 100-year Storm Surge


Current sea level

18
TWO BRIDGES | PROJECT OVERVIEW
Design
3FLOOD Updates
PROTECTION ALIGNMENT

Flood Protection Alignment - Location of Infrastructure

Site Constraints Line of Protection Line of Protection


Existing Infrastructure Sunny Day Deployed

DRAFT FOR INTERNAL REVIEW ONLY


19
3 Design Updates
Flood Protection Alignment

PIER 35 Enlargement #3

MURRY BERGTRAUM
FIELD
TANAHEY
PLAYGROUND

Enlargement #2
NYCHA
SMITH HOUSES

Flip-up Gates
Roller Gates
Enlargement #1
Fixed Structure

2050s 100-year Floodplain

20
3 Design Updates
Enlargement 1
Flip-up gates are used as much as possible to
allow for waterfront views and access.

NYCHA
SMITH HOUSES

Flip-up Gates
Roller Gates
Fixed Structure

2050s 100-year Floodplain

21
3 Design Updates
Enlargement 2
Flip-up gates are used as much as possible to
allow for waterfront views and access.

Fixed Structure and Roller Gates are used to


UNDERGROUND
avoid underground utility conflicts. UTILITIES

FIXED STRUCTURE

ROLLER GATE

FLIP-UP GATE

Flip-up Gates
Roller Gates
Fixed Structure

2050s 100-year Floodplain

22
3 Design Updates
Enlargement 3
Flip-up gates are used as much as possible
to allow for waterfront views and access.
Fixed Structure and Roller Gates are used:
• to avoid underground utility conflicts
FIXED STRUCTURE
• where waterfront views and access are
already obstructed by existing buildings UNDERGROUND
UTILITIES

PIER 36
ROLLER GATE

FLIP-UP GATE

Flip-up Gates
PIER 35 Roller Gates
Fixed Structure

2050s 100-year Floodplain

23
3 Design Updates
BMCR Without Drainage Intervention

Storm surge and sea


level rise decrease
the system’s ability to
discharge, leading to
street and basement
flooding.

24
3 Design Updates
BMCR With Drainage Intervention

The proposed drainage


system will allow
additional flow capacity
to the interceptor pipe,
reducing the risk of
street and basement
flooding.

25
3 Design Updates

North

The BMCR and ESCR drainage systems


will be connected so that stormwater flows
to the Manhattan Pump Station and gets
pumped to and treated at the Newtown
Creek Wastewater Treatment Plant.

26
3 Design Updates
Project Coordination
Pier 35

East River Esplanade


Package 3

East River Esplanade


Package 4

Brooklyn Bridge
Esplanade

27
3 Design Updates
Existing and Planned Public Amenities

D
BOAR ING S ARE A
TE ES
N

A
SK

FI T
ALL
TB
TH

F
UND PA

SO
UND RO E
RO YG
PIER 35

BIK
YG

A
PL
A
PL

MURRY BASK
E T

BERGTRAUM

BA
TANAHEY

L
Y
KE

L COURTS
FIELD
C
HO

PLAYGROUND RF
IELD
CE
C
SO

Currently Under
KE
TBALL COU Construction
S

RT
BA

NYCHA
SMITH HOUSES

S & GAMES
RT
O
SP

Planned

28
3 Design Updates
2016-2018 Community Input

29
3 Design Updates
Impacted Program to Replace or Remove

Community feedback has shown


The existing program includes:
preference for other program over
Fitness Areas, Bocce Ball,
the existing bocce ball court; the
Basketball, Turf Field, Seating,
synthetic turf field will be replaced
Promenade, Bike Lane, Game
with other small sports program.
Tables

FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

30
3 Design Updates
Impacted Program to Replace or Remove

FUTURE BBE

FITNESS LIMIT OF WORK


FUTURE BBE SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

31
3 Design Updates
Impacted Program to Replace or Remove
CATHERINE MARKET
BIKE RACKS
SLIP REDESIGN+
SLIP
RELOCATE BLEACHER / BLEACHER / FITNESS
SEATING SEATING REDESIGN+
REDESIGN+ REDESIGN+ RELOCATE
RELOCATE RELOCATE

FITNESS FITNESS BLEACHER / BLEACHER /


REDESIGN+ REDESIGN IN SEATING SEATING
RELOCATE PLACE REDESIGN+ REDESIGN+
RELOCATE RELOCATE

FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

32
3 Design Updates
Impacted Program to Replace or Remove
PIKE BIKE RACKS RUTGERS
SLIP REDESIGN+ SLIP
RELOCATE

BASKETBALL FITNESS
TURF FIELD REDESIGN+ BOCCE BALL REDESIGN IN
REPLACE WITH RELOCATE REMOVE PLACE
OTHER PROGRAM

FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

33
3 Design Updates
Proposed Project Program

COLEMAN
PLAYGROUND

TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD

PIER 35

PLAZA FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

34
3 Design Updates
Proposed Project Program

COLEMAN
PLAYGROUND

TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD

PLAZA FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

35
3 Design Updates
Proposed Program

COLEMAN
PLAYGROUND

TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD

PLAZA FITNESS LIMIT OF WORK


SPORTS BBE PROJECT LIMIT
BIKE PATH SEATING/GLIDERS/TABLES
BIKE RACK

36
4 Open House

Please join us in activities to learn about the City’s


project to prepare the Two Bridges neighborhood
for climate change.

37
4 Open House

Station 1: Station 2: Station 3: Station 4:


Project Drainage Proposed Proposed
Context System Alignment Programming
Overview

38
4 Open House
KEY

STATION 1:
PROJECT RECAP

STATION 2:
DRAINAGE

STATION 3:
ALIGNMENT

STATION 4:
PROGRAM

KIDS
TABLE

FOOD

PRESENTATION

SIGN-IN
WELCOME

Board 26x36”

Board 36x48”

PS Screen

Rented Screen

CHARS

39
STAY IN TOUCH:

www.nyc.gov/lmcr @NYClimate @NYClimate