BK Bridge - Montgomery
Coastal Resilience
October 2, 2019
Public Meeting - Design Progress for Two Bridges Neighborhood Project
PS 2 Meyer London
Agenda
1 Lower Manhattan Coastal Resiliency
2 Project Recap
3 Design Updates
4 Open House
2
1 Lower Manhattan Coastal Resiliency
Flood Risk
Storm Surge
3
1 Lower Manhattan Coastal Resiliency
New York City is
implementing
$500M in on-land
capital projects in
Lower Manhattan
and advancing a
Master Plan for
FiDi-Seaport
4
1 Lower Manhattan Coastal Resiliency
The BK Bridge-
Montgomery
Coastal Resilience
(BMCR) project in
the Two Bridges
neighborhood will
reduce flooding
while maintaining the
community’s views
and access to the
waterfront.
5
1 Lower Manhattan Coastal Resiliency
Flood damage in Two Bridges from Hurricane Sandy
6
1 Lower Manhattan Coastal Resiliency
Two Bridges Neighborhood - 2050s 100-Year Floodplain
PIER 35
MURRY
BERGTRAUM
TANAHEY FIELD
PLAYGROUND
NYCHA
SMITH HOUSES
7
2 Project Recap
2016 2017 2018 2019 2020 2021 2022
4
Feasibility Rounds of
Community
Study
Engagement
Refined Coastal
Analysis
Design 3
Community engagement activities to include:
Development Public Meetings Community
Engagement Will
Continue During
9
2 Project Recap
Preserve Views + Access
10
2 Project Recap
Distribute Program Equitably
11
2 Project Recap
Integrate Infrastructure into Public Realm
12
3 Design Updates
Resilience Infrastructure
13
3 Design Updates
Infrastructure Toolkit
To preserve views and access along the waterfront, the
project will utilize an infrastructure toolkit that combines
fixed structures with deployable flood gates.
Flip Up Barrier: Sunny Day Roller Gates & Fixed Structures: Sunny Day
14
3 Design Updates
Infrastructure Toolkit
To preserve views and access along the waterfront, the
project will utilize an infrastructure toolkit that combines
fixed structures with deployable flood gates.
15
3 Design Updates
Raised Platform to Address Sunny Day Tidal Flooding from SLR
Existing Existing
Elev +5.5 Elev +6
Existing Grade
16
3 Design Updates
Raised Platform to Address Sunny Day Tidal Flooding from SLR
Existing Esplanade
Bike Lane Proposed
Elev +7
Existing Existing
Elev +5.5 Elev +6
Existing Grade
17
3 Design Updates
Deployed Flood Infrastructure
Proposed
Elev +18.5
Existing Existing
Elev +5.5 Elev +6
Existing Grade
18
TWO BRIDGES | PROJECT OVERVIEW
Design
3FLOOD Updates
PROTECTION ALIGNMENT
PIER 35 Enlargement #3
MURRY BERGTRAUM
FIELD
TANAHEY
PLAYGROUND
Enlargement #2
NYCHA
SMITH HOUSES
Flip-up Gates
Roller Gates
Enlargement #1
Fixed Structure
20
3 Design Updates
Enlargement 1
Flip-up gates are used as much as possible to
allow for waterfront views and access.
NYCHA
SMITH HOUSES
Flip-up Gates
Roller Gates
Fixed Structure
21
3 Design Updates
Enlargement 2
Flip-up gates are used as much as possible to
allow for waterfront views and access.
FIXED STRUCTURE
ROLLER GATE
FLIP-UP GATE
Flip-up Gates
Roller Gates
Fixed Structure
22
3 Design Updates
Enlargement 3
Flip-up gates are used as much as possible
to allow for waterfront views and access.
Fixed Structure and Roller Gates are used:
• to avoid underground utility conflicts
FIXED STRUCTURE
• where waterfront views and access are
already obstructed by existing buildings UNDERGROUND
UTILITIES
PIER 36
ROLLER GATE
FLIP-UP GATE
Flip-up Gates
PIER 35 Roller Gates
Fixed Structure
23
3 Design Updates
BMCR Without Drainage Intervention
24
3 Design Updates
BMCR With Drainage Intervention
25
3 Design Updates
North
26
3 Design Updates
Project Coordination
Pier 35
Brooklyn Bridge
Esplanade
27
3 Design Updates
Existing and Planned Public Amenities
D
BOAR ING S ARE A
TE ES
N
A
SK
FI T
ALL
TB
TH
F
UND PA
SO
UND RO E
RO YG
PIER 35
BIK
YG
A
PL
A
PL
MURRY BASK
E T
BERGTRAUM
BA
TANAHEY
L
Y
KE
L COURTS
FIELD
C
HO
PLAYGROUND RF
IELD
CE
C
SO
Currently Under
KE
TBALL COU Construction
S
RT
BA
NYCHA
SMITH HOUSES
S & GAMES
RT
O
SP
Planned
28
3 Design Updates
2016-2018 Community Input
29
3 Design Updates
Impacted Program to Replace or Remove
30
3 Design Updates
Impacted Program to Replace or Remove
FUTURE BBE
31
3 Design Updates
Impacted Program to Replace or Remove
CATHERINE MARKET
BIKE RACKS
SLIP REDESIGN+
SLIP
RELOCATE BLEACHER / BLEACHER / FITNESS
SEATING SEATING REDESIGN+
REDESIGN+ REDESIGN+ RELOCATE
RELOCATE RELOCATE
32
3 Design Updates
Impacted Program to Replace or Remove
PIKE BIKE RACKS RUTGERS
SLIP REDESIGN+ SLIP
RELOCATE
BASKETBALL FITNESS
TURF FIELD REDESIGN+ BOCCE BALL REDESIGN IN
REPLACE WITH RELOCATE REMOVE PLACE
OTHER PROGRAM
33
3 Design Updates
Proposed Project Program
COLEMAN
PLAYGROUND
TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD
PIER 35
34
3 Design Updates
Proposed Project Program
COLEMAN
PLAYGROUND
TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD
35
3 Design Updates
Proposed Program
COLEMAN
PLAYGROUND
TANAHEY MURRY
PLAYGROUND BERGTRAUM FIELD
36
4 Open House
37
4 Open House
38
4 Open House
KEY
STATION 1:
PROJECT RECAP
STATION 2:
DRAINAGE
STATION 3:
ALIGNMENT
STATION 4:
PROGRAM
KIDS
TABLE
FOOD
PRESENTATION
SIGN-IN
WELCOME
Board 26x36”
Board 36x48”
PS Screen
Rented Screen
CHARS
39
STAY IN TOUCH:
40